Category:CORRESPONDENCE-LETTERS
MONTHYEARTXX-9924, Forwards Responses to Questions by NRC Re Application for Amends to Licenses NPF-87 & NPF-89,by Incorporating Changes Increasing RWST low-level Setpoint from Greater than But Equal to 40% to Greater than But Equal to 45% of Span1999-10-22022 October 1999 Forwards Responses to Questions by NRC Re Application for Amends to Licenses NPF-87 & NPF-89,by Incorporating Changes Increasing RWST low-level Setpoint from Greater than But Equal to 40% to Greater than But Equal to 45% of Span ML20217M5711999-10-20020 October 1999 Forwards Insp Repts 50-445/99-15 & 50-446/99-15 on 990822- 1002.Two Severity Level IV Violations of NRC Requirements Identified & Being Treated as non-cited Violations Consistent with App C of Enforcement Policy TXX-9923, Forwards Monthly Operating Repts for Sept 1999 for CPSES, Units 1 & 2,per Plant TS 5.6.4.No Failures of Challenges to PORVs of SV for Units Occurred1999-10-15015 October 1999 Forwards Monthly Operating Repts for Sept 1999 for CPSES, Units 1 & 2,per Plant TS 5.6.4.No Failures of Challenges to PORVs of SV for Units Occurred ML20217E7951999-10-12012 October 1999 Forwards COLR for Unit 1,Cycle 8,per TS 5.6.5 ML20212L2891999-10-0101 October 1999 Discusses Closeout of GL 97-06, Degradation of Steam Generator Internals. Purpose of GL Was to Obtain Info That Would Enable NRC to Verify That Condition of Licensee SG Internals Comply with Current Licensing Bases TXX-9922, Forwards Revised COLR, for Cycle 5 for Unit 21999-10-0101 October 1999 Forwards Revised COLR, for Cycle 5 for Unit 2 ML20216J5571999-10-0101 October 1999 Provides Final Response to GL 98-01,suppl 1, Y2K Readiness of Computer Sys at Npps ML20212G0721999-09-24024 September 1999 Forwards Rev 4 to Augmented Inservice Insp Plan for CPSES, Unit 1. Future Changes & Revs to Unit 1 Augmented Inservice Insp Plan Will Be Available on Site ML20212H0461999-09-24024 September 1999 Forwards Rev 6 to CPSES Glen Rose,Tx ASME Section XI ISI Program Plan for 1st Interval on 990820 ML20212F7481999-09-24024 September 1999 Forwards SER Authorizing Relief from Exam Requirement of 1986 Edition ASME Code,Section XI Pursuant to 10CFR50.55a(a)(3)(ii) for Relief Request A-3 & 10CFR50.55a(g)(6)(i) for Relief Requests B15,16,17 & C-4 ML20212F1041999-09-23023 September 1999 Requests That NRC Be Informed of Any Changes in Scope of Y2K System Deficiencies Listed or Util Projected Completion Schedule for Comanche Peak Steam Electric Station,Units 1 & 2 ML20212E6661999-09-21021 September 1999 Advises That Info Contained in Application & Affidavit, (CAW-99-1342) Re WCAP-15009,Rev 0, Comache Peak Unit 1 Evaluation for Tube Vibration Induced Fatigue, Will Be Withheld from Public Disclosure ML20212D9111999-09-16016 September 1999 Informs That on 990818,NRC Completed Midcycle PPR of CPSES & Did Not Identify Any Areas in Which Performance Warranted Insp Beyond Core Insp Program.Core Insp Plan at Facility Over Next 7 Months.Insp Plan Through March 2000 Encl ML20212A7601999-09-14014 September 1999 Forwards Insp Repts 50-445/99-14 & 50-446/99-14 on 990707-0821.Four Violations Occurred & Being Treated as Ncvs.Conduct of Activities Was Generally Characterized by safety-conscious Operations & Sound Radiological Controls TXX-9921, Suppls 981221 LAR 98-010 to Licenses NPF-87 & NPF-89, Clarfying Conditions of Use Re Analytical Methods Used to Determine Core Operating