Category:INSPECTION REPORT
MONTHYEARIR 05000458/19990121999-10-19019 October 1999 Insp Rept 50-458/99-12 on 990822-1002.Non-cited Violations Noted.Major Areas Inspected:Operations,Engineering, Maintenance & Plant Support IR 05000458/19990101999-09-15015 September 1999 Insp Rept 50-458/99-10 on 990830-0903.No Violations Noted. Major Areas Inspected:Licensed Operators Requalification Program IR 05000458/19990081999-09-0808 September 1999 Insp Rept 50-458/99-08 on 990711-0821.Noncited Violations Identified.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000458/19990111999-08-17017 August 1999 Insp Rept 50-458/99-11 on 990719-23.No Violations Noted. Major Areas Inspected:Licensee Physical Security Program IR 05000458/19990091999-08-16016 August 1999 Replacement Pages 9-18 for Insp Rept 50-458/99-09 Issued on 990730 ML20210N1901999-08-0404 August 1999 Insp Rept 50-458/99-07 on 990530-0710.One Violation of NRC Requirements Occurred & Being Treated as Ncv.Major Areas Inspected:Aspects of Licensee,Operations,Maint,Engineering & Plant Support ML20210K1471999-07-30030 July 1999 Insp Rept 50-458/99-09 on 990510-28 with in-office Insp Until 990701.Noncited Violations Identified.Major Areas Inspected:Review of Licensee Actions Re Testing & Cleaning of Auxiliary Bldg Unit Coolers ML20196L0551999-07-0606 July 1999 Revised Pages 4 of Report Details Section & 2 of Rept Attachment for Insp Rept 50-458/99-03.Corrections Made to Tracking Numbers Assigned to Seven Noncited Violations & to SRO Location During Refueling Activities IR 05000458/19990041999-06-30030 June 1999 Insp Rept 50-458/99-04 on 990412-16 & 28-29.Five Violations Occurred & Being Treated as Noncited Violations.Major Areas Inspected:Portions of Radiation Protection Program,Including Exposure Controls & Radiation Technical & Worker Practices IR 05000458/19990051999-06-18018 June 1999 Insp Rept 50-458/99-05 on 990418-0529.Nonccited Violations Noted.Major Areas Inspected:Aspects of Licensee Operations, Engineering,Maint & Plant Support IR 05000458/19990031999-05-18018 May 1999 Insp Rept 50-458/99-03 on 990307-0417.Noncited Violations Noted.Major Areas Inspected:Operation,Maintenance, Engineering & Plant Support IR 05000458/19990061999-05-15015 May 1999 Insp Rept 50-458/99-06 on 990419-23.No Violations Noted. Major Areas Inspected:Inservice Exam Program Plan & Schedule,Implementation of Program Plan for Facility & Maint & Engineering Followup Review of Previous Insp Findings ML20205A4601999-03-26026 March 1999 Insp Rept 50-458/98-10 on 990222-26.Violations Noted.Major Areas Inspected:Radiation Work Permit Program Implementation from Oct 1997 to Feb 1999 & Problem Identification & Resolution Program as Applied to Program Deficiencies IR 05000458/19990021999-03-26026 March 1999 Insp Rept 50-458/99-02 on 990124-0306.Violations Noted.Major Areas Inspected:Licensee Operations,Maint,Engineering & Plant Support IR 05000458/19990011999-01-25025 January 1999 Insp Rept 50-458/99-01 on 990104-08.No Violations Noted. Major Areas Inspected:Licensee Physical Security Program Including Alarm Stations,Communications,Access Control of Personnel,Packages,Vehicles & Assessment Aids IR 05000458/19980201999-01-0707 January 1999 Insp Rept 50-458/98-20 on 981101-1212.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000458/19980161998-12-29029 December 1998 Insp Rept 50-458/98-16 on 980730-0807.Violations Noted. Major Areas Inspected:Engineering & Fire Protection.Also Reviewed,Status of Various Programs Which Were Planned or in Progress ML20198N9311998-12-29029 December 1998 Insp Rept 50-458/98-16 on 980730-0807.Violations Noted. Major Areas Inspected:Engineering & Fire Protection.Also Reviewed,Status of Various Programs Which Were Planned or in Progress IR 05000458/19980181998-11-30030 November 1998 Insp Rept 50-458/98-18 on 980920-1031.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20196G5161998-11-25025 November 1998 Insp Rept 50-458/98-10 Has Been Canceled.No Insp Rept Will Be Issued IR 05000458/19980191998-11-20020 November 1998 Insp Rept 50-458/98-19 on 981019-23.No Violations Noted. Major Areas Inspected:Operations IR 05000458/19980131998-10-27027 October 1998 Insp Rept 50-458/98-13 on 980608-12,22-26 & 0824-28.Apparent Violations Being Considered for Escalated Enforcement Action.Major Areas Inspected:Operations,Maint & Engineering IR 05000458/19980141998-10-21021 October 1998 Insp Rept 50-458/98-14 on 980928-1002.No Violations Noted. Major Areas Inspected:Operational Status of Licensee Emergency Preparedness Program IR 05000458/19980171998-10-0505 October 1998 Insp Rept 50-458/98-17 on 980809-0919.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000458/19980151998-08-28028 August 1998 Insp Rept 50-458/98-15 on 980628-0808.No Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support IR 05000458/19980121998-07-29029 July 1998 Insp Rept 50-458/98-12 on 980517-0627.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000458/19980071998-06-0808 June 1998 Insp Rept 50-458/98-07 on 980518-21.No Violations Noted. Major Areas Inspected:Implementation of Radiological Environ Monitoring & Meteorological Monitoring Programs IR 05000458/19980081998-06-0505 June 1998 Insp Rept 50-458/98-08 on 980405-0516.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000458/19980111998-06-0404 June 1998 Insp Rept 50-458/98-11 on 980518-21.No Violations Noted. Major Areas Inspected:Maint IR 05000458/19980061998-05-19019 May 1998 Insp Rept 50-458/98-06 on 980427-0501.No Violations Noted. Major Areas Inspected:Implementation of Liquid & Gaseous Radioactive Effluent Waste Mgt Program IR 05000458/19980091998-04-30030 April 1998 Informs That Insp Rept 50-458/98-09 Has Been Canceled ML20217A4801998-04-17017 April 1998 Insp Rept 50-458/98-05 on 980222-0404.Violations Noted. Major Areas Inspected:Operations,Main,Engineering & Plant Support ML20217B4951998-03-24024 March 1998 Insp Rept 50-458/98-03 on 980223-26.Violations Noted.Major Areas Inspected:Review of Radiation Protection Program Activities IR 05000458/19972011998-03-20020 March 1998 Fire Protection Insp Rept 50-458/97-201 on 970615-20, 0629-0703,0819,980120 & 0305.No Violations Noted.Major Areas Inspected:Comprehensive Evaluation of Fire Protection Program & Post Fire Safe Shutdown Capability IR 05000458/19980041998-03-19019 March 1998 Insp Rept 50-458/98-04 on 980111-0221.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20203L8831998-03-0404 March 1998 Insp Rept 50-458/98-01 on 980210-13.No Violations Noted. Major Areas Inspected:Licensee Performance & Capabilities During Fullscale,Biennial Exercise of Emergency Plan & Implementation Procedures ML20202B9401998-02-0606 February 1998 Insp Rept 50-458/97-19 on 971130-980110.Violations Noted. Major Areas Inspected:Licensee Operations,Maint,Engineering & Plant Support IR 05000458/19970201998-02-0505 February 1998 Insp Rept 50-458/97-20 on 971008-15.Violations Noted.Major Areas Inspected:Plant Support IR 05000458/19980021998-02-0202 February 1998 Insp Rept 50-458/98-02 on 980112-16.No Violations Noted. Major Areas Inspected:Licensee Physical Security Program, Including Access Authorization,Alarm Stations,Communication, Access Control of Personnel & Security Event Logs IR 05000458/19970181998-01-0606 January 1998 Insp Rept 50-458/97-18 on 971208-12.No Violations Noted. Major Areas Inspected:Maint & Engineering IR 05000458/19970121997-12-29029 December 1997 Insp Rept 50-458/97-12 on 971203-12.No Violations Noted. Major Areas Inspected:Licensed Operator Requalification Program Following Guidelines in Insp Procedure 71001 ML20197G6191997-12-24024 December 1997 Insp Rept 50-458/97-17 on 971012-1129.Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support IR 05000458/19970151997-11-17017 November 1997 Insp Rept 50-458/97-15 on 970922-1017.Violations Noted: Inadequate Procedrual Controls for Bus Restoration Contributed to Loss of Shutdown Cooling for 17 Min & Failure to Maintain Adequate Procedures IR 05000458/19970141997-11-14014 November 1997 Insp Rept 50-458/97-14 on 970831-1011.Violation Noted. Major Areas Inspected:Operation,Maint,Enginerring & Plant Support IR 05000458/19970161997-10-28028 October 1997 Insp Rept 50-458/97-16 on 970929-1003.No Violations Noted. Major Areas Inspected:Operations & Maint IR 05000458/19970131997-09-26026 September 1997 Insp Rept 50-458/97-13 on 970720-0830.Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support IR 05000458/19970031997-09-10010 September 1997 Insp Rept 50-458/97-03 on 970804-08.Violations Noted.Major Areas Inspected:Implementation of Solid Radwaste Mgt & Radwaste & Matls Transportation Programs IR 05000458/19973011997-08-20020 August 1997 Insp Rept 50-458/97-301 on 970728-0801.No Violations Noted. Major Areas Inspected:Operations Examiners Evaluated Competency of Two Senior Reactor Operator & Three Reactor Operator License Applicants for Issuance of Licenses IR 05000458/19970101997-08-0606 August 1997 Insp Rept 50-458/97-10 on 970608-0719.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20149H1441997-07-21021 July 1997 Partially Withheld Insp Rept 50-458/97-11 on 970623-27.Major Areas Inspected:Specific Areas of Physical Security Program Including Review of Records & Repts,Testing & Maint,Vital Area Barriers & Detection Aids & Alarm Stations 1999-09-08
[Table view] Category:NRC-GENERATED
