ML20137R404

From kanterella
Revision as of 09:54, 13 December 2021 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Ack Receipt of 970225 Application to Amend Coc GDP-1, Modifying Bounding Calculated Dose for Hypothetical Criticality Case in Bldg X-333.Initial Administrative Review Has Been Completed
ML20137R404
Person / Time
Site: 07007001
Issue date: 04/10/1997
From: Yawar Faraz
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
To: John Miller
UNITED STATES ENRICHMENT CORP. (USEC)
References
TAC-L32014, NUDOCS 9704140110
Download: ML20137R404 (1)


Text

April 10, 1997 Mr. James H. Miller Vice President, Production U. S. Enrichment Corporation 2 Democracy Center 6903 Rockledge Drive Bethesda, MD 20817

SUBJECT:

PORTSMOUTH CERTIFICATE AMENDMENT REQUEST -INCREASED IMPACTS FOR HYPOTHETICAL CRITICALITY CASE IN BUILDING X-333 -

ACKNOWLEDGEMENT OF RECEIPT (TAC NO. L32014)

Dear Mr. Miller:

We have received your application to amend Certificate of Compliance GDP-2 transmitted by letter dated February 25,1997, by modifying tne bounding calculated dose for a hypothetical criticality case in Building X-333 described in section 4.1.1.2.5 of the Portsmouth Gaseous Diffusion Plant's Safety Analysis Report. Your request has been assigned TAC No. L32014. Please reference this number in any future correspondence associated with this request.

We have completed the initial administrative review of your application for amendment of your certificate. No omissions or defit,iencies were identified, therefore, we have found it acceptable for formal review. Please note that the formal review may identify omissions in the submittalinformation or issues that require additional information.

Based on our administrative reviews and projection of current review schedt:les, we anticipate completing our review by July 11,1997. This date could change depending on the findings of our formal review, urgent assignments, or other factors. We will promptly communicate any significant changes to this cchedule.

A copy of your correspondence has been forwarded to our License Fee and Accounts Receivable Branch, Office of the Controller, who will contact you separately for billing if your request is subject to full cost recovery.

If you have questions, please contact me at (301) 415-8113.

Sincerely, ,

/ J Original Signed By 0 j NRC HLE CENTER COPY vewer H. eerez, erojec1 Meneoer Ennchment Section A/fd Special Projects Branch Division of Fuel Cycle Safety and Safeguards, NMSS J Docket 70-7001 1 Certificate GDP-2 l DIST RIBUTION: (Control No. 0603) i DockM 70-7002 NRC nie Center PUBLIC KO*Brien, Rill i CCox.Rh1 NMSS r/f FCSS r/f WSchwink, FCO6 l MHorn. SPB SPB r/f OGC GShear, Rlli DMartin, SPB DDamon, FCLB G:\HYPOLTRI .YHF l OFC SPB b n SPB pP d $RB /

NAME YFarar: hhHoadlev Dktn RPfNon DATE h / f /97 h /\0/97 // /97 / / /97 / /97 C = CO /ER E = COVER & ENCLOSURE N = NO C3PY

, . .. OFFICIAL HECORD COPY 9704140110 970410 PDR ADOCK 07007001 C PDR