Limits,Per Telcon with NRC1999-09-10010 September 1999 Suppls 981221 LAR 98-010 to Licenses NPF-87 & NPF-89, Clarfying Conditions of Use Re Analytical Methods Used to Determine Core Operating Limits,Per Telcon with NRC ML20211P3761999-09-0707 September 1999 Ack Receipt of Ltr Dtd 990615,transmitting Rev 30 to Physical Security Plan,Per 10CFR50.54(p).No NRC Approval Is Required ML20211L9871999-09-0303 September 1999 Forwards Rev 31 to Technical Requirements Manual. All Changes Applicable to Plants Have Been Reviewed Under Util 10CFR50.59 Process & Found Not to Include Any USQs TXX-9915, Responds to 990701 & 0825 RAI Telcons Re Spent Fuel Pool Temp,Per LAR 98-008,which Requested Increase in Spent Fuel Storage capacity.Marked-up Page 4-1 of CPSES Fuel Storage Licensing Rept, Encl1999-09-0303 September 1999 Responds to 990701 & 0825 RAI Telcons Re Spent Fuel Pool Temp,Per LAR 98-008,which Requested Increase in Spent Fuel Storage capacity.Marked-up Page 4-1 of CPSES Fuel Storage Licensing Rept, Encl ML20211K2231999-08-31031 August 1999 Forwards Txu Electric Comments of Rvid,Version 2 ML20211J3801999-08-27027 August 1999 Forwards Corrected TS Page 3.8-26 to Amend 66 to Licenses NPF-87 & NPF-89,respectively.Footnote on TS Page 3.8-26 Incorrectly Deleted ML20211G7301999-08-26026 August 1999 Forwards Revs 29 & 30 to CPSES Technical Requirements Manual (Trm). Attachments 1 & 2 Contain Description of Changes for Revs 29 & 30 Respectively ML20211G1081999-08-26026 August 1999 Responds to NRR Staff RAI Re Util Mar 1999 Submittal for NRC Review & Approval of Changes to CPSES Emergency Classification Procedure ML20211G3441999-08-25025 August 1999 Forwards Response to NRC RAI on LAR 98-010 for Cpses,Units 1 & 2.Communication Contains No New Licensing Commitments Re Cpses,Units 1 & 2 ML20211B2861999-08-18018 August 1999 Forwards Insp Repts 50-445/99-13 & 50-446/99-13 on 990720- 23.No Violations Noted.Insp Included Implementation of Licensee Emergency Plan & Procedures During Util Biennial Emergency Preparedness Exercise ML20211C4661999-08-18018 August 1999 Discusses Proprietary Info Re Thermo-Lag.NRC Treated Bisco Test Rept 748-105 as Proprietary & Withheld It from Public Disclosure,Iaw 10CFR2.790 ML20210U3981999-08-17017 August 1999 Forwards Monthly Operating Repts for July 1999 for CPSES, Units 1 & 2,per TS 6.9.1.5.No Failures or Challenges to PORVs or SVs for Plant Occurred ML20211C0991999-08-17017 August 1999 Forwards Rev 3 to ASME Section XI ISI Program Plan,Unit 2 - 1st Interval, Replacing Rev 2 in Entirety ML20211C4571999-08-16016 August 1999 Forwards Omitted Subj Page of Contractor TER TXX-9919, Forwards Relief Request A-3,Rev 1 to Unit 1 ISI Program,Per Conversations Between NRC & Txu Electric on 9908021999-08-16016 August 1999 Forwards Relief Request A-3,Rev 1 to Unit 1 ISI Program,Per Conversations Between NRC & Txu Electric on 990802 ML20210R6561999-08-13013 August 1999 Forwards Response to NRR 990805 Telcon RAI Re License Amend Request 98-010,to Increase Power for Operation of CPSES Unit 2 to 3445 Mwth & Incorporating Addl Changes Into Units 1 & 2 TS ML20211A9501999-08-12012 August 1999 Discusses 990720-21 Workshop Conducted in Region IV Ofc,Re Exchange of Info in Area of Use of Risk Insights in Regulatory Activities.List of Attendees,Summary of Topic & Issues,Agenda & Copies of Handouts Encl ML20210S6411999-08-12012 August 1999 Informs That Wg Guldemond,License