MONTHYEARIR 05000458/19990121999-10-19019 October 1999 Insp Rept 50-458/99-12 on 990822-1002.Non-cited Violations Noted.Major Areas Inspected:Operations,Engineering, Maintenance & Plant Support IR 05000458/19990101999-09-15015 September 1999 Insp Rept 50-458/99-10 on 990830-0903.No Violations Noted. Major Areas Inspected:Licensed Operators Requalification Program IR 05000458/19990081999-09-0808 September 1999 Insp Rept 50-458/99-08 on 990711-0821.Noncited Violations Identified.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000458/19990111999-08-17017 August 1999 Insp Rept 50-458/99-11 on 990719-23.No Violations Noted. Major Areas Inspected:Licensee Physical Security Program IR 05000458/19990091999-08-16016 August 1999 Replacement Pages 9-18 for Insp Rept 50-458/99-09 Issued on 990730 ML20210N1901999-08-0404 August 1999 Insp Rept 50-458/99-07 on 990530-0710.One Violation of NRC Requirements Occurred & Being Treated as Ncv.Major Areas Inspected:Aspects of Licensee,Operations,Maint,Engineering & Plant Support ML20210K1471999-07-30030 July 1999 Insp Rept 50-458/99-09 on 990510-28 with in-office Insp Until 990701.Noncited Violations Identified.Major Areas Inspected:Review of Licensee Actions Re Testing & Cleaning of Auxiliary Bldg Unit Coolers ML20196L0551999-07-0606 July 1999 Revised Pages 4 of Report Details Section & 2 of Rept Attachment for Insp Rept 50-458/99-03.Corrections Made to Tracking Numbers Assigned to Seven Noncited Violations & to SRO Location During Refueling Activities IR 05000458/19990041999-06-30030 June 1999 Insp Rept 50-458/99-04 on 990412-16 & 28-29.Five Violations Occurred & Being Treated as Noncited Violations.Major Areas Inspected:Portions of Radiation Protection Program,Including Exposure Controls & Radiation Technical & Worker Practices IR 05000458/19990051999-06-18018 June 1999 Insp Rept 50-458/99-05 on 990418-0529.Nonccited Violations Noted.Major Areas Inspected:Aspects of Licensee Operations, Engineering,Maint & Plant Support IR 05000458/19990031999-05-18018 May 1999 Insp Rept 50-458/99-03 on 990307-0417.Noncited Violations Noted.Major Areas Inspected:Operation,Maintenance, Engineering & Plant Support IR 05000458/19990061999-05-15015 May 1999 Insp Rept 50-458/99-06 on 990419-23.No Violations Noted. Major Areas Inspected:Inservice Exam Program Plan & Schedule,Implementation of Program Plan for Facility & Maint & Engineering Followup Review of Previous Insp Findings ML20205A4601999-03-26026 March 1999 Insp Rept 50-458/98-10 on 990222-26.Violations Noted.Major Areas Inspected:Radiation Work Permit Program Implementation from Oct 1997 to Feb 1999 & Problem Identification & Resolution Program as Applied to Program Deficiencies IR 05000458/19990021999-03-26026 March 1999 Insp Rept 50-458/99-02 on 990124-0306.Violations Noted.Major Areas Inspected:Licensee Operations,Maint,Engineering & Plant Support IR 05000458/19990011999-01-25025 January 1999 Insp Rept 50-458/99-01 on 990104-08.No Violations Noted. Major Areas Inspected:Licensee Physical Security Program Including Alarm Stations,Communications,Access Control of Personnel,Packages,Vehicles & Assessment Aids IR 05000458/19980201999-01-0707 January 1999 Insp Rept 50-458/98-20 on 981101-1212.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000458/19980161998-12-29029 December 1998 Insp Rept 50-458/98-16 on 980730-0807.Violations Noted. Major Areas Inspected:Engineering & Fire Protection.Also Reviewed,Status of Various Programs Which Were Planned or in Progress ML20198N9311998-12-29029 December 1998 Insp Rept 50-458/98-16 on 980730-0807.Violations Noted. Major Areas Inspected:Engineering & Fire Protection.Also Reviewed,Status of Various Programs Which Were Planned or in Progress IR 05000458/19980181998-11-30030 November 1998 Insp Rept 50-458/98-18 on 980920-1031.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20196G5161998-11-25025 November 1998 Insp Rept 50-458/98-10 Has Been Canceled.No Insp Rept Will Be Issued IR 05000458/19980191998-11-20020 November 1998 Insp Rept 50-458/98-19 on 981019-23.No Violations Noted. Major Areas Inspected:Operations IR 05000458/19980131998-10-27027 October 1998 Insp Rept 50-458/98-13 on 980608-12,22-26 & 0824-28.Apparent Violations Being Considered for Escalated Enforcement Action.Major Areas Inspected:Operations,Maint & Engineering IR 05000458/19980141998-10-21021 October 1998 Insp Rept 50-458/98-14 on 980928-1002.No Violations Noted. Major Areas Inspected:Operational Status of Licensee Emergency Preparedness Program IR 05000458/19980171998-10-0505 October 1998 Insp Rept 50-458/98-17 on 980809-0919.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000458/19980151998-08-28028 August 1998 Insp Rept 50-458/98-15 on 980628-0808.No Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support IR 05000458/19980121998-07-29029 July 1998 Insp Rept 50-458/98-12 on 980517-0627.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000458/19980071998-06-0808 June 1998 Insp Rept 50-458/98-07 on 980518-21.No Violations Noted. Major Areas Inspected:Implementation of Radiological Environ Monitoring & Meteorological Monitoring Programs IR 05000458/19980081998-06-0505 June 1998 Insp Rept 50-458/98-08 on 980405-0516.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000458/19980111998-06-0404 June 1998 Insp Rept 50-458/98-11 on 980518-21.No Violations Noted. Major Areas Inspected:Maint IR 05000458/19980061998-05-19019 May 1998 Insp Rept 50-458/98-06 on 980427-0501.No Violations Noted. Major Areas Inspected:Implementation of Liquid & Gaseous Radioactive Effluent Waste Mgt Program IR 05000458/19980091998-04-30030 April 1998 Informs That Insp Rept 50-458/98-09 Has Been Canceled ML20217A4801998-04-17017 April 1998 Insp Rept 50-458/98-05 on 980222-0404.Violations Noted. Major Areas Inspected:Operations,Main,Engineering & Plant Support ML20217B4951998-03-24024 March 1998 Insp Rept 50-458/98-03 on 980223-26.Violations Noted.Major Areas Inspected:Review of Radiation Protection Program Activities IR 05000458/19972011998-03-20020 March 1998 Fire Protection Insp Rept 50-458/97-201 on 970615-20, 0629-0703,0819,980120 & 0305.No Violations Noted.Major Areas Inspected:Comprehensive Evaluation of Fire Protection Program & Post Fire Safe Shutdown Capability IR 05000458/19980041998-03-19019 March 1998 Insp Rept 50-458/98-04 on 980111-0221.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20203L8831998-03-0404 March 1998 Insp Rept 50-458/98-01 on 980210-13.No Violations Noted. Major Areas Inspected:Licensee Performance & Capabilities During Fullscale,Biennial Exercise of Emergency Plan & Implementation Procedures ML20202B9401998-02-0606 February 1998 Insp Rept 50-458/97-19 on 971130-980110.Violations Noted. Major Areas Inspected:Licensee Operations,Maint,Engineering & Plant Support IR 05000458/19970201998-02-0505 February 1998 Insp Rept 50-458/97-20 on 971008-15.Violations Noted.Major Areas Inspected:Plant Support IR 05000458/19980021998-02-0202 February 1998 Insp Rept 50-458/98-02 on 980112-16.No Violations Noted. Major Areas Inspected:Licensee Physical Security Program, Including Access Authorization,Alarm Stations,Communication, Access Control of Personnel & Security Event Logs IR 05000458/19970181998-01-0606 January 1998 Insp Rept 50-458/97-18 on 971208-12.No Violations Noted. Major Areas Inspected:Maint & Engineering IR 05000458/19970121997-12-29029 December 1997 Insp Rept 50-458/97-12 on 971203-12.No Violations Noted. Major Areas Inspected:Licensed Operator Requalification Program Following Guidelines in Insp Procedure 71001 ML20197G6191997-12-24024 December 1997 Insp Rept 50-458/97-17 on 971012-1129.Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support IR 05000458/19970151997-11-17017 November 1997 Insp Rept 50-458/97-15 on 970922-1017.Violations Noted: Inadequate Procedrual Controls for Bus Restoration Contributed to Loss of Shutdown Cooling for 17 Min & Failure to Maintain Adequate Procedures IR 05000458/19970141997-11-14014 November 1997 Insp Rept 50-458/97-14 on 970831-1011.Violation Noted. Major Areas Inspected:Operation,Maint,Enginerring & Plant Support IR 05000458/19970161997-10-28028 October 1997 Insp Rept 50-458/97-16 on 970929-1003.No Violations Noted. Major Areas Inspected:Operations & Maint IR 05000458/19970131997-09-26026 September 1997 Insp Rept 50-458/97-13 on 970720-0830.Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support IR 05000458/19970031997-09-10010 September 1997 Insp Rept 50-458/97-03 on 970804-08.Violations Noted.Major Areas Inspected:Implementation of Solid Radwaste Mgt & Radwaste & Matls Transportation Programs IR 05000458/19973011997-08-20020 August 1997 Insp Rept 50-458/97-301 on 970728-0801.No Violations Noted. Major Areas Inspected:Operations Examiners Evaluated Competency of Two Senior Reactor Operator & Three Reactor Operator License Applicants for Issuance of Licenses IR 05000458/19970101997-08-0606 August 1997 Insp Rept 50-458/97-10 on 970608-0719.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20149H1441997-07-21021 July 1997 Partially Withheld Insp Rept 50-458/97-11 on 970623-27.Major Areas Inspected:Specific Areas of Physical Security Program Including Review of Records & Repts,Testing & Maint,Vital Area Barriers & Detection Aids & Alarm Stations 1999-09-08
[Table view] Category:INSPECTION REPORT
