Category:INSPECTION REPORT
MONTHYEARIR 05000285/19990101999-10-15015 October 1999 Insp Rept 50-285/99-10 on 990913-17.One NCV Noted.Major Areas Inspected:Mitigating Sys,Reactor Safety IR 05000285/19990091999-10-14014 October 1999 Insp Rept 50-285/99-09 on 990913-17.No Violations Noted. Major Areas Inspected:Effective Implementation of Protective Strategy When Required to Respond to Contingency Events ML20211P3441999-09-0707 September 1999 Insp Rept 50-298/99-08 on 990711-0821.No Violations Noted. Major Areas Inspected:Initiating Events,Mitigating Systems & Barrier Integrity IR 05000285/19990061999-09-0303 September 1999 Insp Rept 50-285/99-06 on 990809-12.No Violations Noted. Major Areas Inspected:Cornerstone Area of Reactor Safety, Emergency Preparedness.Insp Included Review of Licensee Program for Problem Identification & Resolution IR 05000285/19990071999-08-13013 August 1999 Insp Rept 50-285/99-07 on 990719-23.No Violations Noted. Major Areas Inspected:Accuracy & Operability of Radiation Monitoring Instrumentation Used for Protection of Occupational Workers IR 05000285/19990051999-07-19019 July 1999 Insp Rept 50-285/99-05 on 990601-0710.No Violations Noted. Major Areas Inspected:Broad Categories of Reactor Safety, Emergency Preparedness & Other Activities ML20195J2591999-06-11011 June 1999 Insp Rept 50-285/99-04 on 990425-0531.Noncited Violations Identified.Major Areas Inspected:Operations,Maint & Plant Support IR 05000285/19990031999-05-18018 May 1999 Insp Rept 50-285/99-03 on 990314-0424.Noncited Violations Noted.Major Areas Inspected:Operations,Maintenance, Engineering & Plant Support IR 05000285/19990021999-04-0202 April 1999 Insp Rept 50-285/99-02 on 990131-0313.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000285/19990011999-03-11011 March 1999 Insp Rept 50-285/99-01 on 990208-26.One Noncited Violation Was Identified.Major Areas Inspected:Evaluation of Cumulative Effect of Operator Workarounds at Plant Reactor Facility IR 05000285/19980191999-01-0808 January 1999 Insp Rept 50-285/98-19 on 981005-23 & 1211.Violations Noted. Major Areas Inspected:Corrective Action Program in Identifying Evaluation,Correcting & Preventing Problems That Affect Safe Operation of Facility IR 05000285/19980231999-01-0707 January 1999 Insp Rept 50-285/98-23 on 981108-1219.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000285/19980251998-12-30030 December 1998 Insp Rept 50-285/98-25 on 981130-1204.No Violations Noted. Major Areas Inspected:Licensee Emergency Preparedness Program IR 05000285/19980261998-12-17017 December 1998 Insp Rept 50-285/98-26 on 981131-1204.Deviations Noted. Major Areas Inspected:Plant Support Activities IR 05000285/19980131998-12-16016 December 1998 Insp Rept 50-285/98-13 on 981130-1204.No Violations Noted. Major Areas Inspected:Review Implementation of Liquid & Gaseous Radwaste Effluent Mgt Program IR 05000285/19980241998-11-20020 November 1998 Insp Rept 50-285/98-24 on 981102-06.Violations Noted.Major Areas Inspected:Plant Support IR 05000285/19980211998-11-13013 November 1998 Insp Rept 50-285/98-21 on 980927-1107.No Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support IR 05000285/19980171998-10-28028 October 1998 Insp Rept 50-285/98-17 on 980928-1002.No Violations Noted. Major Areas Inspected:Licensee Operator Requalification Program to Determine Whether Program Incorporated Appropriate Requirements IR 05000285/19980181998-10-0808 October 1998 Insp Rept 50-285/98-18 on 980831-0902.No Violations Noted. Major Areas Inspected:Changes to Fort Calhoun Station Radiological Emergency Action Levels IR 05000285/19980201998-10-0505 October 1998 Insp Rept 50-285/98-20 on 980816-0926.No Violations Noted. Major Areas Inspected:Operations,Maint & Engineering IR 05000285/19980221998-09-29029 September 1998 Insp Rept 50-285/98-22 on 980914-18.No Violations Noted. Major Areas Inspected:Routine,Announced Insp Reviewed Implementation of Radiological Environ & Meteorological Monitoring Programs IR 05000285/19980141998-08-28028 August 1998 Insp Rept 50-285/98-14 on 980705-0815.No Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support IR 05000285/19980121998-08-17017 August 1998 Insp Rept 50-285/98-12 on 980601-05 (on Site) & 980811 (in Ofc).One Noncited Violation Noted.Major Areas Inspected: Operations,Maint & Engineering.Root Cause Assessment, Performed as Result of 980527 Pump FW-10 Occurrence IR 05000285/19980151998-08-0606 August 1998 Insp Rept 50-285/98-15 on 980727-31.No Violations Noted. Major Areas Inspected:Testing & Maint,Protected Area Barrier & Detection Aids,Vital Area Barriers & Detection Aids, Security Event Logs & Security Training & Qualifications IR 05000285/19980161998-07-29029 July 1998 Insp Rept 50-285/98-16 on 980706-10.Violations Noted.Major Areas Inpected:Solid Radwaste Mgt & Radioactive Matls Transportations,Associated Training Activities & QA Oversight IR 05000285/19980101998-07-21021 July 1998 Insp Rept 50-285/98-10 on 970524-0704.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20236M7581998-07-0808 July 1998 Insp Rept 50-285/98-11 on 980521-0605.Violations Noted.Major Areas Inspected:Operations,Maint & Engineering IR 05000285/19980091998-06-25025 June 1998 Errata to Insp Rept 50-285/98-09.Correction Due to Errrors on Pages 5 & 13 ML20249A6181998-06-15015 June 1998 Insp Rept 50-285/98-09 on 980412-0523.Violations Noted:Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000285/19980071998-05-24024 May 1998 Insp Rept 50-285/98-07 on 980415-24.Violations Noted.Major Areas Inspected:Operations & Maint ML20217N0991998-04-30030 April 1998 Insp Rept 50-285/98-06 on 980406-10.Violations Noted.Major Areas Inspected:Plant Support IR 05000285/19980051998-04-22022 April 1998 Insp Rept 50-285/98-05 on 980301-0411.Violations Noted. Major Areas Inspected:Operation,Maint,Engineering & Plant Support ML20217Q9251998-04-0606 April 1998 Insp Rept 50-285/98-01 on 980120-23 & 26-0306.No Violations Noted.Major Areas Inspected:Plant Support,Including Fire Protection Program IR 05000285/19980031998-03-27027 March 1998 Insp Rept 50-285/98-03 on 980223-27 & 0311-18.No Violations Identified.Major Areas Inspected:Licensee Physical Security Program,Access Authorization,Alarm Stations,Communications, Access Control of Event Logs & Mgt Support IR 05000285/19980021998-03-25025 March 1998 Insp Rept 50-285/98-02 on 980209-13 W/In Ofc Insp Until 980302.Violations Noted.Major Areas Inspected:Operations & Engineering IR 05000285/19980041998-03-12012 March 1998 Insp Rept 50-285/98-04 on 980118-0228.