IR 05000334/2015006

From kanterella
Revision as of 13:00, 30 June 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
ROP 16 Annual Assessment Letter for Beaver Valley Power Station, Units 1 & 2 (Report 05000334/2015006 and 05000412/2015006)
ML16054A769
Person / Time
Site: Beaver Valley
Issue date: 03/02/2016
From: Kennedy S R
NRC/RGN-I/DRP/PB6
To: Richey M
FirstEnergy Nuclear Operating Co
Shared Package
ML16039A100 List:
References
IR 2015006
Download: ML16054A769 (6)


Text

March 2, 2016

Mr. Marty Richey Site Vice President FirstEnergy Nuclear Operating Company Beaver Valley Power Station P.O. Box 4 Shippingport, PA 15077

SUBJECT: ANNUAL ASSESSMENT LETTER FOR BEAVER VALLEY POWER STATION, UNIT NOS. 1 AND 2 (REPORT 05000334/2015006 AND 05000412/2015006)

Dear Mr. Richey:

On February 9, 2016, the U. S. Nuclear Regulatory Commission (NRC) completed its end-of-cycle performance review of Beaver Valley Power Station, Unit Nos. 1 and 2. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from January 1, 2015, through December 31, 2015. This letter informs inspections at your facility. The NRC determined that overall, Beaver Valley Power Station, Unit Nos. 1 and 2, operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at Beaver Valley Power Station, Unit Nos. 1 and 2 during the most recent quarter was within the Licensee Response Column of the NRCs Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility. The enclosed inspection plan lists the inspections scheduled through December 31, 2017. Routine inspections performed by resident inspectors are not included in the inspection plan. In addition to baseline inspections, the NRC will perform Inspection Procedure (IP) 60855.1, Operation of an ISFSI Independent Spent Fuel Storage Installation at Operating Plants The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security related inspections, which will be sent via separate, non-publicly available correspondence. In response to the accident at Fukushima, the Commission issued Order EA-12-Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-guidance and strategies to maintain or restore core cooling, containment, and spent fuel pool cooling capabilities following a beyond-design-basis external event. Additionally, the Commission issued Order EA-12- remotely monitoring wide-range Spent Fuel Pool levels to support effective prioritization of event mitigation and recovery actions in the event of a beyond-design-basis external event. The NRC is conducting audits of licensee efforts towards compliance with these Orders. The audit was completed for Beaver Valley Power Station Unit Nos. 1 and 2, and the information gathered will aid staff in development of the Final Safety Evaluation for the site. After the NRC staff receives the Final Compliance letter for the site, the Final Safety Evaluation will be issued. Then, the NRC staff will confirm through inspections the full implementation of the orders mentioned above by performing TI 2515- and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communications/Staffing/Multi- In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Please contact me at (610) 337-5046 with any questions you have regarding this letter.

Sincerely,/RA/ Silas R. Kennedy, Chief Projects Branch 6 Division of Reactor Projects Docket Nos. 50-334 and 50-412 License Nos. DPR-66 and NPF-73

Enclosure:

Beaver Valley Power Station Inspection/Activity Plan cc w/encl: Distribution via ListServ

ML16054A769 SUNSI Review Non-Sensitive Sensitive Publicly Available Non-Publicly Available OFFICE RI/DRP RI/DRP RI/DRP NAME JKrafty/ JK via email SShaffer/ SWS SKennedy/ SRK DATE 02/ 23 /16 02 / 23 /16 02/ 23 /16 Page 1 of 3 02/02/2016 12:54:40Report 22 UnitNumberPlanned Dates Start EndInspection ActivityTitleNo. of Staff on SiteBeaver ValleyInspection / Activity Plan 01/01/2016

-12/31/20177111111B-BV1 REQUAL INSP W/ P/F RESULTS 21 IPLicensed Operator Requalification Program7111111B04/11/2016 04/15/201671124-RAD SAFETY INSPECTION 11,2 IPRadiological Hazard Assessment and Exposure Controls71124.0103/07/201603/11/2016 1,2 IPOccupational ALARA Planning and Controls71124.0203/07/201603/11/2016 1,2 IPIn-Plant Airborne Radioactivity Control and Mitigation71124.0303/07/201603/11/2016 1,2 IPOccupational Dose Assessment71124.0403/07/201603/11/2016 EP-EP EXERCISE EVALUATION 41,2 IPExercise Evaluation711140106/13/2016 06/17/20167111107T-TRIENNIAL HEAT SINK 11,2 IPHeat Sink Performance7111107T05/16/2016 05/20/2016 EXM10/3-BEAVER VALLEY 1 INITIAL EXAM 61 FY17-BV1 INITIAL OPERATOR LICENSING EXAM U0192209/12/2016 09/16/2016 1 FY17-BV1 INITIAL OPERATOR LICENSING EXAM U0192210/31/201611/11/20167111117T-PERMANENT PLANT MODIFICATIONS 31,2 IPEvaluations of Changes, Tests, and Experiments and Permanent Plant Modifications7111117T06/06/2016 06/10/2016 1,2 IPEvaluations of Changes, Tests, and Experiments and Permanent Plant Modifications7111117T06/20/2016 06/24/201671124-RAD SAFETY INSPECTION 31,2 IPRadiation Monitoring Instrumentation71124.0507/11/2016 07/15/2016 1,2 IPRadioactive Gaseous and Liquid Effluent Treatment71124.0607/11/2016 07/15/2016 1,2 IPRadiological Environmental Monitoring Program71124.0707/11/2016 07/15/2016 1,2 IPRETS/ODCM Radiological Effluent Occurrences71151-PR0107/11/2016 07/15/201671124-RAD SAFETY INSPECTION 11,2 IPRadiological Hazard Assessment and Exposure Controls71124.0110/03/2016 10/07/2016 1,2 IPOccupational ALARA Planning and Controls71124.0210/03/2016 10/07/2016 1,2 IPIn-Plant Airborne Radioactivity Control and Mitigation71124.0310/03/2016 10/07/2016 1,2 IPOccupational Dose Assessment71124.0410/03/2016 10/07/20167111108P-BV U1 INSERVICE INSPECTION 21 IPInservice Inspection Activities - PWR7111108P10/03/2016 10/14/201671124-RAD SAFETY INSPECTION 11,2 IPRadiological Hazard Assessment and Exposure Controls71124.0112/12/2016 12/16/2016 1,2 IPOccupational ALARA Planning and Controls71124.0212/12/2016 12/16/2016 1,2 IPIn-Plant Airborne Radioactivity Control and Mitigation71124.0312/12/2016 12/16/2016 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.