MONTHYEARIR 05000458/19990121999-10-19019 October 1999 Insp Rept 50-458/99-12 on 990822-1002.Non-cited Violations Noted.Major Areas Inspected:Operations,Engineering, Maintenance & Plant Support IR 05000458/19990101999-09-15015 September 1999 Insp Rept 50-458/99-10 on 990830-0903.No Violations Noted. Major Areas Inspected:Licensed Operators Requalification Program IR 05000458/19990081999-09-0808 September 1999 Insp Rept 50-458/99-08 on 990711-0821.Noncited Violations Identified.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000458/19990111999-08-17017 August 1999 Insp Rept 50-458/99-11 on 990719-23.No Violations Noted. Major Areas Inspected:Licensee Physical Security Program IR 05000458/19990091999-08-16016 August 1999 Replacement Pages 9-18 for Insp Rept 50-458/99-09 Issued on 990730 ML20210N1901999-08-0404 August 1999 Insp Rept 50-458/99-07 on 990530-0710.One Violation of NRC Requirements Occurred & Being Treated as Ncv.Major Areas Inspected:Aspects of Licensee,Operations,Maint,Engineering & Plant Support ML20210K1471999-07-30030 July 1999 Insp Rept 50-458/99-09 on 990510-28 with in-office Insp Until 990701.Noncited Violations Identified.Major Areas Inspected:Review of Licensee Actions Re Testing & Cleaning of Auxiliary Bldg Unit Coolers ML20196L0551999-07-0606 July 1999 Revised Pages 4 of Report Details Section & 2 of Rept Attachment for Insp Rept 50-458/99-03.Corrections Made to Tracking Numbers Assigned to Seven Noncited Violations & to SRO Location During Refueling Activities IR 05000458/19990041999-06-30030 June 1999 Insp Rept 50-458/99-04 on 990412-16 & 28-29.Five Violations Occurred & Being Treated as Noncited Violations.Major Areas Inspected:Portions of Radiation Protection Program,Including Exposure Controls & Radiation Technical & Worker Practices IR 05000458/19990051999-06-18018 June 1999 Insp Rept 50-458/99-05 on 990418-0529.Nonccited Violations Noted.Major Areas Inspected:Aspects of Licensee Operations, Engineering,Maint & Plant Support IR 05000458/19990031999-05-18018 May 1999 Insp Rept 50-458/99-03 on 990307-0417.Noncited Violations Noted.Major Areas Inspected:Operation,Maintenance, Engineering & Plant Support IR 05000458/19990061999-05-15015 May 1999 Insp Rept 50-458/99-06 on 990419-23.No Violations Noted. Major Areas Inspected:Inservice Exam Program Plan & Schedule,Implementation of Program Plan for Facility & Maint & Engineering Followup Review of Previous Insp Findings ML20205A4601999-03-26026 March 1999 Insp Rept 50-458/98-10 on 990222-26.Violations Noted.Major Areas Inspected:Radiation Work Permit Program Implementation from Oct 1997 to Feb 1999 & Problem Identification & Resolution Program as Applied to Program Deficiencies IR 05000458/19990021999-03-26026 March 1999 Insp Rept 50-458/99-02 on 990124-0306.Violations Noted.Major Areas Inspected:Licensee Operations,Maint,Engineering & Plant Support IR 05000458/19990011999-01-25025 January 1999 Insp Rept 50-458/99-01 on 990104-08.No Violations Noted. Major Areas Inspected:Licensee Physical Security Program Including Alarm Stations,Communications,Access Control of Personnel,Packages,Vehicles & Assessment Aids IR 05000458/19980201999-01-0707 January 1999 Insp Rept 50-458/98-20 on 981101-1212.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000458/19980161998-12-29029 December 1998 Insp Rept 50-458/98-16 on 980730-0807.Violations Noted. Major Areas Inspected:Engineering & Fire Protection.Also Reviewed,Status of Various Programs Which Were Planned or in Progress ML20198N9311998-12-29029 December 1998 Insp Rept 50-458/98-16 on 980730-0807.Violations Noted. Major Areas Inspected:Engineering & Fire Protection.Also Reviewed,Status of Various Programs Which Were Planned or in Progress IR 05000458/19980181998-11-30030 November 1998 Insp Rept 50-458/98-18 on 980920-1031.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20196G5161998-11-25025 November 1998 Insp Rept 50-458/98-10 Has Been Canceled.No Insp Rept Will Be Issued IR 05000458/19980191998-11-20020 November 1998 Insp Rept 50-458/98-19 on 981019-23.No Violations Noted. Major Areas Inspected:Operations IR 05000458/19980131998-10-27027 October 1998 Insp Rept 50-458/98-13 on 980608-12,22-26 & 0824-28.Apparent Violations Being Considered for Escalated Enforcement Action.Major Areas Inspected:Operations,Maint & Engineering IR 05000458/19980141998-10-21021 October 1998 Insp Rept 50-458/98-14 on 980928-1002.No Violations Noted. Major Areas Inspected:Operational Status of Licensee Emergency Preparedness Program IR 05000458/19980171998-10-0505 October 1998 Insp Rept 50-458/98-17 on 980809-0919.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000458/19980151998-08-28028 August 1998 Insp Rept 50-458/98-15 on 980628-0808.No Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support IR 05000458/19980121998-07-29029 July 1998 Insp Rept 50-458/98-12 on 980517-0627.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000458/19980071998-06-0808 June 1998 Insp Rept 50-458/98-07 on 980518-21.No Violations Noted. Major Areas Inspected:Implementation of Radiological Environ Monitoring & Meteorological Monitoring Programs IR 05000458/19980081998-06-0505 June 1998 Insp Rept 50-458/98-08 on 980405-0516.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000458/19980111998-06-0404 June 1998 Insp Rept 50-458/98-11 on 980518-21.No Violations Noted. Major Areas Inspected:Maint IR 05000458/19980061998-05-19019 May 1998 Insp Rept 50-458/98-06 on 980427-0501.No Violations Noted. Major Areas Inspected:Implementation of Liquid & Gaseous Radioactive Effluent Waste Mgt Program IR 05000458/19980091998-04-30030 April 1998 Informs That Insp Rept 50-458/98-09 Has Been Canceled ML20217A4801998-04-17017 April 1998 Insp Rept 50-458/98-05 on 980222-0404.Violations Noted. Major Areas Inspected:Operations,Main,Engineering & Plant Support ML20217B4951998-03-24024 March 1998 Insp Rept 50-458/98-03 on 980223-26.Violations Noted.Major Areas Inspected:Review of Radiation Protection Program Activities IR 05000458/19972011998-03-20020 March 1998 Fire Protection Insp Rept 50-458/97-201 on 970615-20, 0629-0703,0819,980120 & 0305.No Violations Noted.Major Areas Inspected:Comprehensive Evaluation of Fire Protection Program & Post Fire Safe Shutdown Capability IR 05000458/19980041998-03-19019 March 1998 Insp Rept 50-458/98-04 on 980111-0221.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20203L8831998-03-0404 March 1998 Insp Rept 50-458/98-01 on 980210-13.No Violations Noted. Major Areas Inspected:Licensee Performance & Capabilities During Fullscale,Biennial Exercise of Emergency Plan & Implementation Procedures ML20202B9401998-02-0606 February 1998 Insp Rept 50-458/97-19 on 971130-980110.Violations Noted. Major Areas Inspected:Licensee Operations,Maint,Engineering & Plant Support IR 05000458/19970201998-02-0505 February 1998 Insp Rept 50-458/97-20 on 971008-15.Violations Noted.Major Areas Inspected:Plant Support IR 05000458/19980021998-02-0202 February 1998 Insp Rept 50-458/98-02 on 980112-16.No Violations Noted. Major Areas Inspected:Licensee Physical Security Program, Including Access Authorization,Alarm Stations,Communication, Access Control of Personnel & Security Event Logs IR 05000458/19970181998-01-0606 January 1998 Insp Rept 50-458/97-18 on 971208-12.No Violations Noted. Major Areas Inspected:Maint & Engineering IR 05000458/19970121997-12-29029 December 1997 Insp Rept 50-458/97-12 on 971203-12.No Violations Noted. Major Areas Inspected:Licensed Operator Requalification Program Following Guidelines in Insp Procedure 71001 ML20197G6191997-12-24024 December 1997 Insp Rept 50-458/97-17 on 971012-1129.Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support IR 05000458/19970151997-11-17017 November 1997 Insp Rept 50-458/97-15 on 970922-1017.Violations Noted: Inadequate Procedrual Controls for Bus Restoration Contributed to Loss of Shutdown Cooling for 17 Min & Failure to Maintain Adequate Procedures IR 05000458/19970141997-11-14014 November 1997 Insp Rept 50-458/97-14 on 970831-1011.Violation Noted. Major Areas Inspected:Operation,Maint,Enginerring & Plant Support IR 05000458/19970161997-10-28028 October 1997 Insp Rept 50-458/97-16 on 970929-1003.No Violations Noted. Major Areas Inspected:Operations & Maint IR 05000458/19970131997-09-26026 September 1997 Insp Rept 50-458/97-13 on 970720-0830.Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support IR 05000458/19970031997-09-10010 September 1997 Insp Rept 50-458/97-03 on 970804-08.Violations Noted.Major Areas Inspected:Implementation of Solid Radwaste Mgt & Radwaste & Matls Transportation Programs IR 05000458/19973011997-08-20020 August 1997 Insp Rept 50-458/97-301 on 970728-0801.No Violations Noted. Major Areas Inspected:Operations Examiners Evaluated Competency of Two Senior Reactor Operator & Three Reactor Operator License Applicants for Issuance of Licenses IR 05000458/19970101997-08-0606 August 1997 Insp Rept 50-458/97-10 on 970608-0719.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20149H1441997-07-21021 July 1997 Partially Withheld Insp Rept 50-458/97-11 on 970623-27.Major Areas Inspected:Specific Areas of Physical Security Program Including Review of Records & Repts,Testing & Maint,Vital Area Barriers & Detection Aids & Alarm Stations 1999-09-08
[Table view] Category:UTILITY
