ML20211H290
| ML20211H290 | |
| Person / Time | |
|---|---|
| Site: | Satsop |
| Issue date: | 02/06/1987 |
| From: | Pate R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| To: | Mazur D WASHINGTON PUBLIC POWER SUPPLY SYSTEM |
| Shared Package | |
| ML20211H295 | List: |
| References | |
| NUDOCS 8702260139 | |
| Download: ML20211H290 (5) | |
See also: IR 05000508/1986012
Text
- _
-
.
.
-
.
'
![one
s
'
g
q
UNITED STATES
NUCLEAR REGULATORY COMMISSION
o
$
a ,E
REGION V
0,,,
% . . . . + ,o'g
1450 MARIA LANE, SUITE 210
i
WALNUT CREEK, CALIFORNIA 94596
FEB 061987
.
Docket No. 50-508
i
Washington Public Power Supply System
P.O. Box 968 3000 George Washington Way
Richland, Washington 99352
ATTN: Mr. D. W. Mazur
Managing Director
Gentlemen:
SUBJECT: NRC REVIEW 0F WASHINGTON NUCLEAR PROJECT NO. 3 (WNP-3)
i
READINESS REVIEW MODULE C3-01 EARTHWORK - REPORT NO. 50-508/86-12
4
The NRC has completed a detailed review, inspection, and verification of the
subject module which you submitted to the NRC on September 10, 1986. Periodic
inspections were conducted at the WNP-3 site, and the resultant findings were
discussed with members of your staff at the conclusion of these inspections.
Technical reviews were conducted primarily in NRC Bethesda and Region V
offices, and the findings from these reviews have also been discussed with your
staff.
Areas contained in the module which were reviewed, examined, and verified are
'
identified in the enclosed report. Within these areas, the inspection
verification consisted of selected examinations of procedures and
representative records, discussions with personnel, observations of activities
!
in progress, inspection of a sample representing critical elements included in
the construction Earthwork program and review of your licensing comitments.
The results of Module C3-01 reviews and inspections are sumarized in the
enclosed report. These results are based on Module C3-01 reviews and prior
inspections reported in NRC Inspection Reports 50-508/86-10 dated October 2,
.
1986 and 50-508/86-11 dated November 26, 1986. Your attention is invited to
these matters which will be pursued during future licensing reviews and inspec-
tions.
In addition, several open items must be adequately addressed in the
performance of engineering / design Module E3-02 Civil / Structural as discussed in
the enclosed report.
Based upon the NRC review and inspection of those activities identified in the
module, we have determined that earthwork construction completed at the time of
work stoppage at WNP-3 is acceptable assuming effective resolution of the open
items identified in the enclosed NRC report. This decision was based upon
information currently available to the inspectors and reviewers. Should
1
information subsequently become available which was not considered during this
review or which conflicts with earlier infonnation, it will be evaluated to
l
detennine what effects it may have on the above conclusion.
8702260139 870206
i
ADOCK 05000508
[/
G
/
l
/
lil
/
4
,
-
.
.
Washington Public Power Supply System
-2-
FEB 061987
Please contact us should you have any questions concerning this letter.
.
Sincerely,
/
V
"
Robert J. P te, Chief
Reactor Safety Branch
Enclosure: Report No. 50-508/86-12
cc w/ enclosure:
P. D. Olson, WPPSS
R. B. Glasscock, WPPSS
L. J. Garvin, WPPSS
State of WA
j
i
i
i
.
.
.
t
7
cc w/ enclosure:
Washington Public Power Supply System
-2-
FEB 061987
cc w/ enclosure: P. D. Olson, WPPSS
R. B. Glasscock, WPPSS
L. J. Garvin, WPPSS
State of WA
bec w/ enclosure:
RSB/ Document Control Desk (RIDS)
Project Inspector
Resident Inspector
'
G. Cook
B. Faulkenberry
J. Martin
docket file
,
bec w/o enclosure:
M. Smith'
i
LFMB
,.
,
.
- See previous concurrence
'0FC :*RCPB:DI:lE :*RCPB:DI:IE :*RCPB:DI:IE :*DIR:DI:IE
- QAB:DQAVT:IE:*QAB:DQAVT:IE:QAB.DQAVT:IE
.. __:________....:.___________:____________: ___________:____________:____________:.. _______.
