Letter Sequence Meeting |
---|
|
|
MONTHYEARRA-22-0017, Supplement to Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections2022-01-0606 January 2022 Supplement to Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections Project stage: Supplement ML22012A3662022-01-12012 January 2022 Acceptance of Requested Licensing Action License Amendment Re2uest for Application to Revise Technical Specification to Adopt TSTF-577, Revised Frequencies for Steam Generating Tube Inspections Project stage: Acceptance Review ML22080A0042022-03-18018 March 2022 Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections Project stage: RAI RA-22-0106, Response to Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections2022-04-28028 April 2022 Response to Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections Project stage: Response to RAI ML22125A1942022-05-12012 May 2022 Request for Withholding Information from Public Disclosure for H.B. Robinson Steam Electric Plant, Unit 2 Project stage: Withholding Request Acceptance PMNS20220536, Duke Energy Progress, LLC Discussion Regarding TSTF-577 Request for Additional Information Response Regarding for the H. B. Robinson Steam Electric Plant, Unit No. 22022-05-25025 May 2022 Duke Energy Progress, LLC Discussion Regarding TSTF-577 Request for Additional Information Response Regarding for the H. B. Robinson Steam Electric Plant, Unit No. 2 Project stage: RAI ML22166A0182022-07-0707 July 2022 Summary of June 13, 2022, Closed Meeting with Duke Energy Progress, Llc to Discuss Licensee Responses Provided to a Request for Additional Information Associated with a License Amendment Request to Adopt Technical Specifications Task Force Project stage: RAI RA-22-0210, Supplement to License Amendment Request to Adopt Technical Specifications Task Force (TSTF) Traveler TSTF-577, Revised Frequencies for Steam Generator Tube Inspections2022-07-28028 July 2022 Supplement to License Amendment Request to Adopt Technical Specifications Task Force (TSTF) Traveler TSTF-577, Revised Frequencies for Steam Generator Tube Inspections Project stage: Supplement ML22213A0682022-08-0505 August 2022 Request for Withholding Information from Public Disclosure for H. B. Robinson Steam Electric Plant, Unit 2 Project stage: Withholding Request Acceptance PMNS20220916, Public Meeting with Duke Energy to Discuss a Planned TSTF-577, Revised Frequencies for Steam Generator Tube Inspections, Revision 1, License Amendment Request Supplement for H. B. Robinson Steam Electric Plant, Unit No. 22022-09-0909 September 2022 Public Meeting with Duke Energy to Discuss a Planned TSTF-577, Revised Frequencies for Steam Generator Tube Inspections, Revision 1, License Amendment Request Supplement for H. B. Robinson Steam Electric Plant, Unit No. 2 Project stage: Meeting ML22257A2392022-09-14014 September 2022 Presentation Slides for September 14, 2022, Observation Public Meeting Project stage: Meeting ML22262A2882022-10-0303 October 2022 Summary of September 14, 2022, Observation Public Meeting with Duke Energy Progress, LLC to Discuss a Planned TSTF-577, Rev. 1, License Amendment Request Supplement for H. B. Robinson Steam Electric Plant, Unit No. 2 Project stage: Meeting RA-22-0280, Supplement to License Amendment Request to Adopt Technical Specifications Task Force (TSTF) Traveler TSTF-577, Revised Frequencies for Steam Generator Tube Inspections2022-10-0404 October 2022 Supplement to License Amendment Request to Adopt Technical Specifications Task Force (TSTF) Traveler TSTF-577, Revised Frequencies for Steam Generator Tube Inspections Project stage: Supplement ML22294A0922022-12-15015 December 2022 Issuance of Amendment No. 273 Regarding Adoption of TSTF-577, Revised Frequencies for Steam Generator Tube Inspections, Revision 1 Project stage: Approval 2022-04-28
[Table View] |
|
---|
Category:Slides and Viewgraphs