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20203K5991998-02-27027 February 1998 Errata to Insp Rept 50-285/97-20 Issued on 980128.Noncited Violation Withdrawn.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support ML20199H8611998-01-28028 January 1998 Insp Rept 50-285/97-20 on 971207-980117.Violations Noted. Major Areas Inspected:Operation,Maint,Engineering & Plant Support ML20197H0171997-12-19019 December 1997 Insp Rept 50-285/97-19 on 971026-1206.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000285/19970141997-11-18018 November 1997 Informs That Insp Rept 50-285/97-14 Has Been Cancelled.No Insp Rept Will Be Issued for Rept Number IR 05000285/19970181997-11-10010 November 1997 Insp Rept 50-285/97-18 on 970914-1025.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000285/19970131997-10-0202 October 1997 Insp Rept 50-285/97-13 on 970630-0718.Violations Noted. Major Areas Inspected:Operations,Maint & Engineering IR 05000285/19970161997-09-29029 September 1997 Insp Rept 50-285/97-16 on 970803-0913.Violations Noted.Major Areas Inspected:Operations,Engineering,Maint & Plant Support IR 05000285/19970171997-09-19019 September 1997 Insp Rept 50-285/97-17 on 970825-29.Violations Being Considered for Escalated Ea.Major Areas Inspected: Operations & Engineering ML20141J8891997-08-15015 August 1997 Insp Rept 50-285/97-15 on 970615-0802.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support Re Fire Sprinkler Sys IR 05000285/19970051997-08-0101 August 1997 Insp Rept 50-285/97-05 on 970714-18.No Violations Noted. Major Areas Inspected:Plant Support IR 05000285/19970121997-07-25025 July 1997 Paritally Withheld Insp Rept 50-285/97-12 on 970623-0710 (Ref 10CFR73.21).Violation Noted.Major Areas Inspected: Licensee Implementation of Land Vehicle Control Measures & Security Surveillance IR 05000285/19970041997-07-0202 July 1997 Insp Rept 50-285/97-04 on 970602-06.Unresolved Items Identified.Major Areas Inspected:Licensee Performance & Capabilities in Control Room Simulator,Technical Support Ctr,Operations Support Ctr & Emergency Operations Facility ML20141E2441997-06-27027 June 1997 Insp Rept 50-285/97-06 on 970414-18 & 0428-0502.Violations Noted.Major Areas Inspected:Current Effectiveness of Licensee Plant & Design Engineering Organizations to Respond to Routine & Reactive Site Activities IR 05000285/19970101997-06-20020 June 1997 Insp Rept 50-285/97-10 on 970504-0614.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support 1999-09-07
[Table view] Category:NRC-GENERATED
MONTHYEARIR 05000285/19990101999-10-15015 October 1999 Insp Rept 50-285/99-10 on 990913-17.One NCV Noted.Major Areas Inspected:Mitigating Sys,Reactor Safety IR 05000285/19990091999-10-14014 October 1999 Insp Rept 50-285/99-09 on 990913-17.No Violations Noted. Major Areas Inspected:Effective Implementation of Protective Strategy When Required to Respond to Contingency Events ML20211P3441999-09-0707 September 1999 Insp Rept 50-298/99-08 on 990711-0821.No Violations Noted. Major Areas Inspected:Initiating Events,Mitigating Systems & Barrier Integrity IR 05000285/19990061999-09-0303 September 1999 Insp Rept 50-285/99-06 on 990809-12.No Violations Noted. Major Areas Inspected:Cornerstone Area of Reactor Safety, Emergency Preparedness.Insp Included Review of Licensee Program for Problem Identification & Resolution IR 05000285/19990071999-08-13013 August 1999 Insp Rept 50-285/99-07 on 990719-23.No Violations Noted. Major Areas Inspected:Accuracy & Operability of Radiation Monitoring Instrumentation Used for Protection of Occupational Workers IR 05000285/19990051999-07-19019 July 1999 Insp Rept 50-285/99-05 on 990601-0710.No Violations Noted. Major Areas Inspected:Broad Categories of Reactor Safety, Emergency Preparedness & Other Activities ML20195J2591999-06-11011 June 1999 Insp Rept 50-285/99-04 on 990425-0531.Noncited Violations Identified.Major Areas Inspected:Operations,Maint & Plant Support IR 05000285/19990031999-05-18018 May 1999 Insp Rept 50-285/99-03 on 990314-0424.Noncited Violations Noted.Major Areas Inspected:Operations,Maintenance, Engineering & Plant Support IR 05000285/19990021999-04-0202 April 1999 Insp Rept 50-285/99-02 on 990131-0313.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000285/19990011999-03-11011 March 1999 Insp Rept 50-285/99-01 on 990208-26.One Noncited Violation Was Identified.Major Areas Inspected:Evaluation of Cumulative Effect of Operator Workarounds at Plant Reactor Facility IR 05000285/19980191999-01-0808 January 1999 Insp Rept 50-285/98-19 on 981005-23 & 1211.Violations Noted. Major Areas Inspected:Corrective Action Program in Identifying Evaluation,Correcting & Preventing Problems That Affect Safe Operation of Facility IR 05000285/19980231999-01-0707 January 1999 Insp Rept 50-285/98-23 on 981108-1219.