MONTHYEARIR 05000458/19900311990-11-19019 November 1990 Insp Rept 50-458/90-31 on 901105-09.No Violations or Deviations Noted.Major Areas Inspected:Verification of Isolation Component Exemptions IR 05000458/19900251990-11-0707 November 1990 Insp Rept 50-458/90-25 on 900924-28 & 1015-19.Noncited Violation Identified.Major Areas Inspected:Quality Verification Function Including Condition Rept Program, Internal Audit Program ML20058A5461990-10-17017 October 1990 Insp Rept 50-458/90-23 on 900910-14.No Violations or Deviations Noted.Major Areas Inspected:Engineering Evaluation in Response to NRC Bulletin 88-004,action of Previously Identified Items & Review of Root Cause Analysis IR 05000458/19900281990-10-17017 October 1990 Insp Rept 50-458/90-28 on 901009-12.No Violations or Deviations Noted.Major Areas Inspected:Installation & Testing of Mods & Installation of Heat Shrinkable Insulation Tubing IR 05000458/19900221990-09-27027 September 1990 Insp Rept 50-458/90-22 on 900827-31.No Violations or Deviations Noted.Major Areas Inspected:Licensee Liquid & Gaseous Radwaste Mgt Program ML20059D6471990-08-28028 August 1990 Insp Rept 50-458/90-15 on 900611-15.No Violations or Deviations Noted.Major Areas Inspected:Operational Status of Emergency Preparedness Program,Including Followup to Previous Insp Findings & Equipment IR 05000458/19900201990-08-21021 August 1990 Insp Rept 50-458/90-20 on 900723-26.No Violations or Deviations Noted.Major Areas Inspected:Training & Qualification Effectiveness IR 05000458/19902001990-07-26026 July 1990 Electrical Distribution Sys Functional Insp Rept 50-458/90-200 on 900521-0622.No Violations Noted.Major Areas Inspected:Design & Implementation of Plant Electrical Distribution Sys & Adequacy of Engineering Support IR 05000458/19900171990-07-19019 July 1990 Advises That Insp 50-458/90-17 Canceled,Therefore,No Insp Rept Will Be Issued IR 05000458/19900141990-06-19019 June 1990 Insp Rept 50-458/90-14 on 900521-22.One self-identified Violation Noted.Major Areas Inspected:Licensee Occupational Radiation Protection Program Including High Radiation Area Controls IR 05000458/19890331989-09-21021 September 1989 Insp Rept 50-458/89-33 on 890801-31.No Violations or Deviations Noted.Major Areas Inspected:Operational Safety Verification,Maint Observation,Surveillance Test Observation,Ler Followup & Followup on 10CFR21 Repts IR 05000458/19890311989-08-29029 August 1989 Insp Rept 50-458/89-31 on 890701-31.Violations Noted.Major Areas Inspected:Operational Safety Verification,Maint & Surveillance Test Observation,Esf Walkdown & Emergency Preparedness Drill IR 05000458/19890301989-08-17017 August 1989 Insp Rept 50-458/89-30 on 890619-23.Violations Noted.Major Areas Inspected:Physical Security Program IR 05000458/19890191989-08-10010 August 1989 Advises That Insp 50-458/89-19 Cancelled & No Insp Rept Will Be Issued for Rept Number IR 05000458/19890321989-07-31031 July 1989 Insp Rept 50-458/89-32 on 890717-21.No Violations or Deviations Noted.Major Areas Inspected:Surveillance Testing Program & Plant Instrumentation Calibr Program.Lists of Surveillance Test Performance & Loop Calibr Repts Encl IR 05000458/19890281989-07-27027 July 1989 Insp Rept 50-458/89-28 on 890601-30.Violations Noted.Major Areas Inspected:Plant Events,Operational Safety Verification,Maint & Surveillance Test Observation & Licensee Action on Previous Insp Findings IR 05000458/19890251989-07-27027 July 1989 Insp Rept 50-458/89-25 on 890710-14.No Violations or Deviations Noted.Major Areas Inspected:Startup Testing. Conservative Error in Util Procedure for Manual Calculations of Core Thermal Power Identified IR 05000458/19890291989-07-14014 July 1989 Insp Rept 50-458/89-29 on 890619-23.No Violations or Deviations Noted.Major Areas Inspected:Corrective Actions IR 05000458/19890271989-07-12012 July 1989 Insp Rept 50-458/89-27 on 890605-09 & 19-23.Violations Noted.Major Areas Inspected:Self Assessment Capabilities IR 05000458/19890241989-06-26026 June 1989 Insp Rept 50-458/89-24 on 890501-31.Violations Noted.Major Areas Inspected:Plant Events,Operational Safety Verification & Maint & Surveillance Test Observation IR 05000458/19890221989-06-20020 June 1989 Insp Rept 50-458/89-22 on 890525-27.No Violations or Deviations Noted.Major Areas Inspected:Containment Integrated Leak Rate Test & Review of Results of Local Leak Rate Test IR 05000458/19890261989-06-14014 June 1989 Insp Rept 50-458/89-26 on 890515-19.No Violations Noted. Major Areas Inspected:Action on Previously Indentified Insp Findings,Inservice Insp Data Review & Corrective Actions IR 05000458/19890011989-06-0707 June 1989 Insp Rept 50-458/89-01 on 890501-05.No Violations Noted. Major Areas Inspected:Facility Mods & Nonlicensed Staff Training ML20244C3561989-06-0505 June 1989 Insp Rept 50-458/89-18 on 890501-05 & 15-19.Violations Noted.Major Areas Inspected:Inservice Testing Program for Pumps & Valves,Welding Activities Associated W/Repairs to Svc Water Sys & Activities Re Instrument Air Sys Insp IR 05000458/19890231989-05-25025 May 1989 Insp Repts 50-458/89-23 on 890501-05.No Violations or Deviations Noted.Major Areas Inspected:Programs for Station Design Changes & Mods for Installation of Raychem Electrical Splices IR 05000458/19890111989-05-24024 May 1989 Insp Rept 50-458/89-11 on 890315-0430.Violations Noted.Major Areas Inspected:Plant Events,Operational Safety Verification,Maint & Surveillance Test Observation,Refueling Activities & Licensee Action on Previous Findings IR 05000458/19890171989-05-16016 May 1989 Insp Rept 50-458/89-17 on 890409-19.Violations Noted.Major Areas Inspected:Radiation Protection Program,Including Planning & Preparation for in-reactor Pressure Vessel Repair of Feed Water Spargers ML20244D4511989-05-15015 May 1989 Partially Withheld Insp Rept 50-458/89-15 on 890402-06 (Ref 10CFR73.21).Violations Noted.Major Areas Inspected:Physical Security Program,Including Mgt Support,Security Program Plans & Audits & Protected & Vital Area Access IR 05000458/19890131989-05-15015 May 1989 Advises That Insp Rept 50-458/89-13 Cancelled.No Rept Will Be Issued for Rept Number IR 05000458/19890211989-05-10010 May 1989 Insp Rept 50-458/89-21 on 890424-28.No Violations or Deviations Noted.Major Areas Inspected:Surveillance Test Observation & Followup on Operating Events IR 05000458/19890101989-05-0909 May 1989 Insp Rept 50-458/89-10 on 890327-0406.No Violations or Deviations Noted.Major Areas Inspected:Review of Inservice Insp,Welding & Associated Documents & Procedures.Mod to RHR Sys Also Reviewed IR 05000458/19890141989-04-20020 April 1989 Insp Rept 50-458/89-14 on 890403-07.No Violations or Deviations Noted.Major Areas Inspected:Testing of Pipe Supports & Restraint Sys ML20244B6001989-04-0606 April 1989 Insp Rept 50-458/89-12 on 890327-31.Violation Noted.Major Areas Inspected:Welding Activities.Welding Program Well Defined & Includes Monitoring by Qc.Weakness in Welder Qualification Program Noted IR 05000458/19890071989-04-0505 April 1989 Insp Rept 50-458/89-07 on 890201-0314.No Violations or Deviations Noted.Major Areas Inspected:Plant Events, Emergency Preparedness Exercise,Operational Safety Verification & Surveillance Test Observation IR 05000458/19890091989-03-30030 March 1989 Insp Rept 50-458/89-09 on 890301-03.No Violations or Deviations Noted.Major Areas Inspected:Licensee Performance & Capabilities During Annual Exercise of Emergency Plan & Procedures IR 05000458/19890081989-03-10010 March 1989 Insp Rept 50-458/89-08 on 890213-17.No Violations or Deviations Noted.Major Areas Inspected:Calibr Program, Emergency Diesel Fuel Oil Program Into QA Program & Receipt, Storage & Handling of Diesel Generator Fuel Oil IR 05000458/19890061989-03-0808 March 1989 Insp Rept 50-458/89-06 on 890206-10.No Violations or Deviations Noted.Major Areas Inspected:Inservice Testing Program for Pumps & Valves IR 05000458/19890051989-02-24024 February 1989 Insp Rept 50-458/89-05 on 890101-31.No Violations Noted. Major Areas Inspected:Operational Safety Verification, Radiological Protection,Security,Surveillance Test Observation & Maint Observation IR 05000458/19890031989-02-23023 February 1989 Informs That Insp 50-458/89-03 Cancelled.No Insp Rept Will Be Issued for Subj Rept Number IR 05000458/19880291989-01-31031 January 1989 Partially Withheld Insp Rept 50-458/88-29 on 881212-16 (Ref 10CFR73.21).No Violations or Deviations Noted.Major Areas Inspected:Physical Security Program Included Mgt Support, Security Program Plans,Audits & Records & Repts IR 05000458/19880191988-10-14014 October 1988 Insp Rept 50-458/88-19 on 880801-0917.Violation Noted.Major Areas Inspected:Surveillance & Maint Observation,Safety Sys Walkdown,Operational Safety Verification,Radiological Protection Observation & Security ML20155G8291988-10-0303 October 1988 Insp Rept 50-458/88-21 on 880912-15.No Violations or Deviations Noted.Major Areas Inspected:Emergency Preparedness Program ML20155E2471988-09-27027 September 1988 Insp Rept 50-458/88-22 on 880829-0915.Violations Noted.Major Areas Inspected:Fuel Bldg Ventilation Charcoal Filtration Sys IR 05000458/19880201988-09-14014 September 1988 Insp Rept 50-458/88-20 on 880822-25.No Violations Noted. Details Withheld (Ref 10CFR73.21) ML20153E4051988-08-30030 August 1988 Insp Rept 50-458/88-18 on 880808-12.Violations Noted.Major Areas Inspected:Surveillance Procedures & Records IR 05000458/19880181988-08-30030 August 1988 Insp Rept 50-458/88-18 on 880808-12.Violations Noted.Major Areas Inspected:Surveillance Procedures & Records ML20151Z8021988-08-22022 August 1988 Partially Withheld Insp Rept 50-458/88-14 on 880613-17 (Ref 10CFR73.21).Violation Noted.Major Areas Inspected:Lers, Allegations,Security Procedures,Mgt Effectivenss,Security Program Audits & Records & Repts IR 05000458/19880171988-08-12012 August 1988 Insp Rept 50-458/88-17 on 880701-31.No Violations or Deviations Noted.Major Areas Inspected:Licensee Action on NRC Bulletin 88-005,surveillance Test & Maint Observation, Operational Safety Verification & Security IR 05000458/19880161988-07-27027 July 1988 Insp Rept 50-458/88-16 on 880620-24.No Violations or Deviations Noted.Major Areas Inspected:Liquid & Gaseous Effluent Release Program & Allegations Re Training & Qualifications of Supervisory Personnel ML20151G0971988-07-15015 July 1988 Insp Rept 50-458/88-13 on 880501-0630.Violation Noted.Major Areas Inspected:Previous Insp Findings,Nrc Bulletins 88-001 & 88-007,NRC Info Notices,Surveillance Test Observation, Maint Observation & Safety Sys Walkdown 1990-09-27
[Table view] Category:TEXT-INSPECTION & AUDIT & I&E CIRCULARS
