Responds to Violations Noted in Insp Rept 50-458/85-23. Corrective Actions:Temp Indicating Device Being Used Per S&W Mechanical Test Procedure 1.MPGEN.003
ML20129C246
Person / Time
Site: River Bend Entergy icon.png
Issue date: 06/27/1985
From: William Cahill
GULF STATES UTILITIES CO.
To: Martin R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
Shared Package
ML20129C216 List:
References
RBG-21406, NUDOCS 8507290384
Download: ML20129C246 (5)


Text

. .-

l 4E)

GULF STATES UTILITIES COMPANY RIVER BEND STATION POST OFFICE 80X 220 ST. FRANCISV;LLE LOUl51ANA 70775 AREA CODE 504 635-6094 346 8651 June 27, 1985 RBG- 21406 File Nos. G9.5, G15.4.1 Mr. Robert D. Martin, Regional Administrator U. S. Nuclear Regulatory Ccmnission Region IV ,p g ggg r~ r 611 Ryan Plaza Drive, Suite 1000 ;if3,o[.5 Arlington, Texas 76011 , ,j t

R. - i 1985

Dear Mr. Martin:

Iy,I bO I River Bend Station - Unit 1 Refer to: RIV Docket No. 50-458/ Report 85-23

'Ihis is in response to the Notice of Violations contained in NRC I&E Inspection Report No. 50-458/85-23. The inspection was performed by Mr. D.

D. Chamberlain during the period March I and April 30, 1985, of activities authorized by NRC Construction Permit CPPR-145 for River Bend Station Unit No. 1.

Gulf States Utilities Conpany's (GSU) response to the Notice of Viola-tions 85-23-03, " Monitor Tertperature," 85-23-04, " Calibrate Gas Meter in Range of Use," and 85-23-02, " Follow Procedure," is provided in the enclosed attachment. This empletes GSU's response to the Notice of Viola-tions.

Sincerely, I I

. 1

. J. Cahill, Jr.

Senior Vice President River Bend Nuclear Group

, MO WJC/ / /'ICC/PJD/amg N

gg72 g g g g ge G

it-ot3 6

ATTACHMENT June 27, 1985 RBG- 21406 Response to Notice of Violations Reference Notice .of Violation - E. H. Johnson letter to W. J. Cahill, dated May 29,

.1985.

Refer to Docket 50-458/85-23.

Response to 85-23-03 Monitor Temperature CORRECTIVE STEPS MIICH HAVE BEEN TAKEN AND RESULTS ACHIEVED A temperature indicating device is now being used in accordance with Stone and Webster Mechanical Test Procedure 1.MPGEN.003 "HVAC Pressure and Leak Test Procedure for ANSI 509/510 Ductwork" which was written to include the requirements of ANSI N510. All safety related ductwork previously tested under the 1.MPGEN.002 Mechanical Test Procedure is being retested utilizing Mechanical Test Procedure 1.MPGEN.003 which uses the " Pressure Decay Method" for determining the leakage rate of the ductwork.

CORRECTIVE STEPS MIICH WILL BE TAKEN 'IO AVOID FURTHER VIOIATIONS Mechanical Test Procedure 1.MPGEN.003 includes the requirement of ANSI N510 and is being used for testing of safety related ductwork.

DATE MIEN FULL COMPLIANCE WILL BE ACHIEVED Full empliance will be achieved by July 22, 1985.

,p .t Page 2 June 27, 1985 RBG- 21406 j Response to 85-23-04 Calibrate Gas Meter in Range of Use CORRECTIVE STEPS MIICH HAVE BEEN TAIEN AND RESULTS ACHIEVED Use of the gas meter to determine leakage rate of the ductwork being tested has been discontinued. All safety related ductwork is being retested uti-lizing the " Pressure Decay Method" as outlined in ANSI-N510.

CORRECTIVE STEPS WHICH WILL BE TAKEN TO AVOID FURTHER VIOIATIONS Mechanical Test Procedure 1.MPGEN.003 is being used for testing of safety related ductwork.

j 1%TE WHEN FULL COMPLIANCE WILL BE ACHIEVED Full ccmpliance will be achieved by July 22, 1985.

J

)

1 9

i i

4 1

4 i

4

- . _ , - - -.,-,7.. - _ , , , . ~ n.-. ,,,n., ,yw.- .g, ,, . . , , _ . _ , _ , _ _, ,,,m,w.,._.,, - ,,r__, , - , .,,.,,,,..,.g,,,m,-_, ---m ...

m Page 3 June 27, 1985 RBG- 21406 Response to 85-23-02 Follow Procedure 00iwfL'nVE STEPS MIICH HAVE BEEN TAKEN AND RESULTS AOIIEVED Regarding preorcrational test procedure 1-PT-210," Integrated ECCS and Loss of Offsite Power," that had not been stanped for notification of operations quality assurance as required by Test Instruction (TI) 8 " Conduct of Test-ing," Project Quality Test Group personnel were notified and were present during the conduct of testing. It was recognized by the test engineer initially that the procedure was not stamped. However, due to the late hour, the proper stamp was not available frcm the supervisor-preoperational test. During turnover the next day, the test engineer failed to bring up the need to place the stamp in the procedure and shortly thereafter the discrepancy was discovered by the senior resident inspector. The supervisor-preoperational test was then informed and the stamp was intnedi-ately placed on the procedure.

The test engineers involved were instructed by their supervisor of the importance of stamping the procedure and were raninded that it is required by TI 8 " Conduct of Testing." Both engineers were instructed to follow procedure when preparing a preoperational for testing.

COimrLnVE STEPS WHIGI WILL BE TAKEN 'IO AVOID FURTHER VIOIATIONS SU&T personnel were trained on May 29, 1985, on the requirenents of TI-8

" Conduct of Testing".

DATE MIEN FULL CCEPLIANCE WAS AOIIEVED Full canpliance was achieved by May 29, 1985.

l l

l

, e '.

UNITED STATES OF AMERICA NUCLEAR RECULATORY COMMISSION STATE OF IAUISIANA 5 PARISH OF WEST FELICIANA 5 In the Matter of $ Docket Nos. 50-458 CULF STATES UTILITIES COMPANY 50-459 l

(River Bend Station, Unit 1)

AFFIDAVIT W. J. Cahill, Jr., being duly sworn, states that he is a Vice President of Gulf States Utilities Company; that he is authorized on the part of said Company to sign and file with the Nuclear Regulatory' Commission the documents attached hereto; and that all such documents are true and correct to the best of his knowledge, information and belief.

A

. Cahill, Jr.

f Subscribed and sworn to before me, a Notary Public in and for the State and Parish above named, this day of 4/76 , 19 f

/

/ L e .//

fo/nW.MiddlebrooksI

{Ndtary Public in and for I West Feliciana Parish, Louisiana My Commission is for Life.

)

l l

l l

1 i