ML20206T246
| ML20206T246 | |
| Person / Time | |
|---|---|
| Site: | Prairie Island |
| Issue date: | 05/17/1999 |
| From: | Sorensen J NORTHERN STATES POWER CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20206T249 | List: |
| References | |
| NUDOCS 9905240102 | |
| Download: ML20206T246 (2) | |
Text
W Northern States Power Company
~
Pralrle Island Nuclear Generating Plant 1717 Wakonsde Dr. East Welch, Minnesota 55089 i
Prairie Island Technical May 17,1999 Specification TS 6.7.A.4 U S Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 PRAIRIE ISLAND NUCLEAR GENERATING PLANT Docket Nos. 50-282 License Nos. DPR-42 50-306 DPR-60 Annual Radioactive Effluent and Waste Disposal Report for January throuah December 1998 In accordance with the Prairie Island Technical Specifications, we are submitting one copy of the Radioactive Effluent and Waste Disposal Report covering 1998.
The documents included are as follows:
Off-Site Radiation Dose Assessment, covering 1/98 through 12/98.
Revision 0 of the Annual Radioactive Effluent Report, Supplemental Information, covering 1/5/98 through 1/3/99.
Effluent and Waste Disposal Annual Report Solid Waste and Irradiated Fuel Shipments, covering 1/1/98 through 12/31/98.
In this letter we have made no new Nuclear Regulatory Commission commitments.
/
z
...a W
9905240102 990517 PDR ADOCK 050002G2 R
PDR O
9 USNRC NORTHERN STATES POWER COMPANY May 17,1999 Page.2 Please contact Jack Leveille (651-388-1121, Ext. 4142) if you have any questions related to this letter.
/
Joel P. Sorensen Site General Manager Prairie Island Nuclear Generating Plant c:
Regional Administrator-Region Ill, NRC Senior Resident inspector, NRC NRR Project Manager, NRC J E Silberg State of Minnesota Attn: Tim Donakowski Attachments:
1.
Off-Site Radioactive bose Assessment for Northem States Power Company 2.
Annual Radioactive Effluent Report 3.
Effluent and Waste Disposal Annual Report Solid Waste and Irradiated Fuel Shipments marrn.coc
)