MONTHYEARIR 05000458/19990121999-10-19019 October 1999 Insp Rept 50-458/99-12 on 990822-1002.Non-cited Violations Noted.Major Areas Inspected:Operations,Engineering, Maintenance & Plant Support ML20212L9771999-10-0505 October 1999 Notice of Violation from Insp on 990710.Violation Noted:From 990224-0325,River Bend Station Operated in Mode I Without Three Operable EDGs IR 05000458/19990101999-09-15015 September 1999 Insp Rept 50-458/99-10 on 990830-0903.No Violations Noted. Major Areas Inspected:Licensed Operators Requalification Program IR 05000458/19990081999-09-0808 September 1999 Insp Rept 50-458/99-08 on 990711-0821.Noncited Violations Identified.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000458/19990111999-08-17017 August 1999 Insp Rept 50-458/99-11 on 990719-23.No Violations Noted. Major Areas Inspected:Licensee Physical Security Program IR 05000458/19990091999-08-16016 August 1999 Replacement Pages 9-18 for Insp Rept 50-458/99-09 Issued on 990730 ML20210N1901999-08-0404 August 1999 Insp Rept 50-458/99-07 on 990530-0710.One Violation of NRC Requirements Occurred & Being Treated as Ncv.Major Areas Inspected:Aspects of Licensee,Operations,Maint,Engineering & Plant Support ML20210K1471999-07-30030 July 1999 Insp Rept 50-458/99-09 on 990510-28 with in-office Insp Until 990701.Noncited Violations Identified.Major Areas Inspected:Review of Licensee Actions Re Testing & Cleaning of Auxiliary Bldg Unit Coolers ML20196L0551999-07-0606 July 1999 Revised Pages 4 of Report Details Section & 2 of Rept Attachment for Insp Rept 50-458/99-03.Corrections Made to Tracking Numbers Assigned to Seven Noncited Violations & to SRO Location During Refueling Activities IR 05000458/19990041999-06-30030 June 1999 Insp Rept 50-458/99-04 on 990412-16 & 28-29.Five Violations Occurred & Being Treated as Noncited Violations.Major Areas Inspected:Portions of Radiation Protection Program,Including Exposure Controls & Radiation Technical & Worker Practices IR 05000458/19990051999-06-18018 June 1999 Insp Rept 50-458/99-05 on 990418-0529.Nonccited Violations Noted.Major Areas Inspected:Aspects of Licensee Operations, Engineering,Maint & Plant Support IR 05000458/19990031999-05-18018 May 1999 Insp Rept 50-458/99-03 on 990307-0417.Noncited Violations Noted.Major Areas Inspected:Operation,Maintenance, Engineering & Plant Support IR 05000458/19990061999-05-15015 May 1999 Insp Rept 50-458/99-06 on 990419-23.No Violations Noted. Major Areas Inspected:Inservice Exam Program Plan & Schedule,Implementation of Program Plan for Facility & Maint & Engineering Followup Review of Previous Insp Findings ML20205A4601999-03-26026 March 1999 Insp Rept 50-458/98-10 on 990222-26.Violations Noted.Major Areas Inspected:Radiation Work Permit Program Implementation from Oct 1997 to Feb 1999 & Problem Identification & Resolution Program as Applied to Program Deficiencies IR 05000458/19990021999-03-26026 March 1999 Insp Rept 50-458/99-02 on 990124-0306.Violations Noted.Major Areas Inspected:Licensee Operations,Maint,Engineering & Plant Support ML20205A4131999-03-23023 March 1999 NRC Operator Licensing Exam Rept 50-458/99-301 (Including Completed & Graded Tests) for Tests Administered on 990222- 0303.All 14 Applicants Passed Exams ML20203A5351999-01-27027 January 1999 EN-99-005:on 990201,notice of Proposed Imposition of Civil Penalty in Amount of $55,000 Issued to Licensee.Action Based on Two Severity Level III Violations Involving Design Deficiency,Caused Uncertainty as to Ability of Div I & II IR 05000458/19990011999-01-25025 January 1999 Insp Rept 50-458/99-01 on 990104-08.No Violations Noted. Major Areas Inspected:Licensee Physical Security Program Including Alarm Stations,Communications,Access Control of Personnel,Packages,Vehicles & Assessment Aids IR 05000458/19980201999-01-0707 January 1999 Insp Rept 50-458/98-20 on 981101-1212.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20199E2111999-01-0707 January 1999 Notice of Violation from Insp on 981101-1212.Violation Noted:On 971022,radiation Protection Technicians Released One Container with Two Items Contaminated Above Limits Specified in Procedure RSP-0213 ML20199A2161999-01-0505 January 1999 Notice of Violation from Investigation Conducted on 971231. Violation Noted:On 971015,A Wells,Employee on Entergy Operations,Inc,Submitted to NRC Info Known to Be Inaccurate in Some Respect Matl to NRC ML20198T0691999-01-0505 January 1999 Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $55,000.Violation Noted:Info Was Provided to Senior Resident Inspector That Was Not Complete & Accurate in All Matl Respects Re 971010 of RWP 97-0002 ML20203A6601999-01-0505 January 1999 EN-99-001:on 990105,notice of Proposed Imposition of Civil Penalty in Amount of $55,000 Issued to Licensee.Action Based on Severity Level III Violation Involving Superintendent of Radiation Control at Licensee River Bend Station Facility ML20198N9311998-12-29029 December 1998 Insp Rept 50-458/98-16 on 980730-0807.Violations Noted. Major Areas Inspected:Engineering & Fire Protection.Also Reviewed,Status of Various Programs Which Were Planned or in Progress IR 05000458/19980161998-12-29029 December 1998 Insp Rept 50-458/98-16 on 980730-0807.Violations Noted. Major Areas Inspected:Engineering & Fire Protection.Also Reviewed,Status of Various Programs Which Were Planned or in Progress ML20198N9151998-12-29029 December 1998 Notice of Violation from Insp on 980720-0807.Violation Noted:On 980724,licensee Made Change to Facility as Described in Safety Analysis Rept,Which Created Unreviewed Safety Question,Without Prior Commission Approval IR 05000458/19980991998-12-22022 December 1998 SALP Rept 50-458/98-99 Canceled.Process Suspended for Two Yrs.No Insp Rept Will Be Issued for Number IR 05000458/19980181998-11-30030 November 1998 Insp Rept 50-458/98-18 on 980920-1031.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20196G5161998-11-25025 November 1998 Insp Rept 50-458/98-10 Has Been Canceled.No Insp Rept Will Be Issued IR 05000458/19980191998-11-20020 November 1998 Insp Rept 50-458/98-19 on 981019-23.No Violations Noted. Major Areas Inspected:Operations IR 05000458/19980131998-10-27027 October 1998 Insp Rept 50-458/98-13 on 980608-12,22-26 & 0824-28.Apparent Violations Being Considered for Escalated Enforcement Action.Major Areas Inspected:Operations,Maint & Engineering IR 05000458/19980141998-10-21021 October 1998 Insp Rept 50-458/98-14 on 980928-1002.No Violations Noted. Major Areas Inspected:Operational Status of Licensee Emergency Preparedness Program IR 05000458/19980171998-10-0505 October 1998 Insp Rept 50-458/98-17 on 980809-0919.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000458/19980151998-08-28028 August 1998 Insp Rept 50-458/98-15 on 980628-0808.No Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support ML20154L7021998-08-17017 August 1998 Corrected Notice of Violation from Insp Completed on 980218. Corrected NOV Sent to Make Consistent with Ltr Sent on 980722 & to Make Clear That No Response Required ML20236V2081998-07-29029 July 1998 Notice of Violation from Insp on 980517-0627.Violation Noted:On 980601,while Accomplishing Clearance Order 98-0583, Operator Did Not Follow Sequence Shown on Clearance Order While Positioning Components IR 05000458/19980121998-07-29029 July 1998 Insp Rept 50-458/98-12 on 980517-0627.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20154M5531998-07-22022 July 1998 Notice of Violation from Investigation Completed on 980323. Violation Noted:On 970908,WJ Ginn,Employee of Contractor to Entergy Operations,Inc,Deliberately Submitted Info to Licensee That Was Incomplete & Inaccurate ML20154L7351998-07-22022 July 1998 Notice of Violation from Investigation Completed on 980218. Violation Noted:On 970711,DL Brown Employee of Contractor to Util Deliberatly Submitted Info to Licensee That Brown Knew Incomplete & Inaccurate on Security Questionnaire IR 05000458/19980071998-06-0808 June 1998 Insp Rept 50-458/98-07 on 980518-21.No Violations Noted. Major Areas Inspected:Implementation of Radiological Environ Monitoring & Meteorological Monitoring Programs IR 05000458/19980081998-06-0505 June 1998 Insp Rept 50-458/98-08 on 980405-0516.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000458/19980111998-06-0404 June 1998 Insp Rept 50-458/98-11 on 980518-21.No Violations Noted. Major Areas Inspected:Maint IR 05000458/19980061998-05-19019 May 1998 Insp Rept 50-458/98-06 on 980427-0501.No Violations Noted. Major Areas Inspected:Implementation of Liquid & Gaseous Radioactive Effluent Waste Mgt Program IR 05000458/19980091998-04-30030 April 1998 Informs That Insp Rept 50-458/98-09 Has Been Canceled ML20217A4461998-04-17017 April 1998 Notice of Violation from Insp on 980222-0404.Violation Noted:Established Measures Did Not Assure That Deviation from Environ Design Criteria Was Controlled ML20217A4801998-04-17017 April 1998 Insp Rept 50-458/98-05 on 980222-0404.Violations Noted. Major Areas Inspected:Operations,Main,Engineering & Plant Support PNO-IV-98-016, on 980413,operators at River Bend Station Initiated Normal Reactor Shutdown.Plant Shutdown Deemed Necessary After Operators Identified Main Generator Hydrogen Seal Oil Leak at Main Generator Casing1998-04-14014 April 1998 PNO-IV-98-016:on 980413,operators at River Bend Station Initiated Normal Reactor Shutdown.Plant Shutdown Deemed Necessary After Operators Identified Main Generator Hydrogen Seal Oil Leak at Main Generator Casing ML20217B4701998-03-24024 March 1998 Notice of Violation from Insp on 980223-26.Violation Noted: Licensee Not Maintained Records of Reviews of Radiation Protection Program Content & Implementation ML20217B4951998-03-24024 March 1998 Insp Rept 50-458/98-03 on 980223-26.Violations Noted.Major Areas Inspected:Review of Radiation Protection Program Activities IR 05000458/19972011998-03-20020 March 1998 Fire Protection Insp Rept 50-458/97-201 on 970615-20, 0629-0703,0819,980120 & 0305.No Violations Noted.Major Areas Inspected:Comprehensive Evaluation of Fire Protection Program & Post Fire Safe Shutdown Capability 1999-09-08
[Table view] |
See also: IR 05000458/1987003
Text
_ _ _ _ _ _ _ _ _ _ _ _ ,
. .