SOP-43780,is No Longer Performing Licensed Duties.Discontinuation of License Is Requested ML20210R2221999-08-12012 August 1999 Forwards Insp Repts 50-445/99-10 & 50-446/99-10 on 990510-0628.Violations Noted & Being Treated as Ncvs, Consistent with App C of Enforcement Policy ML20210N1101999-08-0404 August 1999 Provides Supplemental Info to Util 990623 License Amend Request 99-005 Re Bypassing DG Trips.Info Replaces Info Contained in Subject Submittal in Attachment 2,Section II, Description of TS Change Request ML20210L1461999-08-0303 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Requests Submittal of Ltr Identifying Individuals Taking Exam,Personnel Allowed Access to Exams & Mailing Address for Exams ML20210J2301999-08-0202 August 1999 Forwards Amend 96 to CPSES Ufsar.Replacement of FSAR Figures with Plant Process Flow Diagrams Meets Intent & Requirements of NRC Reg Guide 1.70,Rev 2 ML20210J6071999-08-0202 August 1999 Forwards line-by-line Descriptions of Changes in Amend 96 to CPSES UFSAR Transmitted by Util Ltr TXX-99166,dtd 990802. Replacment of FSAR Figures with Plant Process Flow Diagrams Meets Intent & Requirements of NRC Reg Guide 1.70,rev 2 TXX-9916, Notifies NRC That CPSES Units 1 & 2,improved TS Implemented on 9907271999-08-0202 August 1999 Notifies NRC That CPSES Units 1 & 2,improved TS Implemented on 990727 TXX-9918, Forwards CPSES 10CFR50.59 Evaluation Summary Rept 0008,for 970802-990201 & CPSES Commitment Matl Change Evaluation Rept 0003,for 970802-9906301999-08-0202 August 1999 Forwards CPSES 10CFR50.59 Evaluation Summary Rept 0008,for 970802-990201 & CPSES Commitment Matl Change Evaluation Rept 0003,for 970802-990630 ML20210K2321999-07-29029 July 1999 Forwards Insp Repts 50-445/99-12 & 50-446/99-12 on 990530-0710.No Violations Noted ML20210G5861999-07-29029 July 1999 Forwards fitness-for-duty Program Performance Data for Six Month Period of Jan-June 1999 ML20210J0121999-07-27027 July 1999 Forwards Summary of Methodology for Determination of NDE Measurement Uncertainty,In Response to Recent Discussions with NRC Re LAR 98-006 Concerning Rev to SG Tube Plugging Criteria TXX-9917, Provides Info Re Augmented Inservice Insp Plan,Which Requires Periodic Insp of Rv Head & Internals Lifting Devices at CPSES1999-07-26026 July 1999 Provides Info Re Augmented Inservice Insp Plan,Which Requires Periodic Insp of Rv Head & Internals Lifting Devices at CPSES ML20210F3121999-07-26026 July 1999 Responds to GL 99-02, Laboratory Testing of Nuclear-Grade Activated Charcoal, ML20210D8231999-07-23023 July 1999 Forwards Safety Evaluation of Relief Requests Re Use of 1998 Edition of Subsections IWE & Iwl of ASME Code for Containment Insp ML20210D3211999-07-21021 July 1999 Provides List of Estimates of Licensing Actions,In Response to Administrative Ltr 99-02,dtd 990603 ML20210C2931999-07-21021 July 1999 Supplements 880323 Response to NRC Bulletin 88-02, Rapidly Propagating...Sg Tubes, Non-proprietary WCAP-15010 & Proprietary Rev 0 to WCAP-15009, CP Unit 1 Evaluation for Tube Vibration... Encl.Proprietary Rept Withheld ML20209H0111999-07-16016 July 1999 Forwards Relief Request C-4 to CPSES Unit 2 ISI Program for Approval ML20210C3331999-07-16016 July 1999 Forwards Exam Repts 50-445/99-301 & 50-446/99-301 on 990618- 24.Exam Included Evaluation of Six Applicants for Senior Operator Licenses ML20209H2551999-07-16016 July 1999 Forwards ISI Summary Rept for Fourth Refueling Outage of CPSES Unit 2 & Containment ISI Summary Rept for Fourth Refueling Outage of CPSES Unit 2,per ASME Boiler & Pressure Vessel Code,Section Xi,Paragraph IWA-6230 1999-09-07