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000285/19980251998-12-30030 December 1998 Insp Rept 50-285/98-25 on 981130-1204.No Violations Noted. Major Areas Inspected:Licensee Emergency Preparedness Program IR 05000285/19980261998-12-17017 December 1998 Insp Rept 50-285/98-26 on 981131-1204.Deviations Noted. Major Areas Inspected:Plant Support Activities IR 05000285/19980131998-12-16016 December 1998 Insp Rept 50-285/98-13 on 981130-1204.No Violations Noted. Major Areas Inspected:Review Implementation of Liquid & Gaseous Radwaste Effluent Mgt Program IR 05000285/19980241998-11-20020 November 1998 Insp Rept 50-285/98-24 on 981102-06.Violations Noted.Major Areas Inspected:Plant Support IR 05000285/19980211998-11-13013 November 1998 Insp Rept 50-285/98-21 on 980927-1107.No Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support IR 05000285/19980171998-10-28028 October 1998 Insp Rept 50-285/98-17 on 980928-1002.No Violations Noted. Major Areas Inspected:Licensee Operator Requalification Program to Determine Whether Program Incorporated Appropriate Requirements IR 05000285/19980181998-10-0808 October 1998 Insp Rept 50-285/98-18 on 980831-0902.No Violations Noted. Major Areas Inspected:Changes to Fort Calhoun Station Radiological Emergency Action Levels IR 05000285/19980201998-10-0505 October 1998 Insp Rept 50-285/98-20 on 980816-0926.No Violations Noted. Major Areas Inspected:Operations,Maint & Engineering IR 05000285/19980221998-09-29029 September 1998 Insp Rept 50-285/98-22 on 980914-18.No Violations Noted. Major Areas Inspected:Routine,Announced Insp Reviewed Implementation of Radiological Environ & Meteorological Monitoring Programs IR 05000285/19980141998-08-28028 August 1998 Insp Rept 50-285/98-14 on 980705-0815.No Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support IR 05000285/19980121998-08-17017 August 1998 Insp Rept 50-285/98-12 on 980601-05 (on Site) & 980811 (in Ofc).One Noncited Violation Noted.Major Areas Inspected: Operations,Maint & Engineering.Root Cause Assessment, Performed as Result of 980527 Pump FW-10 Occurrence IR 05000285/19980151998-08-0606 August 1998 Insp Rept 50-285/98-15 on 980727-31.No Violations Noted. Major Areas Inspected:Testing & Maint,Protected Area Barrier & Detection Aids,Vital Area Barriers & Detection Aids, Security Event Logs & Security Training & Qualifications IR 05000285/19980161998-07-29029 July 1998 Insp Rept 50-285/98-16 on 980706-10.Violations Noted.Major Areas Inpected:Solid Radwaste Mgt & Radioactive Matls Transportations,Associated Training Activities & QA Oversight IR 05000285/19980101998-07-21021 July 1998 Insp Rept 50-285/98-10 on 970524-0704.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20236M7581998-07-0808 July 1998 Insp Rept 50-285/98-11 on 980521-0605.Violations Noted.Major Areas Inspected:Operations,Maint & Engineering IR 05000285/19980091998-06-25025 June 1998 Errata to Insp Rept 50-285/98-09.Correction Due to Errrors on Pages 5 & 13 ML20249A6181998-06-15015 June 1998 Insp Rept 50-285/98-09 on 980412-0523.Violations Noted:Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000285/19980071998-05-24024 May 1998 Insp Rept 50-285/98-07 on 980415-24.Violations Noted.Major Areas Inspected:Operations & Maint ML20217N0991998-04-30030 April 1998 Insp Rept 50-285/98-06 on 980406-10.Violations Noted.Major Areas Inspected:Plant Support IR 05000285/19980051998-04-22022 April 1998 Insp Rept 50-285/98-05 on 980301-0411.Violations Noted. Major Areas Inspected:Operation,Maint,Engineering & Plant Support ML20217Q9251998-04-0606 April 1998 Insp Rept 50-285/98-01 on 980120-23 & 26-0306.No Violations Noted.Major Areas Inspected:Plant Support,Including Fire Protection Program IR 05000285/19980031998-03-27027 March 1998 Insp Rept 50-285/98-03 on 980223-27 & 0311-18.No Violations Identified.Major Areas Inspected:Licensee Physical Security Program,Access Authorization,Alarm Stations,Communications, Access Control of Event Logs & Mgt Support IR 05000285/19980021998-03-25025 March 1998 Insp Rept 50-285/98-02 on 980209-13 W/In Ofc Insp Until 980302.Violations Noted.Major Areas Inspected:Operations & Engineering IR 05000285/19980041998-03-12012 March 1998 Insp Rept 50-285/98-04 on 980118-0228.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20203K5991998-02-27027 February 1998 Errata to Insp Rept 50-285/97-20 Issued on 980128.Noncited Violation Withdrawn.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support ML20199H8611998-01-28028 January 1998 Insp Rept 50-285/97-20 on 971207-980117.Violations Noted. Major Areas Inspected:Operation,Maint,Engineering & Plant Support ML20197H0171997-12-19019 December 1997 Insp Rept 50-285/97-19 on 971026-1206.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000285/19970141997-11-18018 November 1997 Informs That Insp Rept 50-285/97-14 Has Been Cancelled.No Insp Rept Will Be Issued for Rept Number IR 05000285/19970181997-11-10010 November 1997 Insp Rept 50-285/97-18 on 970914-1025.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000285/19970131997-10-0202 October 1997 Insp Rept 50-285/97-13 on 970630-0718.Violations Noted. Major Areas Inspected:Operations,Maint & Engineering IR 05000285/19970161997-09-29029 September 1997 Insp Rept 50-285/97-16 on 970803-0913.Violations Noted.Major Areas Inspected:Operations,Engineering,Maint & Plant Support IR 05000285/19970171997-09-19019 September 1997 Insp Rept 50-285/97-17 on 970825-29.Violations Being Considered for Escalated Ea.Major Areas Inspected: Operations & Engineering ML20141J8891997-08-15015 August 1997 Insp Rept 50-285/97-15 on 970615-0802.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support Re Fire Sprinkler Sys IR 05000285/19970051997-08-0101 August 1997 Insp Rept 50-285/97-05 on 970714-18.No Violations Noted. Major Areas Inspected:Plant Support IR 05000285/19970121997-07-25025 July 1997 Paritally Withheld Insp Rept 50-285/97-12 on 970623-0710 (Ref 10CFR73.21).Violation Noted.Major Areas Inspected: Licensee Implementation of Land Vehicle Control Measures & Security Surveillance IR 05000285/19970041997-07-0202 July 1997 Insp Rept 50-285/97-04 on 970602-06.Unresolved Items Identified.Major Areas Inspected:Licensee Performance & Capabilities in Control Room Simulator,Technical Support Ctr,Operations Support Ctr & Emergency Operations Facility ML20141E2441997-06-27027 June 1997 Insp Rept 50-285/97-06 on 970414-18 & 0428-0502.Violations Noted.Major Areas Inspected:Current Effectiveness of Licensee Plant & Design Engineering Organizations to Respond to Routine & Reactive Site Activities IR 05000285/19970101997-06-20020 June 1997 Insp Rept 50-285/97-10 on 970504-0614.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support 1999-09-07