NAME-:HPhillips/vj:MPeranich
- JKonklin
- JPartlow
- LLewis
- FHawkins
- HMiller
_____:______.____:__________.:____________:____________:____________:.___________:_..________
DATE :12/ /86
- 12/ /86-
- 12/ /86
- 12/ /86
- 12/ /86
- 12/ /86
- 01/ /87
0FC :DIR:DQAVT:IE:NRR
- NRR
- 0GC
- RV
- RV
':RV
_____:._________. :____________:______...__.:..______..._:____________:....
___:..
____.
_ _ _ . . : _ __ _ _ _ _ _ _ _ _ _ : _ _ _ _ _. ._ _ _ _ _ : . _ _ _ _ __ _ _ _ . . : .. __ _ _ _ _ _ _ _ :
NAME :BGrimes
- RLee
- GKnighton
- JRutberg
- ATothjf
- RPa e
___:hg__f87
/ Ji/87
________:.__________
DATE :01/ /87
- 01/ /87
- 01/ /87
- 01/ /87
- 01/Jo/87
- f/a /
-
0FC :RV
____.:______......:____________:_..__._____:_____.__...:____________:_____.._____:___________
NAME _;EJire'
i
.....: _ .________:____________:____________: ..______ ..:.___________:_. _________:________...
' DATE -Q1/ -f87'
L
. .
.
.o
s
.
.
Washington Public Power Supply System
-3-
FEB 061987
cc w/ enclosure:
Gk PQMT'TE
f)k.NncEn
-
J % los
,
,
,
0FC :RCPB:DI:IE :R
__.___.___gl
- DIR: EE
J: IE :RCP
VT:IE:
AVT:IE:DIR:0QAVT:IE
g
______.Q_
y.p....
,
,,
s_. . __..
...._._
__._
.__...___.____._-___.
7l/hs/vj:MPeranich
- JKonkli;1
- JPa t,1
- L wis
- FHawkins
- BGrimes
NAME :
i
. _ _ _ _ . - - _ _ _ _ _ _ _ _ . . _ _ _ _ _ _ _ _ . _ _ _ . _ - _ _y[ /8 6
$12/ /86
$12//f/86
$12//h86
$12/ /86
_______.__.__ -_____._____.._____.___________..___________
DATE$2/4/86
$12/M/86
$12/1
0FC :NRR
- NRR
- 0GC
- RV
- RV
- RV
- RV
..___.. __________.____________.____________._____...____._______ _....______ _____.. __ __ ..
NAME :RLee
- GKnighton
- JRutberg
- AToth
- ACha ee
- DKir ch
- JM tin
_____.____________.____________.. __________.____________.__ . ______.__ ________.._ _.... _.
DATE :12/ /86
- 12/ /86
- 12/ /86
- 12/ /86
/ /86
/ /86
- 2/ /86
-
. _ . .
.-_ _
,
.
_ _ . .
._
_
_ _ _
-
,
, . .
. .
.
Washington Public Power Supply System
-3-
FEB 061987
cc w/ enclosure:
,
- See previous concurrence
0
0FC :*RCP8:DI:IE :*RCP8:DI:IE :*RCP8:DI:IE :*DIR:DI:IE : *QAB: DQAVT:IE: *Ql.B:DQAVT:IE:QAB
AVT:I@
....... __.. _____.__ ____..___....._......_._.......____... _..... __._.g .__ __.
___ ...
NAME :HPhillips/vj:MPeranich
- JKonklin
- JPartlow
- llewis
- FHAkins
11er
_..._..........__....._._...._......___...__......_....._...____._--...__;.p4yq_..._....___
DATE :12/ /86
- 12/ /86
- 12/ /86
- 12/ /86
- 12/ /86
- 12
/86
- 1/k /87
0/I
_
s
0FC :DIR-
V.
- NRR
- NRR
- 0GC
- RV
- RV c (4-
- RV
NAME$d'.es
$RLee Ts/sm $GKni
Mf- JRutb r T
.__.gygg_.R4eh, hSt n%.4.kh raSv/M ATothWE..._...____.$SRichards
$MPate
k
___...
._
....__..._...
3_j..__....
^#
DATE :01/Ll/87
- 01//t/87
- 01//f/87
- 01/M/87
- 01/ /87
- 0#cc/87
- R/ 4/87
0FC :RV
- RV
- RV
..._...._...._____.
_..._._n
...._.....___.._._.._..._...__.___................._......__..__.
,
NAME :AChaffee
- DKi ch
- JMa -in
__.......... .....
__________.
.._______......____....._........___....._. _ ._.._____......
DATE :01/ /87
- 01/ /87
- 01/ /87
/
/