APPENDIX B
U.S. NUCLEAR REGULATORY COMMISSION
REGION IV
NRC Inspection Report: 50-458/87-03 License: NPF-47
Docket: 50-458L
Licensee: Gulf States Utilities (GSU)
P. O. Box 220
St. Francisville, Louisiana 70775
Facility Name: River Bend Station (RBS)
Inspection At: River Bend Station, St. Francisville, Louisiana
Inspection Conducted: February 9-13, 1987
Inspectors: J[Ad7
JfjB. Nicholas, Sedior Radiation Specialist Date
Mcilities Radiological Protection Section
.
/K &
R. Wise, Radiation Specialist, Facilities
r/a/tr
Date
Radiological Protection Section
C( c
Approved: U $bkl NlbObf
B. Murray, Chief, Faci ities Radiological
$/lb/B
Date'
Protection Section
Inspection Summary
Inspection Conducted February 9-13, 1987 (Report 50-458/87-03
Areas Inspected: Routine, unannounced inspection of the licensee's water
chemistry and radiochemistry programs, including: review of organization and
management controls, staffing and staff qualifications, training program,
procedures, facilities and equipment, quality assurance (QA) program of water
chemistry and radiochemistry activities, postaccident sampling system (PASS),
quality control of analytical measurements, and water chemistry and
radiochemistry confirmatory measurements.
8703270601 870324
PDR ADOCK 05000458
G PDR
- _ _ _ _ _ _ _ _ _
v-
.: ,
J
v 2
Results: 'Within the areas inspected, one violation was. identified.(failure-to
ensure the capability to obtain and analyze postaccident samples, paragraph 5).
One unresolved item was identified (failure to conduct training,
paragraph 6). .No deviations were identified.
,
. .%
'
_ ,
- , ...
3
DETAILS
1. Persons Contacted
GSU
'*D. H. Barrow, Director, GSU
- W. J. Cahill, Jr. Senior Vice President, GSU
- J. C. Deddens, Senior Vice President, RBS Nuclear Group
- T. F. Plunkett, Plant Manager
- D. L. Andrews, Director, Nuclear Training
- R. J. Backen, Acting Supervisor, Operations QA
- J. E. Booker, Manager, Oversight
T. D. Burnett, Plant Chemist
- J. L. Burton, Supervisor, Independent Safety Engineering Group
- E. M. Cargill, Supervisor, Radiological Programs
- J. W. Cook, Lead Environmental Analyst, Licensing
'K. C. Coffey, Nuclear Chemistry Technician
- L. A. England, Supervisor, Licensing
- K. J. Gladrosich, Supervisor, Operations Quality Control (QC)
- D. R. Gipson, Director, Quality Services
- E. R. Grant, Director, Nuclear Licensing
- J. R. Hamilton, Director, Design Engineering
R. P. Hebert, QA Engineer
- K. C.'Hodges,' Supervisor, QA Engineering
- R. E. Horn, Nuclear ~ Training Coordinator - Technical
- G. R. Kimmell, Supervisor, Operations QA
- R. J. King, Supervisor, Nuclear Licensing
F. Kral, Nuclear Chemistry Technician
G. D. Lipham, Chemistry Foreman
A. S. Maryman, Nuclear Chemistry Technician
- I. M. Malik,' Supervisor, Quality Systems
- J. H. McQuirter,' Licensing Engineer
- T. O. Maffitt, QA Engineer-
- C. L. Nash, Chemistry Supervisor
- V. J. Normand, Supervisor, Administrative Services
- W.-H. Odell, Manager, Administration
E. R. Oswood, Lead Senior QA Engineer
- J. J. Pruitt, Director, Management Systems
E. T. Rochelle, Lead Chemist
- M. F. Sankovich, Manager, Engineering
C. S. Scott, Plant Chemist
J. E. Spivey, QA Engineer
- R. B. Stafford, Director, Quality Operations
- D. Williamson, Operations Supervisor
W. K. Woodcox, Chemistry Foreman
.
_.
,_
. .
4
Others
- D. D. Chamberlain, NRC Senior Resident Inspector
- G. A. Pick, NRC Reactor Engineer, Region IV
- R. C. Stewart, NRC Reactor Inspector, Region IV
- Denotes those present during the exit briefing on February 13, 1987.
The NRC inspectors also interviewed several other 58S employees during the
inspection.
2. Follow-up on Previous Inspection Finding
(Closed) Violation (458/8605-01): Failure to Maintain Calibration Records
- This item involved the failure to maintain the required instrument
calibration data and records for the gas partitioner prior to performing
hydrogen analyses of the offgas hyr.cogen recombiner effluent. The NRC
inspector reviewed the licensee'F Corrective actions including revisions
to Chemistry Section Procedures CSP-0100, " Chemical / Radiochemical Technical
Specifications Surveillances," Revision 2, dated March 24, 1986, and
CSP-0206, " Operation of the *cisher Gas Partitioner Model 1200," Revision 1,
dated February 12, 1986. The NRC inspector also reviewed documentation of
calibrations performed or, the gas partitioner prior to use for hydrogen
analyses during 1986 apJ found the calibrations performed and recorded in
accordance with appro',ed procedures. This violation is considered closed.
3. Follow-up on Licen<,ee Event Report
(Closed) License.e Event Report (458/86-046): Missed Technical Specification
Requirement on Fuel Building Radiation Monitor - This item involved the
wide range gas monitor on the fuel building exhaust stack being inoperable
for greater than 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> without an alternate means of stack sampling and
monitoring in service. Auxiliary sampling equipment for particulates and
iodines was not placed in service within the 8-hour time period and the
release was not suspended. The NRC inspector reviewed the monitoring
conditions of the fuel building exhaust stack and the reasons for the
licene,ee event report. The NRC inspector also reviewed the licensee's
corrective actions, including the Condition Report 86-0726 and the
revision to Chemistry Operating Procedure C0P-0046, " Sampling Gaseous
Ef/luents via the Wide Range Gas Monitors," Revision 5, dated January 27,
1987. This item is considered closed.
4. Program Areas Inspected
The following program areas were inspected. Unless otherwise noted, the
inspection was completed and identified no violations, deviations,
unresolved items, or open items. Notations after a specific inspection
item are used to identify the following: I = item was not inspected or
<
. o
5
was only partially inspected and may require further review and evaluation
during the current inspection cycle, V = violation, D = deviation,
U = unresolved item, and 0 = open item.
Inspection Procedure Inspection Requirements
83722 Plant Chemistry: Organization and
Management Controls (Minimum / Basic)
02.01 - Organization
02.02 - Staffing
'
02.03 - Chemistry Supervisor
02.04 - Identification and Correction of
Weaknesses
02.05 - Audits and Appraisals
83522 Plant Chemistry: Organization and
Management Controls (Preoperational and
Supplemental)
02.01 - Organization, Responsibilities,
and Authorities
02.02 - Staffing
02.03 - Identification and Correction
of Weaknesses
02.04 - Audits and Appraisals
02.05 - Communication to Employees
02.06 - Documentation and Implementation
83723 Plant Chemistry: Training and
Qualifications (Minimum / Basic)
02.01 - Responsibilities
02.02 - New Personnel
02.03 - Audits and Appraisals
83523 Plant Chemistry: Training and
Qualifications (Preoperational and
'
Supplemental)
!
02.01 - Training and Qualifications
Program
-
.. .
1
!
'
p
6
!-
L '
02.02 - Education and Experience
02.03 - Adequacy
84725 Quality Assurance and Confirmatory
Measurements For In-Plant Radiochemical
,
Analysis (Minimum / Basic)
02.01 - Audits and Appraisals
02.02 - Changes
02.03 - Confirmatory Measurements
02.04 - Postaccident Sample Analysis-V
(see paragraph 5)
02.05 - Implementation of the Quality
Assurance Program
02.06 - Contractor Activities
84525 ('uality Assurance and Confirmatory
Measurements For In-Plant Radiochemical
Analysis (Preoperational and
Supplemental)
02.01 - Facilities, Equipment, and
Supplies
02.02 - Procedures
02.03 - Confirmatory Measurements
02.04 - Postaccident Sample Analysis-U
(see paragraph 5)
02.05 - Quality Assurance Program
02.06 - Contractor Activities
79701 Light Water Reactor Water Chemistry
Control and Chemical Analysis (Basic)
02.01 - Audits and Appraisals
02.02 - Changes
[7
.
