ML20090E882
| ML20090E882 | |
| Person / Time | |
|---|---|
| Site: | Prairie Island |
| Issue date: | 07/11/1984 |
| From: | Musolf D NORTHERN STATES POWER CO. |
| To: | Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML20090E885 | List: |
| References | |
| GL-84-43, TAC-55445, TAC-55446, TAC-55816, TAC-55817, NUDOCS 8407200087 | |
| Download: ML20090E882 (2) | |
Text
_
~
Northern States Power Company 414 Nicollet Mall Minneapons. %nnesota 55401 Telepnene (612) 330 5500 July 11, 1984 Director Office of Nuclear Reactor Regulation U S Nuclear Regulatory Commission Washington, DC 20555 PRAIRIE ISLAND NUCLEAR GENERATING PLAITI Docket No. 50-282 License No. DPR-42 50-306 DPR-60 License Amendment Request Dated July 11, 1984 Peaking Factor Limit Change, Reporting Changes, New Table of Contents and Other Changes Attached are 3 originals and 37 conformed copies of a request for a change in the Technical Specifications, Appendix A, of Operating Licenses DPR-42 and 60.
Also' enclosed is a check in the amount of $150.00 in accordance with 10 CFR Part 170.
This submittal proposes changes in the following areas:
- 1) Peaking Factor Limits; 2) Reporting; 3) Table of Contents; 4) Refueling Baron Concentration; 5) Radioactive Source Leakage Tests; 6) SRO Shift Require-ments; 7) Deletion of Snubber Table; 8) Spray Additive Tank Requirements;
- 9) Discharge Canal Flow Monitoring; 10) Radioactive Effluent Monitoring Instrumentation Surveillance Requirements; 11) Radiation Environmental Monitoring Program Sample Collection and Analyses; and 12) Changes in Management Titles.
Exhibit A describes the pri. : sed changes, reasons for changc., and significant hazards evaluation.
Exhibit B contains the revised Technical Specification pages.
Exhibit C is the NSP report NSPNAD-8406 entitled " Safety Evaluation with Increased Enthalpy Rise Factor".
Exhibit D is the Exxon Nuclear Company report XN-NF-84-03 entitled " Limiting Break LOCA-ECCS Analysis with Increased Enthalpy Rise Factor".
Both these reports support the peaking factor limit changes.
dg h'MADE/Alifd 60 Wir /Bf W n \\
' ;# p t $ p S1 4AfDslf s
EE6 fm M/Dsj'$A6 8407200087 840711 PDR ADOCK 05000282 P
s p.=
Dir, NRR July 11, 1984 Page 2 Northem States Power Company Item 2, Reporting Changes, is being submitted as a result of Generic Letter 83-43, dated December 19, 1983, which stated that no NRC fee would be required for review of this item.
u\\
David Musolf Manager - Nuclear Suppor ervices DMM/TMP/ dab c: Regional Administrator-III, NRC NRR Project Manager, NRC Resident Inspector, NRC G Charnoff MPCA Attn:
J W Ferman Attachments e
O e
e
,. -.... -.