[Table view] Category:TEXT-INSPECTION & AUDIT & I&E CIRCULARS
MONTHYEARPNO-IV-99-048, on 991026,Fort Calhoun Station Operators Reported Alert Because 4160 Volt Vital Buses 1A4 Were Deenergized for Approx 2 Minutes.Electrical Maint Personnel Have Inspected Electrical Equipment Inside & Outside Plant1999-10-26026 October 1999 PNO-IV-99-048:on 991026,Fort Calhoun Station Operators Reported Alert Because 4160 Volt Vital Buses 1A4 Were Deenergized for Approx 2 Minutes.Electrical Maint Personnel Have Inspected Electrical Equipment Inside & Outside Plant IR 05000285/19990101999-10-15015 October 1999 Insp Rept 50-285/99-10 on 990913-17.One NCV Noted.Major Areas Inspected:Mitigating Sys,Reactor Safety IR 05000285/19990091999-10-14014 October 1999 Insp Rept 50-285/99-09 on 990913-17.No Violations Noted. Major Areas Inspected:Effective Implementation of Protective Strategy When Required to Respond to Contingency Events ML20211P3441999-09-0707 September 1999 Insp Rept 50-298/99-08 on 990711-0821.No Violations Noted. Major Areas Inspected:Initiating Events,Mitigating Systems & Barrier Integrity IR 05000285/19990061999-09-0303 September 1999 Insp Rept 50-285/99-06 on 990809-12.No Violations Noted. Major Areas Inspected:Cornerstone Area of Reactor Safety, Emergency Preparedness.Insp Included Review of Licensee Program for Problem Identification & Resolution IR 05000285/19990071999-08-13013 August 1999 Insp Rept 50-285/99-07 on 990719-23.No Violations Noted. Major Areas Inspected:Accuracy & Operability of Radiation Monitoring Instrumentation Used for Protection of Occupational Workers IR 05000285/19990051999-07-19019 July 1999 Insp Rept 50-285/99-05 on 990601-0710.No Violations Noted. Major Areas Inspected:Broad Categories of Reactor Safety, Emergency Preparedness & Other Activities ML20195J2591999-06-11011 June 1999 Insp Rept 50-285/99-04 on 990425-0531.Noncited Violations Identified.Major Areas Inspected:Operations,Maint & Plant Support IR 05000285/19990031999-05-18018 May 1999 Insp Rept 50-285/99-03 on 990314-0424.Noncited Violations Noted.Major Areas Inspected:Operations,Maintenance, Engineering & Plant Support PNO-IV-99-025, on 990513,possible Stop Work in Response to Contract Dispute Occurred.Union Maint Personnel May Participate,But Operators & Security Personnel Will Not Participate.No Press Release Is Planned1999-05-14014 May 1999 PNO-IV-99-025:on 990513,possible Stop Work in Response to Contract Dispute Occurred.Union Maint Personnel May Participate,But Operators & Security Personnel Will Not Participate.No Press Release Is Planned IR 05000285/19990021999-04-0202 April 1999 Insp Rept 50-285/99-02 on 990131-0313.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000285/19990011999-03-11011 March 1999 Insp Rept 50-285/99-01 on 990208-26.One Noncited Violation Was Identified.Major Areas Inspected:Evaluation of Cumulative Effect of Operator Workarounds at Plant Reactor Facility IR 05000285/19980191999-01-0808 January 1999 Insp Rept 50-285/98-19 on 981005-23 & 1211.Violations Noted. Major Areas Inspected:Corrective Action Program in Identifying Evaluation,Correcting & Preventing Problems That Affect Safe Operation of Facility ML20206R1601999-01-0808 January 1999 Notice of Violation from Insp on 981005-23 & 1211.Violations noted:licensee-established Measures Failed to Assure Prompt Identification & Effective Corrective Action to Address Potential for Core Reactivity Change IR 05000285/19980231999-01-0707 January 1999 Insp Rept 50-285/98-23 on 981108-1219.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000285/19980251998-12-30030 December 1998 Insp Rept 50-285/98-25 on 981130-1204.No Violations Noted. Major Areas Inspected:Licensee Emergency Preparedness Program IR 05000285/19980261998-12-17017 December 1998 Insp Rept 50-285/98-26 on 981131-1204.Deviations Noted. Major Areas Inspected:Plant Support Activities ML20198J2051998-12-17017 December 1998 Notice of Deviation from Insp on 981131-1204.Deviation Noted:Licensee Quality Assurance Dept Conducted Biennial Audits of All Transfer,Packaging & Transport Activities Involving Radioactive Matl IR 05000285/19980131998-12-16016 December 1998 Insp Rept 50-285/98-13 on 981130-1204.No Violations Noted. Major Areas Inspected:Review Implementation of Liquid & Gaseous Radwaste Effluent Mgt Program IR 05000285/19980241998-11-20020 November 1998 Insp Rept 50-285/98-24 on 981102-06.Violations Noted.Major Areas Inspected:Plant Support ML20195H8021998-11-20020 November 1998 Notice of Violation from Insp on 981102-06.Violation Noted: from 4:45 to 11:45 Am on 980423,room 13 on Elevation 989 Ft of Auxiliary Building Not Posted as Airborne Radioactivity Area When Sample Results Showed Excess Radioactivity IR 05000285/19980211998-11-13013 November 1998 Insp Rept 50-285/98-21 on 980927-1107.No Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support IR 05000285/19980171998-10-28028 October 1998 Insp Rept 50-285/98-17 on 980928-1002.No Violations Noted. Major Areas Inspected:Licensee Operator Requalification Program to Determine Whether Program Incorporated Appropriate Requirements IR 05000285/19980181998-10-0808 