,) . > >
,
'
- u
,
'
+ 'y
!
?
02.03 - Implementation of the Water
Chemistry Control Program
02.04 - Implementation of the Quality
Assurance Program for. Chemical
Measurements
79501 Light Water Reactor Water Chemistry
Control and Chemical Analysis
(Preoperational and Supplemental)
02.01 - Establishment of a Water
Chemistry Control Program-I
02.02 - Implementation of the Water
Chemistry Control Program-I
02.03 - Water Sampling
02.04 - Chemistry Measurements:
Facilities and Equipment
02.05 - Establishment of a Quality
Assurance Program for Chemical
Measurements-I
02.06 - Implementation of a Quality
Assurance Program for Chemical
Measurements-I
02.07 - Laboratory Safety
79502 Plant Systems Affecting Plant Water
Chemistry (Preoperational and
Supplemental) ,
-02.01 - Audits and Appraisals
02.02 - Primary and Secondary Water
Systems-I
02.03 - Auxiliary Water Systems-I
02.04 - Demineralizers-I
5. Violation
~
84725, Item 02.04 - Postaccident Sample Analysis
Technical Specification 6.8.4(c) requires that a program be established,
implemented, and maintained which will ensure the capability to obtain and
s
.. . .
4
[ ,
8
.
analyze reactor coolant, radioactive iodines and particulates in gaseous
'
effluents, and containment atmosphere samples, under accident conditions.
The program shall include training of personnel, procedures for sampling
and analysis, and provisions for maintenance of sampling and analysis
equipment. Chemistry Section Procedure CSP-0150, " Chemistry Surveillance
of the Postaccident Sampling System," Revision 1, dated January 2, 1986,
requires that a monthly surveillance of the PASS be performed to ensure the
capability to obtain and analyze postaccident samples of reactor water and
containment atmosphere. Contrary to the above, On February 12, 1987, the
NRC inspectors reviewed the results of the monthly surveillance tests
attempted on the PASS and found that since the initial demonstration of
PASS operability on November 10, 1985, prior to exceeding 5 percent power,
none of the monthly surveillance tests throughout 1986 had been completed
successfully to demonstrate the capability of the PASS to obtain and
analyze reactor water and containment atmosphere postaccident samples. On
February 12, 1987, the NRC inspectors requested that the licensee
demonstrate the operability of the PASS under simulated accident conditions.
The attempt to operate the PASS was unsuccessful due to equipment
malfunction. The failure to establish, implement, and maintain a program
to ensure the capability to obtain and analyze reactor water and
containment atmosphere postaccident samples is an apparent violation of
Technical Specification 6.8.4(c). (458/8703-01)
6. Unresolved Item
84525, Item 02.04 - Postaccident Sample Analysis
Technical Specification 6.8.4(c) requires that a program be established and
implemented to provide training to personnel on the operation of the PASS.
The licensee's Chemistry Section Procedure CSP-003, " Chemistry Personnel
Qualifications," Revision 2, dated January 30, 1986, states in
paragraph 6.5.4 that continuing training of chemistry personnel shall
include annual PASS retraining. Contrary to the above, the NRC inspectors
determined on February 12, 1987, that the licensee had not conducted annual ;
requalification training on the PASS for the nuclear chemistry technicians
since the initial training conducted in August 1985. The failure to
conduct the required annual requalification training is considered a
pntential violation. Since this matter is related to training, it is not
classified as a violation, but is considered to be an unresolved item in
accordance with the Commission Policy Statement on Training and
Qualification of Nuclear Power Plant Personnel (50 FR 11147 dated March 30,
1985). (458/8703-02)
7. Exit Briefing
l
The NRC inspectors met with the NRC senior resident inspector and the
licensee representatives denoted in paragraph 1 at the conclusion of the
inspection on February 13, 1987. The lead NRC inspector summarized the
scope of the inspection and discussed the inspection findings and the
results of the confirmatory measurements.
-
n-
. ..
1
ATTACHMENT 1
Analytical Measurements
1. Chemistry Confirmatory Measurements
During the inspection, standard chemical solutions were submitted to the
licensee for analysis. The standard solutions were prepared by the
Brookhaven National Laboratory, Safety and Environmental Protection
Division, for the NRC. The standards were analyzed by the licensee using
routine methods and equipment. The analysis of chemical standards is used
to verify the licensee's capability to monitor chemical parameters in
various plant systems with respect to Technical Specification requirements
<
and other industry standards. In addition, the analysis of standards is
used to evaluate tha licensee's analytical procedures with respect to
accuracy and precision.
The results of the measurements comparison are listed in Attachment 2.
Attachment 3 contains the criteria used to compare results. The
licensee's analytical results indicated that six of the seven results were
in agreement. All standards were analyzed in triplicate.
2. Radiological Confirmatory Measurements
Confirmatory measurements were performed on the following standards and
samples in the Region IV mobile laboratory at River Bend Station during
the inspection:
a. Reector Coolant Liquid (1 liter Marinelli)
b. Gas Sample (15 cc Off Gas Vial)
c. Particulate Filter Standard (21478-109)
d. Charcoal Cartridge Standard (21420-109)
e. Liquid Waste Sample (1 liter Marinelli)
f. Tritium Sample
The confirmatory measurements tests consisted of comparing measurements
made by the licensee and the NRC mobile laboratory. The NRC's mobile
laboratory measurements are referenced to the National Bureau of Standards
by laboratory intercomparisons. Confirmatory measurements are made only
for those nuclides identified by the NRC as being present in concentrations
greater than 10 percent of the respective isotopic values for liquid and
gas concentrations as stated in 10 CFR Part 20, Appendix B, Table II.
Attachment 5 contains the criteria used to compare results.
At the time of the inspection, the licensee utilized three detectors in
chemistry for comparison with the NRC results. The licensee performed the
tritium analysis on their liquid scintillation counting system. The
individual sample analyses and comparison of analytical results of the
radiological confirmatory measurements are tabulated in Attachment 4. The
licensee's gamma isotopic results from the listed samples in Attachment 4
showed 96 percent agreement with the NRC analysis results. The licensee's
tritium result was in agreement with the NRC analysis result.
_ _ _ _ _ _ - _ _ _ _ _ - _ - _ _ _ _ _ _ _ _ _ _ - _ -
F-
s
l
!
2
!
Confirmatory measurements were performed by the licensee on liquid samples
prepared by the Radiological Environmental Sciences Laboratory (RESL) in
Idaho Falls, Idaho. The Itcensee's analytical results were compared to
the known sample activities and the results of the comparisons are
presented in Attachment 4, Sample 7. The licensee's results were in
86 percent agreement for sample 7 analyzed in 1986.
._
.
. . ,
'
ATTACHMENT 2
Chemistry Confirmatory Measurements Results
l
.
RBS Results NRC Results RBS/NRC Comparison
l Chemical Parameter (ppb) (ppb) Ratio Decision
Nickel 146.214.6 153.014.0 0.9610.04 Agreement
Iron 157.619.6 147.014.2 1.0710.07 Agreement
l
i Chromium 145.212.1 -143.018.0 1.0210.06 Agreement
Copper 140.712.3 14516.0 0.9710.04 Agreement
!
L Silica 20.610.3 21.811.4 0.9510.06 Agreement
Chloride 11.9810.16 12.0511.55 0.9910.13 Agreement
i Sulfate 11.8410.37 10.0010.45 1.1810.06 Disgreement
!
NOTE: All licensee analyses were run at least in triplicate. The analyses
were repeat analyses of one dilution and the uncertainty is an estimate of the
l
instrument precision.
l
l
[
l
l
!
l
,
I
m
. .
ATTACHMENT 3
Criteria For Comparing Analytical Measurements
This attachment provides criteria for comparing results of capability tests.
In these. criteria the judgement limits are based on the uncertainty of the
ratio of the licensee's value to the NRC value. The following steps are
-
performed:
'
(1) the ratio'of the licensee's value to the NRC value is computed
Licensee Value
(ratio = NRC Value );
(2) the uncertainty of the ratio is propagated.1
If the absolute value of one minus the ratio is less than or equal to twice the
ratio uncertainty, the results are in agreement. (ll-ratiol 5 2 uncertainty)
Z= X, then Sz2 = Sx2+ 2
V F F- 2
(From: Bevington, P.R., Data Reduction and Error Analysis fer the Physical
Sciences, McGraw-Hill, New York, 1969)
i
!
t
l
1
i
__,
R
.g
2^
. f
..
.;[ . . , *
-
.
,
'
,
,
,
' ATTACHMENT 4
, RADIOLOGICAL CONFIRMATORY' MEASUREMENTS RESULTS
1. - ' Reactor Coolant Liquid-(1 Liter Marinelli Beaker)
'(Sampled 08:40, CST, February .10, 1987)
RBS Results. NRC' Results'- RBS/NRC -. Comparison
Nuclide (uCi/ml) (uCi/ml) Ratioi . Decision
24Na 6.48810.385 E-4. 6.41110.118E-4 1.01 . Agreement
5.85710.'353 E-4 0.91 Agreement
6.-15610.368 E-4 0.96 Agreement
s Cr. 1.18710.098 E-3- 1.22010.068E-3 0.97 Agreement
Not Identified
~
Disagreement
1.13810.089 E-3 0.93' Agreement
99Mo 5.425i0.380 E-4 5.03910.329 E-4 1.08 Agreement
5.00610.386 E-4 0.99 Agreement
5.13510.360 E-4 1.02 Agreement
tosRh 6.15810.507 E-4 6.32610.353 E-4 0.97 Agreement
5.97910,526 E-4 0.95 Agreement-
5.94010.467 E-4 0.94 Agreement
'122Sb 6.99110.071 E-5 7.37510.536 E-5 0.95 Agreement
6.22910.069 E-5 0.84 Agreement-
5.02110.069 E-5 0.68 Agreement
187W 1.44510.139 E-4 1.48010.238 E-4 0.98 Agreement
1.24510.015 E-4 0.84 Agreement
-1.33010.131 E-4 0.90 Agreement
98"Tc ,3.69710.292 E-3 4.25010.018 E-3 0.87 Agreement
'3.42910.269 E-3
-
0.81 Disagreement.
3.55810.283 E-3 0.84 Disagreement
13&I 2.27110.063 E-5 3.25710.666 E-5 0.70 . Agreement
2.19510.068 E-5 0.67 Agreement
1.98710.058 E-5 0.61 Agreement
132I 4.51610.170 E-4 4.65710.127 E-4 0.97 Agreement
4.34410.157 E-4 0.93 Agreement
4.63710.167 E-4 0.94 Agreement
133I 2.87810.188 E-4 2.94910.058 E-4 0.98 Agreement
2.72810.184 E-4 0.93 Agreement
2.85910.184 E-4 0.97 Agreement
1341 1.02610.036 E-3 1.05010.038 E-3 0.98 Agreement
9.82210.302 E-4 0.94 Agreement
9.64310.386 E-4 0.92 Agreement
.
