IR 05000334/2015006

From kanterella
(Redirected from IR 05000412/2015006)
Jump to navigation Jump to search
ROP 16 Annual Assessment Letter for Beaver Valley Power Station, Units 1 & 2 (Report 05000334/2015006 and 05000412/2015006)
ML16054A769
Person / Time
Site: Beaver Valley
Issue date: 03/02/2016
From: Silas Kennedy
NRC/RGN-I/DRP/PB6
To: Richey M
FirstEnergy Nuclear Operating Co
Shared Package
ML16039A100 List:
References
IR 2015006
Download: ML16054A769 (6)


Text

UNITED STATES rch 2, 2016

SUBJECT:

ANNUAL ASSESSMENT LETTER FOR BEAVER VALLEY POWER STATION, UNIT NOS. 1 AND 2 (REPORT 05000334/2015006 AND 05000412/2015006)

Dear Mr. Richey:

On February 9, 2016, the U. S. Nuclear Regulatory Commission (NRC) completed its end-of-cycle performance review of Beaver Valley Power Station, Unit Nos. 1 and 2. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from January 1, 2015, through December 31, 2015. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility.

The NRC determined that overall, Beaver Valley Power Station, Unit Nos. 1 and 2, operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at Beaver Valley Power Station, Unit Nos. 1 and 2 during the most recent quarter was within the Licensee Response Column of the NRCs Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility.

The enclosed inspection plan lists the inspections scheduled through December 31, 2017.

Routine inspections performed by resident inspectors are not included in the inspection plan.

In addition to baseline inspections, the NRC will perform Inspection Procedure (IP) 60855.1, Operation of an ISFSI Independent Spent Fuel Storage Installation at Operating Plants. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security related inspections, which will be sent via separate, non-publicly available correspondence.

In response to the accident at Fukushima, the Commission issued Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events. This Order requires licensees to develop, implement, and maintain guidance and strategies to maintain or restore core cooling, containment, and spent fuel pool cooling capabilities following a beyond-design-basis external event. Additionally, the Commission issued Order EA-12-051, Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation. This Order requires licensees to have a reliable means of remotely monitoring wide-range Spent Fuel Pool levels to support effective prioritization of event mitigation and recovery actions in the event of a beyond-design-basis external event. The NRC is conducting audits of licensee efforts towards compliance with these Orders. The audit was completed for Beaver Valley Power Station Unit Nos. 1 and 2, and the information gathered will aid staff in development of the Final Safety Evaluation for the site. After the NRC staff receives the Final Compliance letter for the site, the Final Safety Evaluation will be issued. Then, the NRC staff will confirm through inspections the full implementation of the orders mentioned above by performing TI 2515-191, Inspection of the Implementation of Mitigating Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communications/Staffing/Multi-Unit Dose Assessment Plans.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact me at (610) 337-5046 with any questions you have regarding this letter.

Sincerely,

/RA/

Silas R. Kennedy, Chief Projects Branch 6 Division of Reactor Projects Docket Nos. 50-334 and 50-412 License Nos. DPR-66 and NPF-73 Enclosure: Beaver Valley Power Station Inspection/Activity Plan cc w/encl: Distribution via ListServ

ML16054A769 SUNSI Review Non-Sensitive Publicly Available Sensitive Non-Publicly Available OFFICE RI/DRP RI/DRP RI/DRP NAME JKrafty/ JK via email SShaffer/ SWS SKennedy/ SRK DATE 02/ 23 /16 02 / 23 /16 02/ 23 /16