October 1998 Insp Rept 50-285/98-18 on 980831-0902.No Violations Noted. Major Areas Inspected:Changes to Fort Calhoun Station Radiological Emergency Action Levels IR 05000285/19980201998-10-0505 October 1998 Insp Rept 50-285/98-20 on 980816-0926.No Violations Noted. Major Areas Inspected:Operations,Maint & Engineering IR 05000285/19980221998-09-29029 September 1998 Insp Rept 50-285/98-22 on 980914-18.No Violations Noted. Major Areas Inspected:Routine,Announced Insp Reviewed Implementation of Radiological Environ & Meteorological Monitoring Programs IR 05000285/19980141998-08-28028 August 1998 Insp Rept 50-285/98-14 on 980705-0815.No Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support IR 05000285/19980121998-08-17017 August 1998 Insp Rept 50-285/98-12 on 980601-05 (on Site) & 980811 (in Ofc).One Noncited Violation Noted.Major Areas Inspected: Operations,Maint & Engineering.Root Cause Assessment, Performed as Result of 980527 Pump FW-10 Occurrence IR 05000285/19980151998-08-0606 August 1998 Insp Rept 50-285/98-15 on 980727-31.No Violations Noted. Major Areas Inspected:Testing & Maint,Protected Area Barrier & Detection Aids,Vital Area Barriers & Detection Aids, Security Event Logs & Security Training & Qualifications IR 05000285/19980161998-07-29029 July 1998 Insp Rept 50-285/98-16 on 980706-10.Violations Noted.Major Areas Inpected:Solid Radwaste Mgt & Radioactive Matls Transportations,Associated Training Activities & QA Oversight ML20236W2931998-07-29029 July 1998 Notice of Violation from Insp on 980606-10.Violation Noted: Licensee Did Not Take Dry Active Samples Annually.Dry Active Waste Stream Samples Were Collected in June 1995 & Aug 1997 IR 05000285/19980101998-07-21021 July 1998 Insp Rept 50-285/98-10 on 970524-0704.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20236M7531998-07-0808 July 1998 Notice of Violation from Insp on 980521-0605.Violation Noted:On 980520,licensee Personnel Did Not Write Maint Work Document to Document Deficiency W/Valve FP-230 Following Manipulation of Valve ML20236M7581998-07-0808 July 1998 Insp Rept 50-285/98-11 on 980521-0605.Violations Noted.Major Areas Inspected:Operations,Maint & Engineering IR 05000285/19980091998-06-25025 June 1998 Errata to Insp Rept 50-285/98-09.Correction Due to Errrors on Pages 5 & 13 ML20249A6181998-06-15015 June 1998 Insp Rept 50-285/98-09 on 980412-0523.Violations Noted:Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20249A6171998-06-15015 June 1998 Notice of Violation from Insp on 980412-0523.Violation Noted:On 980402,licensee Did Not Have Adequate Procedure for Performing Activity That Affected Quality PNO-IV-98-021A, on 980526,update to Loss of Offsite Power Made.Components Have Been Replaced & Sys Functioning Properly.Correction Should Be Made to Info in Original Pn. Nonvital Buses 1A1 & 1A2 Continuously Energized1998-05-26026 May 1998 PNO-IV-98-021A:on 980526,update to Loss of Offsite Power Made.Components Have Been Replaced & Sys Functioning Properly.Correction Should Be Made to Info in Original Pn. Nonvital Buses 1A1 & 1A2 Continuously Energized ML20249C1431998-05-24024 May 1998 Notice of Violation from Insp on 980415-24.Violation Noted: Inspectors Identified That Licensee Had Not Submitted in 1984 & 1994 Relief Requests for Code Class Welds That Did Not Receive Full Exam Coverage During 10-yr ISI Intervals IR 05000285/19980071998-05-24024 May 1998 Insp Rept 50-285/98-07 on 980415-24.Violations Noted.Major Areas Inspected:Operations & Maint PNO-IV-98-021, on 980520,loss of Offsite Power Occurred as Result of Fault on Transformer T1A-3,161 Kv to 4 Kv Transformer Which Supplies Power to One of Two Vital Electrical Buses.Special Followup Initiated on 9805211998-05-21021 May 1998 PNO-IV-98-021:on 980520,loss of Offsite Power Occurred as Result of Fault on Transformer T1A-3,161 Kv to 4 Kv Transformer Which Supplies Power to One of Two Vital Electrical Buses.Special Followup Initiated on 980521 ML20217N0991998-04-30030 April 1998 Insp Rept 50-285/98-06 on 980406-10.Violations Noted.Major Areas Inspected:Plant Support ML20217N0931998-04-30030 April 1998 Notice of Violation from Insp on 980406-10.Violation Noted: on 980407,individual Working in Accordance W/Radiation Work Permit 98-0011 Entered Restricted High Radiation Area in Steam Generator Bay B W/O Radiation Protection Coverage IR 05000285/19980051998-04-22022 April 1998 Insp Rept 50-285/98-05 on 980301-0411.Violations Noted. Major Areas Inspected:Operation,Maint,Engineering & Plant Support ML20217E0061998-04-22022 April 1998 Notice of Violation from Insp on 980301-0411.Violation Noted:Inspectors Identified That Licensee Did Not Have Procedure for Performing an Activity That Affected Quality ML20217Q9251998-04-0606 April 1998 Insp Rept 50-285/98-01 on 980120-23 & 26-0306.No Violations Noted.Major Areas Inspected:Plant Support,Including Fire Protection Program IR 05000285/19980031998-03-27027 March 1998 Insp Rept 50-285/98-03 on 980223-27 & 0311-18.No Violations Identified.Major Areas Inspected:Licensee Physical Security Program,Access Authorization,Alarm Stations,Communications, Access Control of Event Logs & Mgt Support ML20217D4471998-03-25025 March 1998 Notice of Violation from Insp on 980209-13 W/In Ofc Insp Until 980302.Violation Noted:Since Aug 1994 QA Lead Auditor Had Not Satisfied or Completed QA Qualification Manual Requirements Prior to Conducting Lead Auditor Functions IR 05000285/19980021998-03-25025 March 1998 Insp Rept 50-285/98-02 on 980209-13 W/In Ofc Insp Until 980302.Violations Noted.Major Areas Inspected:Operations & Engineering IR 05000285/19980041998-03-12012 March 1998 Insp Rept 50-285/98-04 on 980118-0228.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support 1999-09-07
[Table view] |
Text
{{#Wiki_filter:.. ___ - ---__ ___ _ .
