Text
..
.-.
.
.
.
..
. _ _ _
-
_.
UNITED STATES
[p0 Cf o IS NUCLEAR REGULATORY COMMISSION ug
,
.,
REGION IV
~8 611 RYAN PLAZA DRIVE, SUITE 400 o$
[
AR LINGTON, TEXAS 76011-8064 g - 51994
Docket:
50-285
.
License: DPR-40 l
.
Omaha Public Power District ATTN:
T. L. Patterson, Division Manager Nuclear Operations
,
Fort Calhoun Station FC-2-4 Adm.
P.O. Box 399, Hwy. 75 - North of Fort Calhoun
.
Fort Calhoun, Nebraska 68023-0399 SUBJECT:
REVISION OF COMMITTED CORRECTIVE ACTION IN A REPLY TO A NOTICE OF
,
VIOLATION t
We have reviewed your letter of June 27, 1994, concerning your new schedule for completion of corrective actions for violations identified in NRC
!
Reports 50-285/93-23 and 50-285/94-07. We have no further questions at this time and will review the results of your actions during a future inspection.
Sincerely, j
amuel J. Collins, Director
'
Division of Radiation Safety and Safeguards cc:
LeBoeuf, Lamb, Leiby & MacRae ATTN:
Mr. Michael F. McBride 1875 Connecticut Avenue, NW i
'
Washington, D.C.
20009-5728 Washington County Board of Supervisors ATTN: Jack Jensen, Chairman Blair, Nebraska 68008 Combustion Engineering, Inc.
ATTN: Charles B. Brinkman, Manager Washington Nuclear Operations 12300 Twinbrook Parkway, Suite 330 Rockville, Maryland 20852 9408100014 940005 PDR ADOCK 05000285 G
{
'
l (' a~ d. nula (gi c
.
-
.- _=
.
.
.-
. - _.
'
.
Omaha Public Power District-2-Nebraska Department of Health ATTN: Harold Borchert, Director Division of Radiological Health 301 Centennial Mall, South P.O. Box 95007 Lincoln, Nebraska 68509-5007 Department of Environmental Quality ATTN: Thomas Lamberson, Deputy Director P.O. Box 98922 Lincoln, Nebraska 68509-8922
,
Fort Calhoun Station
ATTN: James W. Chase, Manager P.O. Box 399 Fort Calhoun, Nebraska 68023
,
I i
l i
l
,
l
.Y
l Omaha Public Power District-3-l l
rbec to DMB (IE06)
bec w/ copy of licensee's letter dated June 27, 1994:
l L. J. Callan Fort Calhoun Resident Inspector DRSS-FIPB File MIS System Branch Chief (DRP/A)
Project Engineer (DRP/A)
RIV File Branch Chief (DRP/TSS)
Senior Resident Inspector - Cooper Leah Tremper, OC/LFDCB, MS: MNBB 4S03 L. T. Ricketson, DRSS/FIPB
,
)
t l
l l
l
/
l RIV:FIPBk C:FIPBb
.DD:DRSS ff /
D:DRSS
///
kAScara[o SJCollin('
,LTRicketson:nh BMurrayd I
'
(
Y,V94 k /x /94
[/ff/94
[/ <//94
_
_ _ _ _ _ - _ - _ _ _
_
_ _ _ _ _ _ _ _ _ _ _ _ _ _.
.
.
.
.
Omaha Public Power District-3-bcc to DMB (IE06)
bec w/ copy of licensee's letter dated June 27, 1994:
L. J. Callan Fort Calhoun Resident inspector DRSS-FIPB File MIS System Branch Chief (DRP/A)
Project Engineer (DRP/A)
RIV File Branch Chief (DRP/TSS)
Senior Resident inspector - Cooper Leah Tremper, OC/LFDCB, MS: MNBB 4503 L. T. Ricketson, DRSS/FIPB D
/
RIV:FIPBh C:FIPBb
.DD:DRSS M D:DRSS M
,LTRicketson:nh BMurray d
{bScarano SJCollin['
h. \\J94 h/3/94
[/t//94
[/ <//94 j
,
,-
.
,
l
_ _ - _ _ -
'
.
.
.
-
.
t
=,- pac = ggmeng g
,g _ggg,.;.;: _,9: 9
_.7g.;7)p.,
. i a. q. a a M & & M.u.b.~L Ga b %.Gi!i 2 R,= 26.a w u d W -
_
. _
_.
Omaha Public Power District 444 South 16th Street Mall Omaha Nebraska 68102-2247 402/636-2000 June 27, 1994 L I C - 94 - 01" JJ-
'5 U. S. Nu aar Regulatory Commission ATTN: Ducument Control Desk Mail Station PI-137 Washirgten, DC 20555-0001
,
References: 1. Docket No. 50-285 2. Letter from GPPD (W. G. Gates) to NRC (Document Control Desk)
dated November 29, 1993 (LIC-93-0283)
3. Letter from OPPD (W. G. Gates) to NRC (Document Control Desk)
dated May 13, 1994 (LIC-94-0098)
Gentlemen:
SUBJECT:
Revision of Committed Corrective Action in a Reply to a Notice of Violation Omaha Public Power District (OPPD) is submitting this letter in order to revise one of the corrective actions noted in Reference 2 and clarify its relationship to a corrective action noted in Reference 3.
Reference 2 transmitted the OPPD response to the Notice of Violation contained in NRC Inspection Report No. 50-285/93-23.
The violation concerned personnel entering the Radiological Controlled Area (RCA) without proper dosimetry.
Corrective Action No. 7 in Section C stated:
The RP Department upgrading of access into the RCA has been ongoing.
As a result of this violation, completion of automated access into the RCA will be expedited. Automated access will ensure that individuals entering the RCA have the proper dosimetry.
This will be completed by June 30, 1994.
NRC Inspection Report 50-285/94-07 contained a Notice of Violation concerning a person who entered the RCA without logging into the access control system and without his alarming dosimeter turned on.
In the Reference 3 response to this violation, OPPD stated in Corrective Action No. 2 of Section C:
The RP access control area is in the process of being renovated. ECil 93-609 has been approved to change the access control area traffic flow patterns and impicment a streamlined access control system.
This will assist in ensuring that personnel entering the RCA have proper dosimetry.
This ECll will be completed by October 30, 1994.
7}) ~sLg_,
cg-m
_
gy U dh I
.
,
.
,
..
i U. S. fluclear Regulatory Commission LIC-94-0136 Page 2 During the interval between the Reference 2 and Reference 3 responses, OPPD determined that the original scope and details of the " automated access" upgrade noted in Reference 2 would not be the best way to facilitate compliance with dosimetry requirements for personnel entering the RCA.
As a result, OPPD developed a revised design and a new schedule for upgrading the RCA access results primarily from additional required software changes. Major features of t30,1994)he process upgrade process. The schedule change (completion by October include (1) increasing the responsibility and accountability of personnel entering the RCA, e.g., self-lcgging by individuals into the computer system, and (2) chancing the primary access route to improve communications between these personnef and the Radiation Protection personnel.
Although it was not clearly explained, it was OPPD's intent that Corrective Action lio. 2 of Reference 3 represented a clarification and schedule change for Corrective Action flo. 7 in Reference 2.
This letter replaces and clarifies both of these items.
Please contact me if you have any questions.
Sincerely, MNM W. G. Gates Vice President WGG/tcm c:
LeBoeuf, Lamb, Greene & MacRae L. J. Callan, f4RC Regional Administrator, Region IV R. P. Mullikin, tJRC senior Resident Inspector S. D. Bloom, ilRC Project Manager