IR 05000336-06-012, IR 05000423-06-012, 08/21/2006 - 08/25/2006, Millstone Power Station, Units 2 and 3, Physical Protection
ML062770400
Person / Time
Site: Millstone  Dominion icon.png
Issue date: 10/04/2006
From: Ray Lorson
Plant Support Branch 1
To: Christian D
Dominion Resources
References
IR-06-012
Download: ML062770400 (4)


Text

ber 4, 2006

SUBJECT:

MILLSTONE POWER STATION UNITS 2 AND 3 - NRC PHYSICAL SECURITY BASELINE INSPECTION REPORT NOS. 05000336/2006012 AND 05000423/2006012

Dear Mr. Christian:

On August 25, 2006, the U.S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at your Millstone Power Station. The inspection covered one or more of the key attributes of the security cornerstone of the NRCs Reactor Oversight Process. The enclosed report documents the inspection results, which were discussed on August 25, 2006, with Mr. Alan Price, Site Vice-President, and other members of your staff.

The inspection examined activities conducted under your licenses as they relate to security and compliance with the Commissions rules and regulations and with the conditions of your licenses. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel. DETERMINATION Warning: Violation of section 147 of the Atomic MADE BY:

Energy Act, Safeguards Information is subject NAME/TITLE: Raymond K. Lorson, Chief to civil and criminal penalties ORGANIZATION: RI/DRS/PSB1 BASIS: DG-SG-1:_(300) Physical Protection Program SIGNATURE____/RA/__________ DATE:_10/04/06_ Mr. David No findings of significance were identified.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system, ADAMS. ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related information contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letters enclosure will not be available for public inspection.

In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room or from the NRCs document system, ADAMS. If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21.

Sincerely,

/RA/

Raymond K. Lorson, Chief Plant Support Branch 1 Division of Reactor Safety Docket Nos. 50-336, 50-423 License Nos. DPR-65, NPF-49 Enclosure: NRC Inspection Report Nos. 05000336/2006012, 05000423/2006012 w/Attachment: Supplemental Information (CONTAINS (SGI))

cc w/encl w/SGI:

J. Campbell, Manager, Nuclear Security J. Spath, Program Director, New York State Energy Research and Development Authority F. Tabert, Assistant Director, New York State Department of Homeland Security E. Wilds, Director, State of Connecticut SLO Designee Mr. David