Page 1 of 3 Beaver Valley 02/02/2016 12:54:40 Inspection / Activity Plan Report 22 01/01/2016 - 12/31/2017 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site 7111111B - BV1 REQUAL INSP W/ P/F RESULTS 2 1 04/11/2016 04/15/2016 IP 7111111B Licensed Operator Requalification Program 71124 - RAD SAFETY INSPECTION 1 1, 2 03/07/2016 03/11/2016 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1, 2 03/07/2016 03/11/2016 IP 71124.02 Occupational ALARA Planning and Controls 1, 2 03/07/2016 03/11/2016 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1, 2 03/07/2016 03/11/2016 IP 71124.04 Occupational Dose Assessment EP - EP EXERCISE EVALUATION 4 1, 2 06/13/2016 06/17/2016 IP 7111401 Exercise Evaluation 7111107T - TRIENNIAL HEAT SINK 1 1, 2 05/16/2016 05/20/2016 IP 7111107T Heat Sink Performance EXM10/3 - BEAVER VALLEY 1 INITIAL EXAM 6 1 09/12/2016 09/16/2016 U01922 FY17-BV1 INITIAL OPERATOR LICENSING EXAM 1 10/31/2016 11/11/2016 U01922 FY17-BV1 INITIAL OPERATOR LICENSING EXAM 7111117T - PERMANENT PLANT MODIFICATIONS 3 1, 2 06/06/2016 06/10/2016 IP 7111117T Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications 1, 2 06/20/2016 06/24/2016 IP 7111117T Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications 71124 - RAD SAFETY INSPECTION 3 1, 2 07/11/2016 07/15/2016 IP 71124.05 Radiation Monitoring Instrumentation 1, 2 07/11/2016 07/15/2016 IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment 1, 2 07/11/2016 07/15/2016 IP 71124.07 Radiological Environmental Monitoring Program 1, 2 07/11/2016 07/15/2016 IP 71151-PR01 RETS/ODCM Radiological Effluent Occurrences 71124 - RAD SAFETY INSPECTION 1 1, 2 10/03/2016 10/07/2016 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1, 2 10/03/2016 10/07/2016 IP 71124.02 Occupational ALARA Planning and Controls 1, 2 10/03/2016 10/07/2016 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1, 2 10/03/2016 10/07/2016 IP 71124.04 Occupational Dose Assessment 7111108P - BV U1 INSERVICE INSPECTION 2 1 10/03/2016 10/14/2016 IP 7111108P Inservice Inspection Activities - PWR 71124 - RAD SAFETY INSPECTION 1 1, 2 12/12/2016 12/16/2016 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1, 2 12/12/2016 12/16/2016 IP 71124.02 Occupational ALARA Planning and Controls 1, 2 12/12/2016 12/16/2016 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Page 2 of 3 Beaver Valley 02/02/2016 12:54:40 Inspection / Activity Plan Report 22 01/01/2016 - 12/31/2017 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site 71124 - RAD SAFETY INSPECTION 1 1, 2 12/12/2016 12/16/2016 IP 71124.04 Occupational Dose Assessment 1, 2 12/12/2016 12/16/2016 IP 71151-OR01 Occupational Exposure Control Effectiveness 71124.08 - RADWASTE 1 1, 2 12/05/2016 12/09/2016 IP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 71124 - HP INSPECTION 1 1, 2 04/10/2017 04/14/2017 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1, 2 04/10/2017 04/14/2017 IP 71124.02 Occupational ALARA Planning and Controls 1, 2 04/10/2017 04/14/2017 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 7111108P - U2 INSERVICE INSPECTION 2 2 04/10/2017 04/21/2017 IP 7111108P Inservice Inspection Activities - PWR 7111111B - BV2 REQUAL INSP WITH P/F RESULTS 2 2 06/19/2017 06/23/2017 IP 7111111B Licensed Operator Requalification Program 10/8EXAM - BEAVER VALLEY 2 INITIAL EXAM 6 2 09/11/2017 09/15/2017 U01938 FY18-BV2 INITIAL OPERATOR LICENSING EXAM 2 10/09/2017 10/20/2017 U01938 FY18-BV2 INITIAL OPERATOR LICENSING EXAM EP - EP PROGRAM INSPECTION 2 1, 2 06/19/2017 06/23/2017 IP 7111402 Alert and Notification System Testing 1, 2 06/19/2017 06/23/2017 IP 7111403 Emergency Preparedness Organization Staffing and Augmentation System 1, 2 06/19/2017 06/23/2017 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 1, 2 06/19/2017 06/23/2017 IP 71151 Performance Indicator Verification 71124 - HP INSPECTION 1 1, 2 06/05/2017 06/09/2017 IP 71124.04 Occupational Dose Assessment 1, 2 06/05/2017 06/09/2017 IP 71124.05 Radiation Monitoring Instrumentation 71152B - PI&R BIENNIAL 2 1, 2 06/01/2017 06/05/2017 IP 71152B Problem Identification and Resolution 1, 2 06/15/2017 06/19/2017 IP 71152B Problem Identification and Resolution TI-191 - FUKUSHIMA LESSON LEARNED 1 1, 2 07/10/2017 07/15/2017 IP 2515/191 Inspection of Licensee's Responses to Order EA-12-049, EA-12-051 & EP Info Request March 12, 2012 ISFSI - ISFSI LOADING CAMPAIGN INSPECTION 1 1, 2 07/24/2017 07/28/2017 IP 60855 Operation Of An ISFSI 1, 2 07/24/2017 07/28/2017 IP 60855.1 Operation of an Independent Spent Fuel Storage Installation at Operating Plants This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Page 3 of 3 Beaver Valley 02/02/2016 12:54:40 Inspection / Activity Plan Report 22 01/01/2016 - 12/31/2017 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site 71124 - HP INSPECTION 1 1, 2 10/16/2017 10/20/2017 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1, 2 10/16/2017 10/20/2017 IP 71124.02 Occupational ALARA Planning and Controls 1, 2 10/16/2017 10/20/2017 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1 10/16/2017 10/20/2017 IP 71151-OR01 Occupational Exposure Control Effectiveness 1 10/16/2017 10/20/2017 IP 71151-PR01 RETS/ODCM Radiological Effluent Occurrences 7111121 - CDBI 9 1, 2 10/16/2017 10/20/2017 IP 7111121 Component Design Bases Inspection 1, 2 10/30/2017 11/03/2017 IP 7111121 Component Design Bases Inspection 1, 2 11/13/2017 11/17/2017 IP 7111121 Component Design Bases Inspection This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.