.
.
-
.
APPENDIX U.S. NUCLEAR REGULATORY COMMISSION
REGION IV
NRC Inspection Report: 50-285/93-19 Operating License: DPR-40 Licensee: Omaha Public Power District Fort Calhoun Station FC-2-4 Ad '
P.O. Box 399, Hwy. 75 - North of Fort Calhoun Fort Calhoun, Nebraska 68023-0399 ;
Facility Name: Fort Calhoun Station Ir.spection At: Blair, Nebraska Inspection Conducted: August 23-27, 1993 !
Inspector: L. T. Ricketson, P.E., Senior Radiation Specialist Facilities Inspection Programs Section i
l Approved: {{Lni Y
~
L l LOC /
Ef.' Hurray, Ch'ieT,' F5ciMi_ es Inspection Date bY
'
Programs Section U l Inspection Summary l l
Areas inspected: Routine, announced inspection of the radiation protection program, including audits and appraisals, training and qualifications, external exposure controls, internal exposure controls, controls of radioactive material and contamination, and corrective actions for previously identified violation Results: 1
!
* A comprehensive quality assurance audit was performed using a technical expert from another power reactor facility (Section 2).
,
* The licensee implemented the new 10 CFR Part 20 on July 1, 1993 (Section 3). ,
* The radiation protection department had low turnover (Section 5).
- Training groups inspected were sufficiently staffed with qualified instructors (Section5).
- A very high percentage of the radiation protection technicians were registered by the National Registry of Radiation Protection Technologists (Section 5).
n 9309160193 930914 N PDR ADOCK 05000285 g G PDR h
. _ _ ._ _ _ _
- .. .
-
?
.
~
.
-2-
* A good screening examination was used in selecting contract radiation protection technicians (Section 5).
- An " advanced" radiation worker training course was presented to maintenance workers (Section 5). ,
* A good training program had been established for supervisors and professionals within the radiation protection group (Section 5).
- A properly accredited dosimetry program which included state-of-the-art equipment was maintained (Section 6). '
* Areas within the radiological controlled area were properly posted and controlled (Section 6).
- A low person-rem exposure was maintained (Section 6).
- A good internal exposure control program was implemented (Section 7).
- Housekeeping within the radiological controlled area was adequate (Section 8).
- An excellent contamination control program was in place (Section 8).
Summary of Insoectioc Findinas:
,
* Violations 285/9232-01, 285/9232-02, 285/9232-03, 285/9232-04, 285/9232-05, 285/9232-06, and 285/9232-07 were closed (Section 10).
'
Attachment
* Attachment - Persons Contacted and Exit Meeting '
;
)
)
,
- _ .
.
.
.
.
l-3-DETAILS 1 PLANT STATUS During this inspection, the plant was operating at 100 percent powe AUDITS AND APPRAISALS (83750)
The inspector reviewed this portion of the licensea's program to determine compliance with Technical Specification 5.5.2.8 and Chapter 12 of the Updated Safety Analysis Repor The inspector reviewed Quality Assurance Audit Report 58, " Radiation Protection and ALARA," which was performed March 15-29, 1993. The four-member team included a member with previous radiation protection experience and a ,
technical expert from another power reactor facility. The audit identified five items which required corrective action reports and made five recommendations. Responses to the findings from the radiation control program were made promptl The licensee also performed an assessment of the radiation protection program effectiveness January 4-7, 1993. The assessment team included a member with expertise in radiation protection. The radiation protection program developed a number of initiatives for program improvement as a result of the assessmen The inspector reviewed radiological occurrence reports and incident reports related to the radiation protection progra Licensee personnel were knowledgeable of the two systems and properly documented and tracked occurrences and problems. The inspector determined that good reviews were made of the items, and proper corrective actions were implemente CHANGES (83750)
:
The inspector reviewed this portion of the licensee's program to determine agreement with commitments in Chapter 12 of the Updated Safety Analysis Repor There were no substantive changes in the organizational structure. The licensee filled the positions of supervisors for Radiological Health and Engineering and Radioactive Waste Operation Changes were made to the radiological controlled area access control entry / exit point to enhance the traffic flow pattern The licensee implemented the new 10 CFR Part 20 changes on July 1, 199 Procedures were revised to include the changes. The inspector verified that the new procedures provided adequate guidance for the implementation of new Part 2 l
__ , _ _ _ _ _ . _ _ - _ _ _ _ . . _ . _ . _ _ _ . _ . _ . _ _
-
. _ _ . _ _ _ - - _ - . _ _ _ _
.
.
.,
,
i-4-4 PLANNING AND PREPARATION (83750)
The inspector reviewed this portion of the licensee's program to determine compliance with Technical Specification 5.8 and agreement with commitments in Chapter 12 of the Updated Safety Analysis Repor The licensee was scheduled to start a 56-day refueling outage on September 25, i 199 l The radiation protection program planned to supplement its permanent staff with approximately 86 additional people, including 32 contract radiation protection technician ;
The licensee planned to conduct mock-up training for maintenance activities involving steam generator nozzle dam installation and letdown filter replacemen Approximately 120 to 160 radiation work permits will be required for outage work. Only a few of these had been prepared at the time of the inspectio When the inspector expressed concern with the radiation work permit preparation progress, radiation protection representatives stated that they had been involved with outage work planning and had determined that there were no new work activities to be performed during the 1993 refueling outag Therefore, since sufficient job histories were on file and ready for use in preparing the radiation work permits, radiation protection personnel would .)
have sufficient time to prepare the permits by September 2 The licensee was planning for extensive use of engineering controls, such as auxiliary ventilation systems, during the outage. The inspector noted that a i good supply of ventilation units was availabl RAINING AND QUALIFICATIONS OF PERSONNEL (83723) l The inspector reviewed this portion of the licensee's program to determine compliance with 10 CFR 19.12 and Technical Specification 5.8 and agreement i with commitments in Chapter 12 of the Updated Safety Analysis Repor The inspector determined that the radiation protection organization has been very stable. Only one technician had terminated employment within the last 4 year. No senior radiation protection technicians have joined the radiation ;
protection staff since the last inspection, other than those who nave ,
participated in the licensee's initial radiation protection techaician I training progra The inspector interviewed representatives from the training department and determined that the radiation protection technician training group' continued to have three instructors. A new instructor with health physics experience was recently hired. Appropriate facilities for classes were availabl A suitable reference library and information distribution system were also available to the instructor l
. - _ ,
.
