Forwards Insp Rept 50-508/86-12 on 860915-1215.No Violations Noted.Review of Readiness Review Module C3-01, Earthwork Indicates Const Completed at Time of Work Stoppage Acceptable Assuming Resolution of Open Items
ML20211H290
Person / Time
Site: Satsop
Issue date: 02/06/1987
From: Pate R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Mazur D
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
Shared Package
ML20211H295 List:
References
NUDOCS 8702260139
Download: ML20211H290 (5)


See also: IR 05000508/1986012

Text

- _

-

.

.

-

.

'

![one

s

'

g

q

UNITED STATES

NUCLEAR REGULATORY COMMISSION

o

$

a ,E

REGION V

0,,,

% . . . . + ,o'g

1450 MARIA LANE, SUITE 210

i

WALNUT CREEK, CALIFORNIA 94596

FEB 061987

.

Docket No. 50-508

i

Washington Public Power Supply System

P.O. Box 968 3000 George Washington Way

Richland, Washington 99352

ATTN: Mr. D. W. Mazur

Managing Director

Gentlemen:

SUBJECT: NRC REVIEW 0F WASHINGTON NUCLEAR PROJECT NO. 3 (WNP-3)

i

READINESS REVIEW MODULE C3-01 EARTHWORK - REPORT NO. 50-508/86-12

4

The NRC has completed a detailed review, inspection, and verification of the

subject module which you submitted to the NRC on September 10, 1986. Periodic

inspections were conducted at the WNP-3 site, and the resultant findings were

discussed with members of your staff at the conclusion of these inspections.

Technical reviews were conducted primarily in NRC Bethesda and Region V

offices, and the findings from these reviews have also been discussed with your

staff.

Areas contained in the module which were reviewed, examined, and verified are

'

identified in the enclosed report. Within these areas, the inspection

verification consisted of selected examinations of procedures and

representative records, discussions with personnel, observations of activities

!

in progress, inspection of a sample representing critical elements included in

the construction Earthwork program and review of your licensing comitments.

The results of Module C3-01 reviews and inspections are sumarized in the

enclosed report. These results are based on Module C3-01 reviews and prior

inspections reported in NRC Inspection Reports 50-508/86-10 dated October 2,

.

1986 and 50-508/86-11 dated November 26, 1986. Your attention is invited to

these matters which will be pursued during future licensing reviews and inspec-

tions.

In addition, several open items must be adequately addressed in the

performance of engineering / design Module E3-02 Civil / Structural as discussed in

the enclosed report.

Based upon the NRC review and inspection of those activities identified in the

module, we have determined that earthwork construction completed at the time of

work stoppage at WNP-3 is acceptable assuming effective resolution of the open

items identified in the enclosed NRC report. This decision was based upon

information currently available to the inspectors and reviewers. Should

1

information subsequently become available which was not considered during this

review or which conflicts with earlier infonnation, it will be evaluated to

l

detennine what effects it may have on the above conclusion.

8702260139 870206

i

PDR

ADOCK 05000508

[/

G

PDR

/

l

/

lil

/

4

,

-

.

.

Washington Public Power Supply System

-2-

FEB 061987

Please contact us should you have any questions concerning this letter.

.

Sincerely,

/

V

"

Robert J. P te, Chief

Reactor Safety Branch

Enclosure: Report No. 50-508/86-12

cc w/ enclosure:

P. D. Olson, WPPSS

R. B. Glasscock, WPPSS

L. J. Garvin, WPPSS

State of WA

j

i

i

i

.

.

.

t

7

cc w/ enclosure:

Washington Public Power Supply System

-2-

FEB 061987

cc w/ enclosure: P. D. Olson, WPPSS

R. B. Glasscock, WPPSS

L. J. Garvin, WPPSS

State of WA

bec w/ enclosure:

RSB/ Document Control Desk (RIDS)

Project Inspector

Resident Inspector

'

G. Cook

B. Faulkenberry

J. Martin

docket file

,

bec w/o enclosure:

M. Smith'

i

LFMB

,.

,

.

  • See previous concurrence

'0FC :*RCPB:DI:lE :*RCPB:DI:IE :*RCPB:DI:IE :*DIR:DI:IE

  • QAB:DQAVT:IE:*QAB:DQAVT:IE:QAB.DQAVT:IE

.. __:________....:.___________:____________: ___________:____________:____________:.. _______.

