Forwards to Util Clarifying That Draft SER Status Includes CESSAR 80 Final Design Approval Through Amend 6,per 860212 Request
ML20141G092
Person / Time
Site: Satsop
Issue date: 04/14/1986
From: Miraglia F
Office of Nuclear Reactor Regulation
To: Scherer A
ABB COMBUSTION ENGINEERING NUCLEAR FUEL (FORMERLY
Shared Package
ML20141G096 List:
References
NUDOCS 8604230278
Download: ML20141G092 (2)


Text

_ _ _ - _ _ _ _ _ - _ _ _ _ _ _ _ _ _ -

Docket No.:- 50-508 APR 14 S Mr. A. E. Scherer Director, Nuclear Licensing Combustion Engineering, Inc.

h,. '1000 Prospect Hill Road Post Office Box 500 l

Windsor, Connecticut 06095-0500-

Dear Mr. Scherer:

Subject:

Licensing Status of WNP-3 i+

Your letter of February 12, 1986, LD 86-013, requested that the NRC clarify to the Washington Public Power Supply System (WPPSS) the role that standardization '

plays in the WNP-3 safety review. Although the draft safety evaluation report (DSER).of November 19, 1985 did discuss the CESSAR 80 reference, I am enclosing

.a letter to WPPSS. dated April 1, 1983, which clarifies t'1e fact that the DSER status includes the CESSAR 80 FDA approval through Amendment 6 in addition to other concerns on the.licensability of WNP-1 and WNP-3 raised by WPPSS.

Sincerely,

, Original sigued by Frank J. Miraglia

^

Frank J. Miraglia, Director Division of PWR Iicensing-B Office of Nuclear Reactor Regulation

Enclosure:

As stated

.cc: 'See next page

.g L QYN SSPD fly 1 1 BD7 h D

(

L~

h D NR DIR TM s GW bhton Chandler FM fa DE 4/2./86 4/3/86. ( 4/q/86 4/ /86 d//86 \l 8604230278 860414 PDR ADOCK O

]5B

c. ., 1. . t , ,

GREEN TICKET NO. 001435 DISTRIBUTION Docket File.

NRC PDR

~LPDR EDO# 001435

-EDO Reading HDenton/DEisenhut

  1. PBD7. Reading 1SLewis,. ELD

-.. OCA SECY WDircks'

'PPAS (EDO 001435)

FMiraglia/MSchaaf

'JLee ;

c VStello' .

JRoe

TRehm JSniezek

-JMartin JTaylor

~GCunningham-DMossburg x ,

l 1

.t

  1. p* "'49'o,,

UNITED STATES 8 o NUCLEAR REGULATORY COMMISSION

r.  ! W' SHINGTON, D. C. 20555
  • Enclosure
  • ..** ggg Docket Nos: 50-460 anj 50-508 Mr. D. W. Mazur, Managing Director Washington Public Power Supply System Post Office Box 968 3000 George Washington Way Richland, Washington 99352

Dear Mr. Mazur:

SUBJECT:

NRC COMMENTS ON FUTURE LICENSABILITY OF WNP-1 AND WNP-3 Your letter of March 3, 1986, requested clarification on the effect of a further deferral of the forecasted operation of WNP-1 and WNP-3 to the late 1990's on these units. Our previous response regarding licensability of these plants for operation in the early 1990's was sent to you by letter, May 3,1985.

In and of itself, the additional forecasted delaf,si.e., late 1990's vs. early 1990's, will not be expected to have an adverse effect upon plant licensability.

As you have recognized, the effective implementation of your maintenance and

. . preservation programs in terms of preserving structures, equipment and records is of paramount importance in maintaining the long-term potential licensability of the units.

With regard to applying new regulatory changes to deferred plants, as you are aware, the NRC staff is in the process of developing a Connission Policy State-ment to address the maintenance and reactivation requirements of deferred and cancelled plants. This statement is expected to be issued for public comment 4

by September 1986. In the context of the further deferral of WNP-1 and WNP-3, I am not at this time aware of any future regulatory changes which would adversely impact their licensability. Indeed, it is our objective in developing such policy to provide a greater measure of regulatory stability for deferred plants which may be reactivated.

On November 19, 1985, the NRC staff issued a draft SER (DSER) on WNP-3, which incorporated reference portions of the CESSAR 80 design into applicatile sections of the SER. We would like to take this opportunity to advise you that the status of the staff revier at the time of issuance of the DSER, did include the referenced NRC Final Design Approval (FDA) for CESSAR 80 through Amendment 6.

To the extent that the Supply System commits to CESSAR, as approved through subsequent FDA amendments, only review of interfaces will be made for revised sections of the WNP-3 application.

.&s Al / L _2 - >

s w ( 1 y (cir t y D '

l

2-I trust that this response will prove helpful in your assessing the future licensability of WNP-1 and WNP-3.

Sincerely, l

Harold R. Denton, Director Office of Nuclear Reactor Regulation cc: ~ See next page I

k

':N i

4 I J

\ -

i

. -, , , . - , - e

Mr. D. W. Mazur WPPSS Nuclear Project No. 3 Washington Public Power Supply System (WNP-3) cc:

' Mr. Charles B. Brinkman, Manager Washington Nuclear Operations Combustion Engineering, Inc.

7910 Woodmont Avenue Sutie 1310 Bethesda, Maryland 20814 Nicholas S. Reynolds, Esq.

DeBevoise & Liberman 1200 Seventeenth Street Washington, DC 20036 G. E. Doupe, Esq.

Washington Public Power Supply System 3000 George Washington Way Richland, Washington 99352 Mr. Nicholas D. Lewis, Chairman -

Energy Facility Site Evaluation Council Mail Stop PY-11 . ,

Olympia, Washington 98505 Mr. Douglas Coleman Washington Public Power Supply System P. O. Box 1223 Elma, Washington 98541 Mr. Robert T. Dodds Resident Inspector /WPPSS 3/5 c/o U.S. Nuclear Reagulatory Comission P. O. Box 69 Elma, Washington 98541 Regional Administrator, Region V U.S. Nuclear Regulatory Comission 1450 Maria Lane Suite 210 Walnut Creek, California 94596 Mr. Eugene Rosolie, Director Coalition for Safe Power 408 Southwest Second Avenue Portland, Oregon 97204

e - .

. ;; . :-: c. .

. - - -..k [a nto

+* 'o,, UNITED STATES

'n g NUCLEAR REGULATORY COMMISSION -

WASWNGTON, D. C. 20555 2 4 EDO PRINCIPAL CORRESPONDENCF CONTROL

- . - _ _ _ _ _ = - - - - - - -=- _______ ,

FROM: DUF: EDO CONTROL: 001435' DOC DT: .02/12/86 A. E. SCHERER FINAL REPLY:

COMBUSTION-ENGINEERING TO:

.-STELLO FOR SIGNATURE ~OF: ** GREEN ** SECY NO:

DESC: ROUTING:

REQUEST'NRC PROVIDE TO THE NPPC OR THE SUPPLY STFlLO SYSTEM A CLEAR REPRESENTATION OF THE ROI.E ROE STANDARDIZATION PLAYS IN WNP-3 SAFETY REVIEW REHM SNIE7EK DATE: 02/18/86 .JMARTIN

. ASSIGNED TO: NRR CONTACT: DENTON TAYiOR

_ GCUNNINGHAM SPECIAL~ INSTRUCTIONS OR REMARKS:

FOR APPROPRIATE ACTION

.REF. EDO 368 & 392 NRR RECEIVED: 2/19/86 ACTION: PWR-B: HIRAGLIA g

/11 L

.NRR ROUT lNG: DENTON/EISENHUT PPAS

  • Neo/Uh5e

/ 6 0L in < fw

. -HOSSBURG I^ ow t eg j fm, h g ,g )

)c hcr & \d1/S 0

), , g

) ^

\

'd da ~ s;d k m y a

, 9 t-

)$ ob) x l

8 '

  • brf6 OH 4 Mg 0 ; , ,

O _

/7 f 9