LG-15-014 Verification of Readiness for Supplemental Inspection at Limerick Generating Station
ML15028A450
Person / Time
Site: Limerick  Constellation icon.png
Issue date: 01/27/2015
From: Kemper K
Exelon Generation Co
To: Fred Bower
Reactor Projects Region 1 Branch 4
bower, fl
References
LG-15-014 IR 2014009
Download: ML15028A450 (1)


Text

LG-15-014 January 27, 2015 To: Fred Bower From: Keith Kemper

Subject:

Verification of Readiness for Supplemental Inspection at Limerick Generating Station

Reference:

Letter from NRC to Exelon, Assessment Follow-Up Letter for Limerick Generating Stations, Units 1 and 2 (Report 05000352/2014009 and 05000353/2014009)

This letter is to notify the NRC that Limerick Generating Station is ready for the NRC to conduct the supplemental inspection contained in the referenced letter. We request the inspection to be performed during the week of February 16, 2015.

If you have any questions, please contact Keith Kemper at (610) 718-2010.

cc: A. Dimitriadis S. Rutenkroger E. DiPaolo J. Cherubini, bcc: T. Dougherty D. Lewis M. Gillin R. Dickinson