ML22166A018

From kanterella
Revision as of 20:02, 17 November 2024 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Summary of June 13, 2022, Closed Meeting with Duke Energy Progress, Llc to Discuss Licensee Responses Provided to a Request for Additional Information Associated with a License Amendment Request to Adopt Technical Specifications Task Force
ML22166A018
Person / Time
Site: Robinson Duke Energy icon.png
Issue date: 07/07/2022
From: Luke Haeg
Plant Licensing Branch II
To: Kapopoulos E
Duke Energy Progress
Haeg L
References
EPID L-2021-LLA-0222
Download: ML22166A018 (3)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001

July 7, 2022

LICENSEE: Duke Energy Progress, LLC

FACILITY: Robinson Steam Electric Plant, Unit No. 2

SUBJECT:

SUMMARY

OF JUNE 13, 2022, CLOSED MEETING WITH DUKE ENE RGY PROGRESS, LLC TO DISCUSS LICENSEE RESPONSES PROVIDED TO A REQUEST FOR ADDITIONAL INFORMATION ASSOCIATED WITH A LICENSE AMENDMENT REQUEST TO ADOPT TECHNICAL SPECIFICATIONS TASK FORCE TSTF-577, REVISED FREQUE NCIES FOR STEAM GENERATOR TUBE INSPECTIONS FOR ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 (EPID L-2021-LLA-0222)

On June 13, 2022, a closed meeting was held between the U.S. Nuclear Regulatory Commission (NRC) and representatives of Duke Energy Progress, L LC (Duke Energy, the licensee), Westinghouse, and the Electric Power Research Instit ute (EPRI) via teleconference.

This meeting was closed to the public due to discussion of proprietary information. The purpose of the meeting was to discuss the licensees responses (Agencywide Documents Access and Management System (ADAMS) Accession No. ML22118A336) provided to a request for additional information (RAI) (ML22080A004) associated with a De cember 9, 2021, license amendment request (LAR) to adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections, for Robinson Steam Electric Plant, Unit No. 2 (Robinson) (ML21343A047),

as supplemented on January 6, 2022 (ML22006A240). The LAR was a ssociated with revising technical specifications (TS) related to steam generator (SG) t ube inspections to extend the inspection interval for SG tubing. The meeting notice and agend a dated May 25, 2022, are available in ADAMS (ML22145A405). A list of attendees is provid ed as an enclosure.

The NRC staff and licensee discussed the response to RAI 1b and the use of a recently published EPRI Plus Point to X-Probe Probe Transfer Function Re port to develop a revised plant-specific, probability of detection curve. The NRC staff p rovided feedback from an initial evaluation of the EPRI transfer function report. The staff quer ied whether the licensee had performed sensitivity studies with potential analytical changes relative to the previous analysis to determine the effect on probability of burst results. The licensee intends to provide the NRC a timeline for supplying additional information that would ultimately be submitted in the form of a supplement to the RAI response.

No members of the public were in attendance. No regulatory decisions were made at this meeting.

Please direct any inquiries to me at 301-415-0272, or Lucas.Haeg@nrc.gov.

/RA/

Lucas Haeg, Project Manager Plant Licensing Branch II-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation

Docket No. 50-261

Enclosure:

List of Attendees

cc w/ enclosure: Listserv

LIST OF ATTENDEES

JUNE 13, 2022, CLOSED MEETING WITH DUKE ENERGY PROGRESS, LLC

TO DISCUSS LICENSEE RESPONSES PROVIDED TO A REQUEST FOR ADDITIONAL

INFORMATION ASSOCIATED WITH A LICENSE AMENDMENT REQUEST TO ADOPT

TECHNICAL SPECIFICATIONS TASK FORCE (TSTF)-577, REVISED FREQUENCIES FOR

STEAM GENERATOR TUBE INSPECTIONS, FOR ROBINSON STEAM ELECTRIC PLANT,

UNIT NO. 2 (EPID L-2021-LLA-0222)

Nuclear Regulatory Commission Tanya Hood Steven Bloom Gregory Makar Andy Johnson Paul Klein Pat Purtcher Luke Haeg

Duke Energy Progress, LLC Jordan Vaughan Dan Mayes Marie Turner Ryan Treadway

Westinghouse Jay Smith Rob Chappo Logan Clark

Electric Power Research Institute Helen Cothron Rich Guill

Enclosure

ML22166A018 OFFICE NRR/DORL/LPL2-2/PM NRR/DORL/LPL2-2/LA NRR/DNRL/NCSG/BC NAME LHaeg RButler SBloom DATE 6/15/2022 06/21/2022 6/22/2022 OFFICE NRR/DORL/LPL2-2/BC NRR/DORL/LPL2-2/PM NAME DWrona LHaeg DATE 6/23/2022 6/7/2022