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARTXX-9924, Forwards Responses to Questions by NRC Re Application for Amends to Licenses NPF-87 & NPF-89,by Incorporating Changes Increasing RWST low-level Setpoint from Greater than But Equal to 40% to Greater than But Equal to 45% of Span1999-10-22022 October 1999 Forwards Responses to Questions by NRC Re Application for Amends to Licenses NPF-87 & NPF-89,by Incorporating Changes Increasing RWST low-level Setpoint from Greater than But Equal to 40% to Greater than But Equal to 45% of Span TXX-9923, Forwards Monthly Operating Repts for Sept 1999 for CPSES, Units 1 & 2,per Plant TS 5.6.4.No Failures of Challenges to PORVs of SV for Units Occurred1999-10-15015 October 1999 Forwards Monthly Operating Repts for Sept 1999 for CPSES, Units 1 & 2,per Plant TS 5.6.4.No Failures of Challenges to PORVs of SV for Units Occurred ML20217E7951999-10-12012 October 1999 Forwards COLR for Unit 1,Cycle 8,per TS 5.6.5 ML20216J5571999-10-0101 October 1999 Provides Final Response to GL 98-01,suppl 1, Y2K Readiness of Computer Sys at Npps TXX-9922, Forwards Revised COLR, for Cycle 5 for Unit 21999-10-0101 October 1999 Forwards Revised COLR, for Cycle 5 for Unit 2 ML20212G0721999-09-24024 September 1999 Forwards Rev 4 to Augmented Inservice Insp Plan for CPSES, Unit 1. Future Changes & Revs to Unit 1 Augmented Inservice Insp Plan Will Be Available on Site ML20212H0461999-09-24024 September 1999 Forwards Rev 6 to CPSES Glen Rose,Tx ASME Section XI ISI Program Plan for 1st Interval on 990820 TXX-9921, Suppls 981221 LAR 98-010 to Licenses NPF-87 & NPF-89, Clarfying Conditions of Use Re Analytical Methods Used to Determine Core Operating Limits,Per Telcon with NRC1999-09-10010 September 1999 Suppls 981221 LAR 98-010 to Licenses NPF-87 & NPF-89, Clarfying Conditions of Use Re Analytical Methods Used to Determine Core Operating Limits,Per Telcon with NRC ML20211L9871999-09-0303 September 1999 Forwards Rev 31 to Technical Requirements Manual. All Changes Applicable to Plants Have Been Reviewed Under Util 10CFR50.59 Process & Found Not to Include Any USQs TXX-9915, Responds to 990701 & 0825 RAI Telcons Re Spent Fuel Pool Temp,Per LAR 98-008,which Requested Increase in Spent Fuel Storage capacity.Marked-up Page 4-1 of CPSES Fuel Storage Licensing Rept, Encl1999-09-0303 September 1999 Responds to 990701 & 0825 RAI Telcons Re Spent Fuel Pool Temp,Per LAR 98-008,which Requested Increase in Spent Fuel Storage capacity.Marked-up Page 4-1 of CPSES Fuel Storage Licensing Rept, Encl ML20211K2231999-08-31031 August 1999 Forwards Txu Electric Comments of Rvid,Version 2 ML20211G1081999-08-26026 August 1999 Responds to NRR Staff RAI Re Util Mar 1999 Submittal for NRC Review & Approval of Changes to CPSES Emergency Classification Procedure ML20211G7301999-08-26026 August 1999 Forwards Revs 29 & 30 to CPSES Technical Requirements Manual (Trm). Attachments 1 & 2 Contain Description of Changes for Revs 29 & 30 Respectively ML20211G3441999-08-25025 August 1999 Forwards Response to NRC RAI on LAR 98-010 for Cpses,Units 1 & 2.Communication Contains No New Licensing Commitments Re Cpses,Units 1 & 2 ML20210U3981999-08-17017 August 1999 Forwards Monthly Operating Repts for July 