ML20246L506

From kanterella
Jump to navigation Jump to search
Responds to Generic Ltr 89-12, Operator Licensing Exams
ML20246L506
Person / Time
Site: Prairie Island  
Issue date: 08/31/1989
From: Parker T
NORTHERN STATES POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GL-89-12, NUDOCS 8909060343
Download: ML20246L506 (3)


Text

_ - _ _ _..

I' 6'

Northem States Power Comparry i-414 Nicollet Mall Minneapolis, Minnesota 554011927 Telephone (612) 330-5500 g

Generic Letter 89-12 August 31, 1989 Director of Nuclear Reactor Regulation U S Nuclear Regulatory Commission Attn:

Document Control Desk Washington DC 20555 PRAIRIE ISLAND NUCLEAR GENERATING PLANT Docket Nos.50-282 License Ncs. DPR-42 50-306 DPR-60 Response to Generic Letter 89-12 Operator Licensinn Examinations Attached is our response to Generic Letter 89-12, " Operator Licensing Examinations" for the Prairie Island Nuclear Generating Plant.

Please contact us if you have any questions related to our response.

Thomas M Parker Manager Nuclear Support Services cc: Regional Administrator, NRC NRR Project Manager, NRC Resident Inspector, NRC G Charnoff

Attachment:

Response to Generic Letter 89-12 moo 3 I

8909060343 890831 FDR ADOCK 05000282 V

FDC

t o.

f l

r l'

PROPOSED OPERATOR LICENSING EXAMINATION SCHEDULE FORMAT Prairie Island III

' facility NRC Region FY.1990 FY 1991 FY 1992

  • FY 1993 (10/1/89-9/30/90)(10/1/90-9/30/91)(10/1/91-9/30/92)(10/1/92-9/30/93) 1..' Assigned.

(

9$03) 5/90 4/91.

4/92 4/93

" - FRO.

14 6

6

-6

  1. SRO Instant-6 6

6 6

  1. SRO. Upgrade 8-6~
  1. SRO Limited,
2. -Assigned-Date

.(GL89-03).

fR0 iSRO Instant' iSR0 Upgrade

.#SRO Limited Please indicate initial cold license examinations.by placing an asterisk (*) by the date. 'Please indicate examinations intended to extend an operator's license to a second'or subsequent unit with two: asterisks -(**).

tror example, if Unit 1 is in operation and Unit 2 is approaching fuel load, and three RO candidates uith no previous license are to be examined on both Units 1 and 2, and five

. R0 candidates licensed on Unit 1 are to be examined to extend their licenses toUnit'2,thenindicate"R03,5**.')

3 PROPOSED REQUALIFIrATION EXAMINATION SCHEDULE FORMAT Facility Prairie Island NRC Region-111 Planned Simulation Facility Certification / Approval Date 1/91 FY 1990 FY 1991 FY 1992 FY 1993 (10/1/89-9/30/90)

(10/1/90-9/30/91)(10/1/91-9/30/92)(10/1/92-9/30/93) 1._

Date 10/Ji9 Date 10/90 Date 10/91 Date 10/92 2.

Date Date Date Date 3.

Date Date Date Date 4

Date Date Date Date 5.

Date Date Date Date 1

1 l

l l

_ _ _ _ _ _ _ - _ - _ _ _ - _ - _ - - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _