ML20141G096

From kanterella
Jump to navigation Jump to search
Forwards 860401 Ltr to Util Clarifying That Draft SER Status Includes CESSAR 80 Final Design Approval Through Amend 6,per 860212 Request
Date released: 06/03/2020 Download: ML20141G096


Requests Clarification That NRC Review of Ref Portion of Plant Application Closed to Extent That Util Commits to CESSAR as Approved Through Final Design Approval & Amend 1
ML20141G099
Person / Time
Site: Satsop
Issue date: 02/12/1986
From: Scherer A
ABB COMBUSTION ENGINEERING NUCLEAR FUEL (FORMERLY
To: STELLO V
NRC OFFICE OF THE EXECUTIVE DIRECTOR FOR OPERATIONS (EDO)
References
Download: ML20141G099 (2)
Forwards 860401 Ltr to Util Clarifying That Draft SER Status Includes CESSAR 80 Final Design Approval Through Amend 6,per 860212 Request
ML20141G092
Person / Time
Site: Satsop
Issue date: 04/14/1986
From: Miraglia F
Office of Nuclear Reactor Regulation
To: SCHERER A E
ABB COMBUSTION ENGINEERING NUCLEAR FUEL (FORMERLY
References
Download: ML20141G092 (2)