NAME-:HPhillips/vj:MPeranich

JKonklin
JPartlow
LLewis
FHawkins
HMiller

_____:______.____:__________.:____________:____________:____________:.___________:_..________

DATE :12/ /86

12/ /86-
12/ /86
12/ /86
12/ /86
12/ /86
01/ /87

0FC :DIR:DQAVT:IE:NRR

NRR
0GC
RV
RV

':RV

_____:._________. :____________:______...__.:..______..._:____________:....

___:..

____.

_ _ _ . . : _ __ _ _ _ _ _ _ _ _ _ : _ _ _ _ _. ._ _ _ _ _ : . _ _ _ _ __ _ _ _ . . : .. __ _ _ _ _ _ _ _ :

NAME :BGrimes

RLee
GKnighton
JRutberg
ATothjf
RPa e

___:hg__f87

/ Ji/87

________:.__________

DATE :01/ /87

01/ /87
01/ /87
01/ /87
01/Jo/87
f/a /

-

0FC :RV

____.:______......:____________:_..__._____:_____.__...:____________:_____.._____:___________

NAME _;EJire'

i

.....: _ .________:____________:____________: ..______ ..:.___________:_. _________:________...

' DATE -Q1/ -f87'

L

. .

.

.o

s

.

.

Washington Public Power Supply System

-3-

FEB 061987

cc w/ enclosure:

Gk PQMT'TE

f)k.NncEn

-

J % los

,

,

,

0FC :RCPB:DI:IE :R

__.___.___gl

DIR: EE

J: IE :RCP

VT:IE:

AVT:IE:DIR:0QAVT:IE

g

______.Q_

y.p....

,

,,

s_. . __..

...._._

__._

.__...___.____._-___.

7l/hs/vj:MPeranich

JKonkli;1
JPa t,1
L wis
FHawkins
BGrimes

NAME :

i

. _ _ _ _ . - - _ _ _ _ _ _ _ _ . . _ _ _ _ _ _ _ _ . _ _ _ . _ - _ _y[ /8 6

$12/ /86

$12//f/86

$12//h86

$12/ /86

_______.__.__ -_____._____.._____.___________..___________

DATE$2/4/86

$12/M/86

$12/1

0FC :NRR

NRR
0GC
RV
RV
RV
RV

..___.. __________.____________.____________._____...____._______ _....______ _____.. __ __ ..

NAME :RLee

GKnighton
JRutberg
AToth
ACha ee
DKir ch
JM tin

_____.____________.____________.. __________.____________.__ . ______.__ ________.._ _.... _.

DATE :12/ /86

12/ /86
12/ /86
12/ /86

/ /86

/ /86

2/ /86

-

. _ . .

.-_ _

,

.

_ _ . .

._

_

_ _ _

-

,

, . .

. .

.

Washington Public Power Supply System

-3-

FEB 061987

cc w/ enclosure:

,

  • See previous concurrence

0

0FC :*RCP8:DI:IE :*RCP8:DI:IE :*RCP8:DI:IE :*DIR:DI:IE : *QAB: DQAVT:IE: *Ql.B:DQAVT:IE:QAB

AVT:I@

....... __.. _____.__ ____..___....._......_._.......____... _..... __._.g .__ __.

___ ...

NAME :HPhillips/vj:MPeranich

JKonklin
JPartlow
llewis
FHAkins

11er

_..._..........__....._._...._......___...__......_....._...____._--...__;.p4yq_..._....___

DATE :12/ /86

12/ /86
12/ /86
12/ /86
12/ /86
12

/86

1/k /87

0/I

_

s

0FC :DIR-

V.

NRR
NRR
0GC
RV
RV c (4-
RV

NAME$d'.es

$RLee Ts/sm $GKni

Mf- JRutb r T

.__.gygg_.R4eh, hSt n%.4.kh raSv/M ATothWE..._...____.$SRichards

$MPate

k

___...

._

....__..._...

3_j..__....

^#

DATE :01/Ll/87

01//t/87
01//f/87
01/M/87
01/ /87
0#cc/87
R/ 4/87

0FC :RV

RV
RV

..._...._...._____.

_..._._n

...._.....___.._._.._..._...__.___................._......__..__.

,

NAME :AChaffee

DKi ch
JMa -in

__.......... .....

__________.

.._______......____....._........___....._. _ ._.._____......

DATE :01/ /87

01/ /87
01/ /87

/

/