ML18138A344

From kanterella
Revision as of 23:54, 5 July 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
2018 Limerick Summary of Public Meeting and Attendance List
ML18138A344
Person / Time
Site: Limerick  Constellation icon.png
Issue date: 05/22/2018
From: Krafty J A
Reactor Projects Region 1 Branch 4
To:
Krafty J A
Shared Package
ML18046A272 List:
References
MN-18-006
Download: ML18138A344 (3)


Text

[Type here]

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BOULEVARD, SUITE 100 KING OF PRUSSIA, PA 19406

-2713 May 22, 2018 MN-18-006 MEETING

SUMMARY

LICENSEE: EXELON GENERATION CO., LLC.

FACILITY: LIMERICK GENERATING STATION, UNITS 1 AND 2

SUBJECT:

SUMMARY

OF PUBLIC MEETING On May 16 , 201 8 , at 4:00 p.m., the U. S. Nuclear Regulatory Commission (NRC) conducted a public open house at a Temporary Office Location of the Limerick Township Municipal Building in Limerick, PA. The NRC conducted the Annual Assessment Meeting to discuss its assessment of the safety performance at Limerick Generating Station (LGS), Units 1 and 2 for 201 7. A notice of the open house was issued on April 23, 201 8, and was posted on the NRC's external (public) Webpage. The meeting notice can be found in the NRC's Agencywide Documents Access and Management System (ADAMS) with Accession No. ML18102A020. ADAMS is accessible from the NRC's Website at: http://www.nrc.gov/reading

-rm/adams.html

. The NRC presented poster boards and handouts and met with members of the public to discuss its assessment of the safety performance of LGS Units 1 and 2 for the period of January 1 through December 31, 201 7, as documented in our letter dated February 28, 2018 (ADAMS Accession No.

ML18047A005). The NRC

's poster boards included background o n the Reactor Oversight Process. Additional information relative to the NRC's Annual Assessment Process and the safety performance of Limerick Generating Station, Units 1 and 2 can be found on the NRC's websit e at https://www.nrc.gov/reactors/operating/oversight.html

. Member s of the public and Exelon officials attended the open

-house and were offered the opportunity to question the NRC regarding Limerick Generating Station's performance and the role of the agency in ensuring safe plant operations.

___________/RA/__________ James A. Krafty, Acting Chief Projects Branch 4 Division of Reactor Projects

Enclosure:

Attendance List (ADAMS No. ML18138A344

)

2

SUBJECT:

SUMMARY

OF PUBLIC MEETING ON MAY 16, 2018, DATED MAY 22, 2018 DISTRIBUTION: (e-mail) DLew, RA DCollins, DRA MGray, DRP DPelton, DRP MFerdas, DRP JYerokun, DRS BWelling, DRS JKrafty, BC SBarber, DRP ATurilin, DRP SRutenkroger, DRP, SRI MFannon, DRP, RI NEsch, DRP, AA JBowen, RI, OEDO RidsNrrPMLimerick Resource RidsNrrDorlLpl1 Resource ROPreports Resource DOCUMENT NAME:

G:\DRP\BRANCH4\Communications

\PUBLIC MEETINGS

\2018\2018 LIMERICK Annual Assessment Meeting Summary.docx ADAMS PKG NO. ML 18046A272 ADAMS ACCESSION NUMBER:

ML18138A344 SUNSI Review Non-Sensitive Sensitive Publicly Available Non-Publicly Available OFFICE RI/DRP RI/DRP NAME SBarber JKrafty DATE 05/18/18 05/22/18 OFFICIAL RECORD COP Y

LIMERICK GENERATING STATION 2018 Open House ATTENDANCE LIST Name Organization Charles J. Wood Stony Creek Anglers James Watters Stony Creek Anglers Emily Ryan LGS Bob Dickinson LGS John McGee LGS Tony Hightower LGS Rick Libra LGS