1999 for CPSES, Units 1 & 2,per TS 6.9.1.5.No Failures or Challenges to PORVs or SVs for Plant Occurred ML20211C0991999-08-17017 August 1999 Forwards Rev 3 to ASME Section XI ISI Program Plan,Unit 2 - 1st Interval, Replacing Rev 2 in Entirety TXX-9919, Forwards Relief Request A-3,Rev 1 to Unit 1 ISI Program,Per Conversations Between NRC & Txu Electric on 9908021999-08-16016 August 1999 Forwards Relief Request A-3,Rev 1 to Unit 1 ISI Program,Per Conversations Between NRC & Txu Electric on 990802 ML20210R6561999-08-13013 August 1999 Forwards Response to NRR 990805 Telcon RAI Re License Amend Request 98-010,to Increase Power for Operation of CPSES Unit 2 to 3445 Mwth & Incorporating Addl Changes Into Units 1 & 2 TS ML20210S6411999-08-12012 August 1999 Informs That Wg Guldemond,License SOP-43780,is No Longer Performing Licensed Duties.Discontinuation of License Is Requested ML20210N1101999-08-0404 August 1999 Provides Supplemental Info to Util 990623 License Amend Request 99-005 Re Bypassing DG Trips.Info Replaces Info Contained in Subject Submittal in Attachment 2,Section II, Description of TS Change Request TXX-9918, Forwards CPSES 10CFR50.59 Evaluation Summary Rept 0008,for 970802-990201 & CPSES Commitment Matl Change Evaluation Rept 0003,for 970802-9906301999-08-0202 August 1999 Forwards CPSES 10CFR50.59 Evaluation Summary Rept 0008,for 970802-990201 & CPSES Commitment Matl Change Evaluation Rept 0003,for 970802-990630 ML20210J2301999-08-0202 August 1999 Forwards Amend 96 to CPSES Ufsar.Replacement of FSAR Figures with Plant Process Flow Diagrams Meets Intent & Requirements of NRC Reg Guide 1.70,Rev 2 ML20210J6071999-08-0202 August 1999 Forwards line-by-line Descriptions of Changes in Amend 96 to CPSES UFSAR Transmitted by Util Ltr TXX-99166,dtd 990802. Replacment of FSAR Figures with Plant Process Flow Diagrams Meets Intent & Requirements of NRC Reg Guide 1.70,rev 2 TXX-9916, Notifies NRC That CPSES Units 1 & 2,improved TS Implemented on 9907271999-08-0202 August 1999 Notifies NRC That CPSES Units 1 & 2,improved TS Implemented on 990727 ML20210G5861999-07-29029 July 1999 Forwards fitness-for-duty Program Performance Data for Six Month Period of Jan-June 1999 ML20210J0121999-07-27027 July 1999 Forwards Summary of Methodology for Determination of NDE Measurement Uncertainty,In Response to Recent Discussions with NRC Re LAR 98-006 Concerning Rev to SG Tube Plugging Criteria TXX-9917, Provides Info Re Augmented Inservice Insp Plan,Which Requires Periodic Insp of Rv Head & Internals Lifting Devices at CPSES1999-07-26026 July 1999 Provides Info Re Augmented Inservice Insp Plan,Which Requires Periodic Insp of Rv Head & Internals Lifting Devices at CPSES ML20210F3121999-07-26026 July 1999 Responds to GL 99-02, Laboratory Testing of Nuclear-Grade Activated Charcoal, ML20210C2931999-07-21021 July 1999 Supplements 880323 Response to NRC Bulletin 88-02, Rapidly Propagating...Sg Tubes, Non-proprietary WCAP-15010 & Proprietary Rev 0 to WCAP-15009, CP Unit 1 Evaluation for Tube Vibration... Encl.Proprietary Rept Withheld ML20210D3211999-07-21021 July 1999 Provides List of Estimates of Licensing Actions,In Response to Administrative Ltr 99-02,dtd 990603 ML20209H2551999-07-16016 July 1999 Forwards ISI Summary Rept for Fourth Refueling Outage of CPSES Unit 2 & Containment ISI Summary Rept for Fourth Refueling Outage of CPSES Unit 2,per ASME Boiler & Pressure Vessel Code,Section