-
.
,
-5-There was no official training coordinator within the radiation protection department; however, both radiation protection and training representatives stated that communications between the two departments were excellen Official meetings were held twice a year to discuss training need Informal discussions were commo The licensee continued to offer an initial training course for junior level technicians and cuntinuing training for senior level technicians. The licensee offered four to seven cycles of continuing training per yea The initial training course included training in reactor systems and radiological hazards associated with those systems. Continuing training included discussions on industry events and lessons learne The number of technicians registered by the National Registry of Radiation Protection Technologists was 80 to 90 percent of those eligibl The licensee had implemented a good examination program for screening potential contract radiation protection technicians. The test required a passing grade of 80 percent. Those successfully passing the examination were considered eligible for employment for a period of 2 years. Technicians registered by the National Registry of Radiation Protection Technologist were exempted from taking the tes Contractor cadiation protection technicians are given 3 days of training which includes leu ons learned, pertinent standing orders, and radiation protection procedure the job training and performance testing follow. Performance evaluation checklists are used to document the contract technicians'
successful demonstration of their knowledge of licensee procedure A course entitled, " Advanced Radiation Worker Training," was being presented by the radiation protection technician instructors to increase worker awareness of good radiation protection techniques. Mock-ups of piping and valves were used & simulate hardware in the radiological controlled area during the practical portion of the course. A simulated contaminant will be used shortly for added realism. Maintenance personnel were being presented the training first. Other groups will receive the training after maintenance perronne The licensee maintained a continuing, technical training program for radiation protection supervisors and professional staff. The training consisted of vendor training and professional meeting attendance by all professional staff member The licensee had three instructors for general employee, radiation worker, and respiratory protection training. During the past year, between 1200 and 1400 people were instructed. Training representatives predicted an increase to 1500 to 1700 this year because of the outage. The inspector discussed with training representatives topics presented during the courses and reviewed student handouts and determined that the training was comprehensiv Representatives from this area of training also stated that they had appropriate facilities and good resource . . - .
'
.
.
.
i-6-Evaluation forms were available to individuals who wished to provide comments on the course content and instructor presentatio i 6 EXTERNAL EXPOSURE CONTROLS (83750)
The inspector reviewed this portion of the licensee's program to determine compliance with Technical Specification 5.8 and agreement with commitments in Chapter 12 of the Updated Safety Analysis Repor There were no major changes in the dosimetry program since the previous inspection of this area of the licensee's program. The licensee continued to use state-of-the-art equipment and be accredited by the National Voluntary Laboratory Accreditation Program in all eight dosimetry test categories (as defined by American National Standards Institute.N13.11).
As part of the dosimetry quality control program, on a quarterly basis, the licensee processed thermoluminescent dosimeters irradiated by the University of Michigan and compared results. On a monthly basis, the licensee processed blind spiked thermoluminescent dosimeters from a vendor. The inspector reviewed selected results from the ongoing quality assurance program and determined that the results were within industry standards for acceptabilit '
As an initiative to reduce radiation exposure, the licensee plans to replace the existing multi-pieco style of letdown filters with filters utilizing a '
one-piece element. The new filters also have a fluid flow pattern which travels from the inside out, reducing the amount of contaminated material deposited on the outside surface of the filter. The new design reduces handling time and possibility for direct contact with radioactive material The new filters will be installed during the 1993 refueling outag On tours of the radiological controlled area, the inspector observed that ,
posting of areas was as required. Extremely high radiation areas (greater than 1000 millirems per hour) were locked as required. The inspector made confirmatory measurements in different areas of the radiological controlled j area and did not identify areas needing additional posting or contro The licensee had not used the planned special exposure provision of the new 10 CFR Part 20 (20.1206). Total exposure accrued through the end of August was approximately 12.5 person rem INTERNAL EXPOSURE CONTROL (83725,83750) {
The inspector reviewed this portion of the licensee's program to determine ,
'
compliance with Technical Specification 5.8 and agreement with commitments in -
Chapter 12 of the Updated Safety Analysis Repor In support of the new Part 20 implementation, the licensee issued RP-205, ,
"DAC-HOUR TRACKING." The inspector. determined that the licensee had a working !
system for the recording and tracking of derived air concentration hours for !
workers, although since its implementation there has been no need for tracking because of the lack of internal exposures. Whole-body counting confirmed that l
_ _ - - - _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ - _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _
.
.
.
-7-
! the licensee's investigative limits were not exceeded during the first eight L months of 199 l The inspector noted that Radiation Protection Procedure RP-201, " Radiation Work Permits," included instructions and a logic chart to aid radiation protection personnel in determining the need for engineering controls or respiratory protection equipmen The inspector reviewed selected aspects of the whole-body counting program and determined that a good program was maintained. The inspector reviewed the l qualifications of people in the dosimetry program and determined that all were qualified to perform whole-body counting and calibration CONTROL OF RADI0 ACTIVE MATERIALS AND CONTAMINATION, SURVEYS, AND MONITORING (83726,83750)
'
The inspector reviewed this portion of the licensee's program to determine compliance with Technical Specification 5.8 and agreement with commitments in l Chapter 12 of the Updated Safety Analysis Report.
l
! The inspector reviewed examples of the licensee's surveys and determined that l they were complete and easy to interpre The inspector confirmed that a suitable supply of calibrated, response-checked, radiation survey instruments were available for immediate use. Instruments in the field, such as friskers, personnel contamination monitors, and portal monitors were response checked dail The licensee began decontaminating the auxiliary building overhead areas in May 1993 and intends to have the project completed before the start of the refueling outage. The licensee was taking this action to reduce the number of personnel contaminations occurring when work is done in these areas during the outag Housekeeping within the radiological controlled area was good in some areas; in other areas it was not. The inspector noted the presence of sand in Room 59, presumably brought into the area on scaffolding sections. At the end of some work days, the inspector noted that tools were scattered in several areas. Licensee representatives acknowledged that this had been a problem and stated that they were attempting to correct the situation. The inspector stated at the exit meeting that this was not a criticism of the radiation protection department, but a general observation of conditions within the radiological controlled rre The inspector noted a race shield hanging on the wall within in the tool decontamination area and another on the floor in the east safety injection pump room (Room 22). Both areas were controlled as contaminated. The inspector pointed out that the inner surfaces of the face shields could become contaminated and spread the contamination to personnel if stored in this j manner and then reused. The 'icensee took immediate action to remove the 4 faceshields and search for others. Radiation protection representatives stated that they would review the situation to determine if additiorw.1 worker
___ _____-___- _ -__________ -__ - ________--_______ - - - _ _ _ _ _ _ _ -
-
.
