Text
m
J
ib
.
MAR 2 41987
In Reply Refer To:
Docket:
50-458/87-03
Gulf States Utilities
ATTN:
Mr. James C. Deddens
Senior Vice President, (RBNG)
Nuclear Licensing
P. O. Box 220
St. Francisville, Louisiana
70775
Gentlemen:
This refers to the inspection conducted by Mr. R. Wise and Dr. J. B. Nicholas
of this office during the period February 9-13, 1987, of activities authorized
by NRC Operating License NPF-47 for the River Bend Station, and to the
discussion of our findings with you and other members of your staff at the
conclusion of the inspection.
Areas examined during the inspection included your chemistry and radiochemistry
programs, postaccident sampling system, and water chemistry and radiochemistry
confirmatory measurements.
Within these areas, the inspection consisted of
selective examination of procedures and representative records, interviews with
personnel, and observations by the NRC inspectors.
The inspection findings are
documented in the enclosed inspection report.
During this inspection, it was found that certain of your activities were in
violation of NRC requirements.
Consequently, you are required to respond to
this violation, in writing, in accordance with the provisions of Section 2.201
of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal
Regulations.
Your response should be based on the specifics contained in the
Notice of Violation enclosed with this letter.
A potential violation of NRC requirement was also identified during the inspection.
However, since this potential violation is related to training, it is not
cited herein as a violation, but is considered to be an unresolved item in
accordance with the Commission Policy Statement on Training and Qualification
of Nuclear Power Plant Personnel (50 FR 11147 dated March 30, 1985).
No
response to the unresolved item is required; however, your attention is
necessary because the unresolved item has the potential for becoming a
violation in the future.
The response directed by this letter and the accompanying Notice is not subject
to the clearance procedures of the Office of Management and Budget as required
by the Paperwork Reduction Act of 1980, PL 96-511.
RIV:FR ~
FRP h
C:FRPS
C:R&SPB
C:R
/A
C:RPB
JNichol[/dp
RWise
BMurray
WLFisher
JPJaudon JEGagli[do
3 /f2J87 9 /p /87
3 l18/87
9/Q/87 y ks/yM
3 //L/87
B703270596 8703'
l
b
ADOCK 0500
58
G
4
- - - - - -
1
.n
.
.
,
-.
-Y
Gulf States' Utilities
2-
-
.
- Should you,have any questions concerning this inspection, we will.be pleased to
discuss them with you.
,
Sincerely,.
e
i
ORIGINAL SIGNED BY:
J. E. Gagliardo, Chief
Reactor Projects Branch
Enclosures:
1.
Appendix A - Notice of Violation
2.
Appendix B - NRC Inspection Report
50-458/87-03
cc w/ enclosures:
Gulf States Utilities
ATTN:
J. E. Booker, Manager-
River Bend Oversight
P. O. Box 2951
Beaumont, Texas
77704
Louisiana State University,
Government Documents Department
Louisiana Radiation Control Program Director
bcc to DMB (IE06)
bec distrib. by.RIV:
- RPB
DRSP
- Resident Inspector
R. D. Martin, RA
- Section Chief (RPB/A)
- D. Weiss, RM/ALF
- MIS System
- B. Murray, FRPS
- RSTS Operator
R. L. Bangart, DRS&S
- R&SPB
- J. B. Nicholas, FRPS
- RIV File
R. Wise, FRPS
- R. Hall
- RSB
- Project Inspector
- W. L. Fisher
- w/766