MONTHYEARML23087A2922023-04-12012 April 2023 2022 Annual Assessment Meeting ML22301A1662022-09-29029 September 2022 Presentation 4 - Recent Biennial PI&R Team Inspection Insights ML22251A2352022-09-14014 September 2022 Presentation Slides for September 14, 2022, Observation Public Meeting ML22257A2392022-09-14014 September 2022 Presentation Slides for September 14, 2022, Observation Public Meeting ML22151A2652022-05-31031 May 2022 Presubmittal Licensee Presentation for 3.3.2 ESFAS Proposed LAR ML22109A2122022-04-20020 April 2022 Duke Energy Pre-Submittal Public April 20, 2022, Meeting Presentation ML22083A1072022-03-30030 March 2022 Presubmittal Licensee Presentation for SR 3.8.1.16 Proposed License Amendment Request (EPID L-2022-LRM-0021) (Slides) ML22007A2592022-02-0202 February 2022 Presubmittal Licensee Presentation for TS 3.5.3 PIV Testing LAR ML21322A3262021-11-29029 November 2021 Duke Energy November 29, 2021 Pre-Submittal Public Meeting Slides for EOF Relocation Licensing Amendment Request ML21174A3212021-06-24024 June 2021 Licensee Presentation for Robinson Presubmittal Meeting TSTF 577, Rev. 1 ML21167A0852021-06-24024 June 2021 Licensee Presentation for Robinson Pre-submittal Meeting TSTF-577 ML21105A7522021-04-15015 April 2021 2020 Robinson - EOC Presentation Slides ML21053A0472021-02-25025 February 2021 Duke Energy Pre-Submittal Meeting - February 25, 2021 - H. B. Robinson 3rd Interval Containment ISI Relief Request ML20132A0002020-05-11011 May 2020 EOC Presentation ML19318F2912019-11-18018 November 2019 Duke Energy Presentation for the Pre-submittal Meeting on November 18, 2019, Regarding the RPV Stud Examination Relief Request ML19214A0562019-08-0707 August 2019 Presentation: Duke Energy Presubmittal Meeting - August 7, 2019 ML17331A6272017-11-29029 November 2017 Duke Energy Pre-Submittal Meeting Presentation, Brunswick, Harris, and Robinson License Amendment Requests Regarding 10 CFR 50.69 ML17244A2272017-09-0707 September 2017 Duke Energy Presentation - H.B. Robinson 2017-09-07 Pre-sub Transmission Upgrade Meeting ML17200C7802017-07-19019 July 2017 Duke Energy Pre-submittal Meeting Presentation, August 3, 2017, Harris and Robinson License Amendment Request to Support the Transition to Duke Non-LOCA Analysis Methods, MF9824, MF9825 ML16112A2932016-05-0202 May 2016 05/02/2016 Presentation for Closed Pre-Submittal Meeting with Duke Energy Progress, Inc., to Discuss Fuel Reload Design Methodology Reports and Proposed LAR Re. H. B. Robinson And Shearon Harris Plants (CAC Nos. MF7443 And MF7444) ML16105A3342016-04-20020 April 2016 H. B. Robinson Steam Electric Plant, Unit 2 - April 20, 2016, Duke Energy Presentation for 24-Month Fuel Cycle Pre-submittal Meeting (CAC No. MF7503) ML15231A6062015-08-19019 August 2015 Duke Energy Presentation - Robinson Nuclear Plant Transmission Upgrade Pre-submittal Meeting 08-26-2015 - MF6477 ML15099A5872015-04-14014 April 2015 Duke Energy Slides for April 14 Meeting on NFPA-805 for Catawba, McGuire and Robinson ML14181A0782014-06-30030 June 2014 June 30 NRC Slides for Public Meeting with Duke - NTTF 2.1 - Seismic Reevaluation - GMRS ML14154A0932014-06-0303 June 2014 May 28, 2014, Summary of Category 1 Public Meeting - Annual Assessment of H.B. Robinson Steam Electric Plant ML13312A9882013-11-0808 November 2013 Summary of Public Meeting with Duke Energy Carolinas, LLC, to Provide Opportunities to Discuss the Planned Fukushima-Related Modifications ML13308A0072013-11-0101 November 2013 Open Phase Resolution Update Meeting Duke Energy Entitled Open Phase Detection and Protection. ML13238A0542013-08-23023 August 2013 Meeting Summary - Category 1 Public Meeting Regulatory Conference, H.B. Robinson Steam Electric Plant, Docket No. 50-261 ML13150A0742013-05-29029 May 2013 Meeting Summary - Category 1 Public Meeting - Annual Assessment of H.B. Robinson Steam Electric Plant ML13127A0802013-04-18018 April 2013 Fleet Fire Protection Program NFPA 805 National Fire Protection Association NFPA 805 Pre-LAR Application for CNS, MNS, RNP ML12107A3552012-04-16016 April 2012 4/11/2012 Summary of Category 1 Public Meeting - Annual Assessment of H.B. Robinson Steam Electric Plant ML1124200662011-08-30030 August 2011 Meeting Summary - Robinson - NRC Slides ML1124200682011-08-30030 August 2011 Meeting Summary - Robinson - Progress Energy Slides ML1123601792011-08-24024 August 2011 8/25/2011- Robinson Nuclear Plant Regulatory Performance Meeting Slides ML1123603572011-08-24024 August 2011 Meeting Slides ML12083A0492011-07-20020 July 2011 Meeting Slides - Meeting with Carolina Power & Light Company to Discuss the H. B. Robinson Steam Electric Plant, Unit 2 Performance Improvement Plant and New Management ML1113703442011-05-11011 May 2011 05/11/2011 Meeting Slides Regarding Strategic Plan ML11102A0052011-04-12012 April 2011 Progress Energy - Slides for NFPA 805 Pre-LAR Application Meeting April 12, 2011 ML1108909072011-03-30030 March 2011 Slides of Meeting Regarding H.B. Robinson Annual Assessment Meeting