ML20090E882

From kanterella
Revision as of 10:14, 25 September 2022 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Forwards Application for Amend to Licenses DPR-42 & DPR-60, Proposing Tech Spec Changes Re Peaking Factor Limits, Reporting,Refueling Boron Concentration & Radioactive Source Leakage Tests.Fee Encl
ML20090E882
Person / Time
Site: Prairie Island  Xcel Energy icon.png
Issue date: 07/11/1984
From: Musolf D
NORTHERN STATES POWER CO.
To:
Office of Nuclear Reactor Regulation
Shared Package
ML20090E885 List:
References
GL-84-43, TAC-55445, TAC-55446, TAC-55816, TAC-55817, NUDOCS 8407200087
Download: ML20090E882 (2)


Text

_

~

Northern States Power Company 414 Nicollet Mall Minneapons. %nnesota 55401 Telepnene (612) 330 5500 July 11, 1984 -

Director Office of Nuclear Reactor Regulation U S Nuclear Regulatory Commission Washington, DC 20555 PRAIRIE ISLAND NUCLEAR GENERATING PLAITI Docket No. 50-282 License No. DPR-42 50-306 DPR-60 License Amendment Request Dated July 11, 1984 Peaking Factor Limit Change, Reporting Changes, New Table of Contents and Other Changes Attached are 3 originals and 37 conformed copies of a request for a change in the Technical Specifications, Appendix A, of Operating Licenses DPR-42 and 60. Also' enclosed is a check in the amount of $150.00 in accordance with 10 CFR Part 170.

This submittal proposes changes in the following areas: 1) Peaking Factor Limits; 2) Reporting; 3) Table of Contents; 4) Refueling Baron Concentration; 5) Radioactive Source Leakage Tests; 6) SRO Shift Require-ments; 7) Deletion of Snubber Table; 8) Spray Additive Tank Requirements;

9) Discharge Canal Flow Monitoring; 10) Radioactive Effluent Monitoring -

Instrumentation Surveillance Requirements; 11) Radiation Environmental Monitoring Program Sample Collection and Analyses; and 12) Changes in Management Titles.

Exhibit A describes the pri. : sed changes, reasons for changc., and significant hazards evaluation. Exhibit B contains the revised Technical Specification pages.

Exhibit C is the NSP report NSPNAD-8406 entitled " Safety Evaluation with Increased Enthalpy Rise Factor". Exhibit D is the Exxon Nuclear Company report XN-NF-84-03 entitled " Limiting Break LOCA-ECCS Analysis with Increased Enthalpy Rise Factor". Both these reports support the peaking factor limit changes.

dg60 h'MADE/Alifd Wir /Bf W ns \ ' ;# p t $ p S1 4AfDslf EE6 fm M/Dsj'$A6 8407200087 840711 PDR ADOCK 05000282 P PDR

s p.= .

Dir, NRR July 11, 1984 Page 2 Northem States Power Company Item 2, Reporting Changes, is being submitted as a result of Generic Letter 83-43, dated December 19, 1983, which stated that no NRC fee would be required for review of this item.

u\

David Musolf Manager - Nuclear Suppor ervices DMM/TMP/ dab c: Regional Administrator-III, NRC NRR Project Manager, NRC Resident Inspector, NRC G Charnoff MPCA Attn: J W Ferman Attachments e .

O e

e

. . - . . ,-. . . - , . , . - - . -. , , . . . -- , , . - . . . . - .