Page 2 of 3 02/02/2016 12:54:40Report 22 UnitNumberPlanned Dates Start EndInspection ActivityTitleNo. of Staff on SiteBeaver ValleyInspection / Activity Plan 01/01/2016

-12/31/201771124-RAD SAFETY INSPECTION 11,2 IPOccupational Dose Assessment71124.0412/12/2016 12/16/2016 1,2 IPOccupational Exposure Control Effectiveness71151-OR01 12/12/2016 12/16/201671124.08-RADWASTE11,2 IPRadioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation71124.0812/05/2016 12/09/201671124-HP INSPECTION 11,2 IPRadiological Hazard Assessment and Exposure Controls71124.0104/10/2017 04/14/2017 1,2 IPOccupational ALARA Planning and Controls71124.0204/10/2017 04/14/2017 1,2 IPIn-Plant Airborne Radioactivity Control and Mitigation71124.0304/10/2017 04/14/20177111108P-U2 INSERVICE INSPECTION 2 2 IPInservice Inspection Activities - PWR7111108P04/10/2017 04/21/20177111111B-BV2 REQUAL INSP WITH P/F RESULTS 2 2 IPLicensed Operator Requalification Program7111111B06/19/2017 06/23/201710/8EXAM-BEAVER VALLEY 2 INITIAL EXAM 6 2 FY18-BV2 INITIAL OPERATOR LICENSING EXAM U0193809/11/2017 09/15/2017 2 FY18-BV2 INITIAL OPERATOR LICENSING EXAM U0193810/09/2017 10/20/2017 EP-EP PROGRAM INSPECTION 21,2 IPAlert and Notification System Testing711140206/19/2017 06/23/2017 1,2 IPEmergency Preparedness Organization Staffing and Augmentation System711140306/19/2017 06/23/2017 1,2 IPCorrection of Emergency Preparedness Weaknesses and Deficiencies711140506/19/2017 06/23/2017 1,2 IPPerformance Indicator Verification7115106/19/2017 06/23/201771124-HP INSPECTION 11,2 IPOccupational Dose Assessment71124.0406/05/2017 06/09/2017 1,2 IPRadiation Monitoring Instrumentation71124.0506/05/2017 06/09/201771152B-PI&R BIENNIAL 21,2 IPProblem Identification and Resolution71152B06/01/2017 06/05/2017 1,2 IPProblem Identification and Resolution71152B06/15/2017 06/19/2017TI-191-FUKUSHIMA LESSON LEARNED 11,2 IPInspection of Licensee's Responses to Order EA-12-049, EA-12-051 & EP Info Request March 12, 2012 2515/19107/10/2017 07/15/2017 ISFSI-ISFSI LOADING CAMPAIGN INSPECTION 11,2 IPOperation Of An ISFSI 6085507/24/2017 07/28/2017 1,2 IPOperation of an Independent Spent Fuel Storage Installation at Operating Plants 60855.107/24/2017 07/28/2017 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.

Page 3 of 3 02/02/2016 12:54:40Report 22 UnitNumberPlanned Dates Start EndInspection ActivityTitleNo. of Staff on SiteBeaver ValleyInspection / Activity Plan 01/01/2016

-12/31/201771124-HP INSPECTION 11,2 IPRadiological Hazard Assessment and Exposure Controls71124.0110/16/2017 10/20/2017 1,2 IPOccupational ALARA Planning and Controls71124.0210/16/2017 10/20/2017 1,2 IPIn-Plant Airborne Radioactivity Control and Mitigation71124.0310/16/2017 10/20/2017 1 IPOccupational Exposure Control Effectiveness71151-OR01 10/16/2017 10/20/2017 1 IPRETS/ODCM Radiological Effluent Occurrences71151-PR01 10/16/2017 10/20/20177111121-CDBI91,2 IPComponent Design Bases Inspection711112110/16/2017 10/20/2017 1,2 IPComponent Design Bases Inspection711112110/30/201711/03/2017 1,2 IPComponent Design Bases Inspection711112111/13/201711/17/2017 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.