ML1032006182010-11-16016 November 2010 Public Meeting Summary - Category One - Regulatory and Enforcement Conference Meeting (Robinson) ML1013904942010-05-12012 May 2010 Event Review for Robinson - Slides ML1011703342010-04-27027 April 2010 Summary of Category 1 Public Meeting with Carolina Power and Light Company Regarding NRC Reactor Oversight Process Annual Assessment H.B. Robinson Steam Electric Plant, Unit 2 ML0912706522009-05-0606 May 2009 Summary of Category 1 Public Meeting Discussed NRC Reactor Oversight Process Annual Assessment of H. B. Robinson, Unit 2 ML0830800052008-10-31031 October 2008 Meeting Slides, Progress Energy Public Meeting, NRC Region II Visit ML0813706302008-05-0707 May 2008 Slides from H. B. Robinson Meeting Re. Robinson Steam Electric Plant Annual Assessment Meeting Reactor Oversight Program - Cy 2007 ML0722100412007-07-26026 July 2007 Meeting Slides NRC Region Meeting Robinson Nuclear Plant. ML0716505352007-05-21021 May 2007 Enclosure - Slides for NRC CY2006 Annual Assessment Meeting ML0611402602006-04-0404 April 2006 Public Meeting Slides - Category One Management Meeting H. B. Robinson, Unit 2 ML0615301932006-03-27027 March 2006 NFPA 805 Pilot Observation Visit Trip Report - March 2006 - Handouts ML0523604402005-08-11011 August 2005 Attachment 4 - Progress Energy Slides 2023-04-12
[Table view] |
Text
Duke Energy/NRC Observation Meeting: Robinson LAR to Adopt TSTF-577, Rev. 1 September 14, 2022
Duke Energy Attendees Mike Classe (GM Nuclear Engineering, Robinson)
Ryan Treadway (Director, Nuclear Fleet Licensing)
Etienne Fonteneau (Manager, Steam Generator Programs Engineering)
Dan Mayes (Principal Engineer, Steam Generator Programs Engineering)
Jordan Vaughan (Lead Nuclear Engineer, Nuclear Fleet Licensing)
Chris Courtenay (Lead Nuclear Engineer, Nuclear Fleet Licensing)
Tim Thulien (Lead NDE Specialist (ECT Level III), Materials Integrity) 2 2
Technical Specifications Application for Unplugged Tube Existing Proposed Change in LAR under NRC review: Perform next 100% eddy current inspection of SG tubes during Refuel 35 (targeted to begin November 2026)
Issue/Problem Statement: Although recent inspection history demonstrates no wear growth for B SG tube R3C5, Technical Specification (TS) 5.5.9.c projected plugging limit criteria will be exceeded prior to Refuel 35.
Specifically, after applying TS 5.5.9.cs 2% per year reduction to the 47% plugging criteria, R3C5s 38% through-wall (TW) indication exceeds the calculated 72-month criteria of 37% TW. The projection from Dec. 2020 is represented as follows:
3 3
Proposed LAR Supplement Duke Energy proposes to remove the time-based aspect of the tube plugging criteria in TS 5.5.9.c, as follows:
4 4
Proposed LAR Supplement The proposed LAR supplement would align the Robinson provisions for SG tube plugging criteria in the SG Program TS to that of NUREG-1431 (Standard Technical Specifications for Westinghouse plants).
The time-based reduction component of the SG tube plugging criteria was added to the Robinson TS upon the issuance of Amendment No. 44 on November 17, 1979 (ADAMS Accession No. ML020500754) and was carried through to conversion to Improved TS (ITS).
At the time of adoption in 1979 until 1984, Robinson had 600 mill-annealed (MA) SG tubes. The replacement (existing) Robinson SGs have 600 thermally-treated (TT) tubes. The time-based element was very site-specific and should have been removed when the original SGs were replaced in 1984.
The 2% reduction in plugging limit per 12-month period was added to address wastage (thinning) indications in the original Robinson SGs with 600MA tubes. Due to existing chemistry treatment, wastage is not an issue in the existing 600TT tubes.
5 5
Proposed LAR Supplement The proposed LAR supplement also revises the SG tube plugging criteria in TS 5.5.9.c to be 40% of the nominal tube wall thickness instead of 47% of the nominal tube wall thickness.
This change is conservative relative to the existing TS 5.5.9.c.
The 47% value was determined for the 600MA SG tubes and was approved in the November 1979 SE. This value should not apply to the replacement (existing) 600TT SG tubes. A value of 40% is consistent with STS and other Westinghouse plants in the industry.
With the proposed supplement, Robinson would align with STS for Westinghouse plants and B SG tube R3C5 would not exceed the tube plugging criteria prior to the next inspection during Refuel 35 (November 2026).
6 6
7