.
-
.
-8-guidance was needed. The licensee also used disposable face shields for some work activitie Despite the last two observations, the licensee had few personnel contamination events. Through August 31, 1993, the licensee recorded 10 skin coatamination CONCLUSIONS A comprehensive quality assurance audit was performed using a technical expert from another power reactor facilit The radiation protection department had a stable work force with very little staffing turnove Training groups inspected were sufficiently staffed with qualified instructors. A very high percentage of the radiation protection technicians were registered by the National Registry of Radiation Protection Technologists, indicating licensee attention to promoting the professional develooment of the technicians. The licensee used a good screening examination as a tool in selecting contract radiation protaction technician Presentation of an " advanced" radiation worker training course to maintenance workers indicated an increased desire to prevent contamination event A good training course for supervisors and professionals within the radiation <
protection group was maintained.
,
The licensee had a properly accredited dosimetry program with state-of-the-art equipment. Areas within the radiological controlled area were properly posted
and controlled. A low person-rem exposure was maintained through routine operation A good internal exposure control program was implemente l
'
Housekeeping within the radiological controlled area was adequate and excellent results were obtained by the licensee's program for control of j contaminatio j 10 FOLLOWUP DN CORRECTIVE ACTIONS FOR VIOLATIONS (92702) !
1 (Closed) Violation 285/9232-01: Failure to Revise a Radiation Work Permit On April 16, 1992, radiological conditions changed during the change-out of the. letdown filters, and the radiation protection technician did not stop the job to revise the radiation work permit. Consequently, the letdown filters became drier than usual, causing an airborne radioactivity proble The inspector determined that, to prevent recurrence of this violation, the I licensee took the following actions:
I
!
,. - _ . -. ._
.
.
-
.
-9-Procedure RP-201, " Radiation Work Permits," was revised to establish written guidance for work activities performed in high and very radiation area * Training given to new radiation protection technicians was evaluated to determine if additional training in such matters was warranted. The licensee determined that no changes were warrante * An assessment was performed to determine the effectiveness of the radiation protection program. A number of recommendations for improvement were submitted to licensee management as a result of the assessment. Mest had been implemented by the time of the inspectio * Procedure RP-218, " Primary Filter Change," was nearly ready for issu The inspector received a draft copy of the procedure which was set to go before the Plant Review Committee. The procedure addressed radiation protection personnel's responsibilities during such operations and addressed work delays such as that which contributed to the violatio * A design change of the letdown filters was approved (see Section 6).
10.2 (Closed) Violation 285/9232-02: Failure to Survey Lutdown Filters for Beta Radiation This violation occurred during the incident which resulted in the identification of Violation 285/9232-01. The corrective actions to prevent recurrence of Violation 285/9232-01 address this ite .3 (Closed) Violation 285/9232-03: Failure to Survey Letdown Filters for Alpha Activity This violation occurred during the incident which resulted in the -
identification of Violation 285/9232-01. The corrective actions to prevent '
.
recurrence of Violation 285/9232-01 address this ite .4 (Closed) Violation 285/9232-04: Failure to Perform Adeauate Reviews of Radiation Survey Results This violation occurred during the incident which resulted in the identification of Violation 285/9232-01. The corrective actions to prevent .
'
recurrence of Violation 285/9232-01 address this ite .5 (Closed) Violation 285/9232-05: Failure to Perform Air Monitorina >
This violation occurred during the incident which resulted in the identification of Violation 285/9232-01. The corrective actions to prevent recurrence of Violation 285/9232-01 address this ite .
t
_
*
.
'
-
.
-10-10.6 1 Closed) Violation 285/9232-06: Failure to Post an Airborne Radioactivity Area This. violation occurred during the incident which resulted in the identification of Violation 285/9232-01. The corrective actions to prevent recurrence of Violation 285/9232-01 address this ite .7 (Closed) Violation 285/9232-07: Failure to Use Enaineerina Controls to the Extent Practicable This violation occurred during the incident which resulted in the identification of Violation 285/9232-01. The corrective actions to prevent recurrence of Violation 285/9232-01 address this ite ,
.
-
.
.'
. .
-
.
. ATTACHMENT
,
1 PERSONS CONTACTED-1.1 Licensee Personnel
*R. L. Andrews, Division Manager, Nuclear Services
*G. R. Cavanaugh, Licensing Engineer .
*J. W. Chase, Plant Manager A. G. Christensen, Radiation Protection Operations
*G. M. Cook, Supervisor, Station Licensing
*S. W. Gerbers, Supervisor, Radiological Health and Engineering R. G. Haug, Supervisor, Chemical and Radiation Protection Training
*W. C. Jones, Senior Vice President !
*D. L. Lovett, Supervisor, Radiation President
*W. W. Orr, Manager, Quality Assurance / Quality Control L. D. Sills, Quality Assurance Specialist K. E. Steele, Special Projects Coordinator ,
J. M. Uhland, Supervisor, Radiation Orientation 1.2 NRC Personnel
*R. V. Azua, Resident Inspector
*R. P. Mullikin, Senior Resident Inspector
* Denotes personnel that attended the exit meeting. In addition to the personnel listed, the inspector contacted other personnel during this inspection perio '
2 EXIT MEETING An exit meeting was conducted on August 27, 1993. During this meeting, the inspector reviewed the scope and findings of the report. The licensee did not identify as proprietary, any information provided to, or reviewed by the inspecto ;
i
,
I
}}