ML20195H790

From kanterella
Revision as of 10:23, 9 December 2021 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Requests That Date for Submission of Low Enriched U Conversion Application Be Extended to 890306.Extension Required to Do Remaining Work for Selection & Validation of Low Enriched Core for Facility
ML20195H790
Person / Time
Site: Rhode Island Atomic Energy Commission
Issue date: 06/23/1988
From: Dimeglio A
RHODE ISLAND, STATE OF
To: Michaels T
Office of Nuclear Reactor Regulation
References
NUDOCS 8806280382
Download: ML20195H790 (1)


Text

"

l CFITIFICATION #P389 790 237 t

I STATE OF RHODE ISLAND AND PROVIDENCE PLANTATIONS l

! Rhode Island Atomic Energy Commission NUCLEAR SCIENCE CENTER South Ferry Road Narragansett, R.I. 02882-1197 June 23, 1988 Director Standardization and Non-Power Reactor Project Directorate Division of Reactor Projects III, IV, V and Special Projects Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, DC 20555 License R-95 Docket 50-193 Attn: Mr. Theodore Michaels

Dear Sir:

Subject:

High to Low-Enriched Uranium Application It is hereby requested that the date for submission of the low enriched uranium conversion application be extended from July 5, 1988 to March 6, 1989. While the staff of the Rhode Island Nuclear Science Center with major input from the RERTR staff at Argonne National Laboratory is working diligently to prepare the information for the safety analysis report, this extension is required because of the work which still remains for selection and validation of a low enriched core for this facility. The details of this were discussed with Mr. T. Michaels at a meeting in Washington on May 25, 1988.

This extension will not require the fabrication of HEU fuel as the fuel on hand is sufficient for operation.until'the LEU fuel

, is operational. In this regard, the Department of Energy has informed us that the contract for fuel fabrication for this facility will be issued after October 1989 with fabrication taking place in early 1990.

Thank you for your consideration.

Very truly yours, r

\ .

W 01 O A. Er cis DiMeglio 1 Director i 1 0 AFD:cd 8806280382 880623 PDR ADOCK 05000193  ;.

p DCD u