--
.
.. -.
2
135I '5.72610.202 E-4 6.27310.224 E-4 0.91 Agreement
5.21910.200 E-4 0.83 Agreement
5.54310.201 E-4 0.88 Agreement
2. Off Gas Sample (15 cc Off Gas Vial)
(Sampled 10:29, CST, February 11,1987)
RBS Results NRC Results RBS/NRC Comparison
Nuclide (uCi/cc) (uCi/cc) Ratio Decision
41Ar 7.14512.444 E-5 5.74411.283 E-5 1.24 Agreement
7.61812.384 E-5 1.33 Agreement
8.48812.521 E-5 1.48 Agreement
85"Kr 1.69710.171 E-4 1.67410.066 E-4 1.01 Agreement
1.50910.202 E-4 0.90 Agreement
1.66110.159 E-4 0.99 Agreement
87Kr 9.83010.912 E-4 1.15310.034 E-3 0.85 Agreement
9.52510.912 E-4 0.83 Agreement
9.98110.946 E-4 0.87 Agreement
88Kr 6.38510.613 E-4 6.03910.333 E-4 1.06 Agreement
7.23310.846 E-4 1.20 Agreement
5.75310.542 E-4 0.95 Agreement
185"Xe 3.57410.468 E-3 2.92610.090 E-3 1.22 Agreement
3.36710.337 E-3 1.15 Agreement
3.34710.643.E-3 1.14 Agreement
135Xe 5.19810.461 E-4 5.27310.122 E-4 0.99 Agreement
4.47310.433 E-4 0.85 Agreement
4.86010.428 E-4 0.92 Agreeement
138Xe 1.54210.104 E-2 1.25010.049 E-2 1.23 Agreement
1.38310.059 E-2 1.11 Agreement
1.33310.155 E-2 1.07 Agreement
3. Particulate Filter Standard (21478-109)
(Standardized 09:00, CST, February 9, 1987)
RBS Results NRC Results RBS/NRC Comparison
Nuclide (uCi/ Sample) (uCi/ Sample) Ratio Decision
109Cd 1.19810.101 E+0 1.11210.003 E+0 1.08 Agreement
1.24510.105 E+0 1.12 Agreement
1.16210.098 E+0 1.04 Agreement
57Co 2.86110.124 E-2 2.58510.010 E-2 1.11 Agreement
2.99410.128 E-2 1.16 Agreement
2.77710.119 E-2 1.07 Agreement
e .. .
!
3.
189Ce 1.83910.122 E-2 1.74010.010 E-2 1.06 Agreement
1.92210.128.E-2 1.10 Agreement
1.84410.123 E-2 1.06 Agreement
203Hg 1.32110.104 E-2 1.38210.012 E-2 0.96 Agreement
1.35910.107 E-2 0.98 Agreement
1.30410.103 E-2 0.94 Agreement
118Sn 3.08110.165 E-2 2.90010.021 E-2 1.06 Agreement
3.21510.170 E-2 1.11 Agreement
2.98510.162 E-2 1.03 Agreement
137Cs 5.12210.252 E-2 4.63510.030 E-2 1.11 Agreement
5.13310.253 E-2 1.11 Agreement
5.03510.248 E-2 1.09 Agreement
88 y 3.91010.152 E-2 3.71610.030 E-2 1.05 Agreement
3.97510.155 E-2 1.07 Agreement
3.88510.152 E-2 1.05 Agreement
GoCo 3.11510.107 E-2 2.94210.029 E-2 1.06 Agreement
3.20610.111 E-2 1.09 Agreement
.3.16210.110 E-2 1.07 Agreement
4. Charcoal Cartridge Standard (21420-109)
l (Standardized 09:00, CST, February 9, 1987)
RBS Results NRC Results RBS/NRC Comparison
Nuclide (uCi/ Sample) (uCi/ Sample) Ratio Decision
109Cd 1.19710.101 E+0 1.16310.003 E+0 1.03 Agreement
1.26010.106 E+0 1.08 Agreement
1.19210.101 E+0 1.03 Agreement
57C0 2.80510.123 E-2 2.63010.011 E-2 1.07 2 Agreement
3.05310.131 E-2 1.16 Agreement
2.84710.124 E-2 1.08 Agreement
139Ce 1.87510.125 E-2 1.78110.011 E-2 1.05 Agreement .
2.02710.135 E-2 1.14 Agreement
1.86110.124 E-2 , 1.05 Agreement
20aHg 1.35910.109 E-2 1.30710.011 E-2 1.04 Agreement
1.35610.107 E-2 1.04 Agreement
1.29810.103 E-2 0.99 Agreement
113Sn 3.12310.169 E-2 2.97610.021 E-2 1.05 Agreement
3.29810.175 E-2 1.11 Agreement
3.04010.165 E-2 1.02 Agreement
I
. o
4
137Cs 5.11710.252 E-2 4.81310.029 E-2 1.06 Agreement
5.35510.264 E-2 1.11 Agreement
5.05210.250 E-2 1.05 Agreement
88 y
3.95610.155 E-2 3.83910.030 E-2 1.03 Agreement
4.19410.164 E-2 1.09 Agreement
3.89310.153 E-2 1.01 Agreement
80Co 3.23310.112 E-2 3.15410.029 E-2 1.03 Agreement
3.37110.117 E-2 1.07 Agreement
3.23810.113 E-2 1.03 Agreement
5. Liquid Waste Sample (1 liter Marinelli)
(Sample 07:50, CST, February 11, 1987)
RBS Results NRC Results RBS/NRC Comparison
Nuclide (uCi/ml) (uCi/ml) Ratio Decision
24Na 5.85610.814 E-7 5.06510.573 E-7 1.16 Agreement
5.13610.781 E-7 1.01 Agreement
5.49410.813 E-7 1.08 Agreement
stCr 2.04410.523 E-6 2.33110.584 E-6 0.88 Agreement
2.09910.569 E-6 0.90 Agreement
1.56810.499 E-6 0.67 Agreement
54Mn 1.87610.090 E-5 1.85110.025 E-5 1.01 Agreement
1.75010.085 E-5 0.95 Agreement
1.83610.088 E-5 0.99 Agreement
58C0 2.21610.107 E-5 2.17610.025 E-5 1.02 Agreement
2.07610.101 E-5 0.95 Agreement
2.14810.105 E-5 0.99 Agreement
80Co 1.87210.074 E-5 1.81610.027 E-5 1.03 Agreement
1.81110.072 E-5 1.00 Agreement
1.78010.071 E-5 0.98 Agreement
85Zn 2.95510.298 E-6 2.67310.238 E-6 1.11 Agreement
2.40910.282 E-6 0.90 Agreement
2.66810.291 E-6 1.00 Agreement
80*Tc 9.86010.908 E-7 8.42010.539 E-7 1.17 Agreement
8.72110.830 E-7 1.04 Agreement
1.00510.096 E-6 1.19 Agreement
- - - _ - . - - - - - . _ - - - - _
,
9:n o \
>
> .
,
5
6. Tritium San >1e
(Sampled Fe)ruary 11,1987)
RSS Results NRC Results R8S/NRC Comparison l
Nuclide (uci/c) (uci/a) Ratio Decision
8H 5.0010.11 E-4 5.6710.58 E-4 0.88 Agreement
7. RESL Liquid Sample ;
(Standardized 12:00, MST, January 11,1986) ,
RBS Results NRC Results RBS/NRC Comparison l
Nuclide (uCi/ml) (uCf/ml) Ratio Decision ;
soSr 1.310.1 E-04 1.4010.04 E-04 0.93 Agreement
.
00Sr 1.510.1 E-05 1.3310.05 E-05 1.13 Agreement _
,
I
55Fe 6.310.2 E-04 8.2610.17 E-05 7.63 Disagreement
aH 1.0010.03 E-04 1.1110.02 E-04 0.90 Agreement ;
137Cs 2.3010.15 E-05 2.1910.07 E-05 1.05 Agreement ;
soCo 2.0910.10 E-05 1.9510.04 E-05 1.07 Agreement
54Mn 1.4710.10 E-05 1.3510.03 E-05 1.09 Agreement l'
l
l
l
I
>
!
l
i
!
!
c
'
I
' -._
. _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _
. .. . . . .. ..... . . . . . . . .. . . . . . . . .
o.
ATTACHMENT 5
.
Criteria for Comparina Analytical Measurements
The following are the criteria used in comparing the results of capability
tests and verification measurements. The criteria are based on an empirical
relationship established through prior experience and this program's analytical
requirements.
In these criteria, the judgement limits vary in relation to the comparison of
the resolution.
NRC VALUE
Resolution = _
NRC UNCERTAlhiY
LICENSEE VALUE
Ratio =
NRC VALUE
Comparisons are made by first determining the resolution and then reading
across the same line to the corresponding ratio. The following table shows the
acceptance values.
!
RESOLUTION AGREEMENT RATIO
l
!
<4 0.4 - 2.5
4-7 0.5 - 2.0
8 - 15 0.6 - 1,66 .
,
16 - 50 0.75 - 1.33
51 - 200 0.80 - 1.25
>200 0.85 - 1.18
l
The above__ criteria are applied to the following analyses:
(1) Gamma Spectrometry.
(2) Tritium analyses of Ilquid samples. ,
(3) Iodine on adsorbers.
(4) av5r and '0Sr determinations.
(5) Gross Beta where samples are counted on the same date using the same
reference nucilde.