Xi,Paragraph IWA-6230 ML20209H0111999-07-16016 July 1999 Forwards Relief Request C-4 to CPSES Unit 2 ISI Program for Approval ML20209G0721999-07-13013 July 1999 Forwards Monthly Operating Repts for June 1999 for CPSES, Units 1 & 2,per TS 6.9.1.5.No Failures or Challenges to PORVs of SV Occurred During Reporting Period ML20209F0681999-07-0909 July 1999 Informs That Effective 990514,TU Electric Formally Changed Name to Txu Electric.Change All Refs of TU Electric to Txu Electric on Correspondence Distribution Lists ML20209E0421999-07-0909 July 1999 Forwards Response to NRC Request for Addl Info on LAR 98-010.Attachment 1 Is Affidavit for Info Supporting LAR 98-010 ML20209B6021999-06-30030 June 1999 Submits Second Response to NRC GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Npps. Readiness Disclosure for Reporting Status of Facility Y2K Readiness Encl ML20195J6981999-06-15015 June 1999 Provides Addl Info Related to Open Issue,Discussed in 990610 Conference Call with D Jaffe Re ISI Program Relief Request L-1 Submitted by Util on 980220 ML20196A4921999-06-15015 June 1999 Forwards Rev 30 to Physical Security Plan.Rev Withheld,Per 10CFR73.21 ML20195J0491999-06-14014 June 1999 Submits Response to RAI Re Implementation of 1.0 Volt Repair Criteria ML20195J0651999-06-14014 June 1999 Submits Response to RAI Re GL 95-07, Pressure Locking & Thermal Binding of Safety Related Power Operated Gate Valves 05000445/LER-1999-001, Forwards LER 99-001-00, Some Electrical Contacts for RCS Pressure Relief Valves Were Not Included in Surveillance Testing Procedures. New Licensing Commitments Identified in Attachment 11999-06-0808 June 1999 Forwards LER 99-001-00, Some Electrical Contacts for RCS Pressure Relief Valves Were Not Included in Surveillance Testing Procedures. New Licensing Commitments Identified in Attachment 1 ML20195F0091999-06-0808 June 1999 Forwards Response to RAI Re Units 1 & 2 ISI Program for Relief Requests E-1 & L-1.Communication Contains No New Licensing Basis Commitments Re Cpses,Units 1 & 2 ML20207E1921999-05-28028 May 1999 Submits Updated Request for NRC Staff to Review & Approve Certain Changes to CPSES Emergency Plan Submitted in 981015 & s Prior to Changes Being Implemented at CPSES ML20207E1711999-05-28028 May 1999 Supplements 990526 LAR 99-004 as TU Electric Believes Extingency Exists in That Proposed Amend Was Result of NOED Granted to Prevent Shudown of CPSES Unit 1 ML20207D9841999-05-26026 May 1999 Requests That NRC Exercise Enforcement Discretion to Allow Cpses,Unit 1 to Remain in Mode 1,power Operation,Without Having Performed Svc Test,Per SR 4.8.2.1d on Unit 1 Battery BT1ED2 ML20195B6351999-05-25025 May 1999 Submits Response to RAI Re GL 95-07, Pressure Locking & Thermal Binding of Safety Related Power Operated Gate Valves TXX-9912, Forwards Txu Electric (Formerly TU Electric) CPSES Emergency Preparedness Exercise Scenario Manual for 990721-22,Graded Exercise1999-05-21021 May 1999 Forwards Txu Electric (Formerly TU Electric) CPSES Emergency Preparedness Exercise Scenario Manual for 990721-22,Graded Exercise ML20206U1981999-05-20020 May 1999 Forwards Form 10K Annual Rept,Per 10CFR50.71(b). Communication Contains No New Licensing Basis Commitments Re Cpses,Units 1 & 2 ML20196L1931999-05-20020 May 1999 Forwards MOR for Apr 1999 for Cpses,Units 1 & 2.During Reporting Period There Have Been No Failures or Challenges to Power Operated Relief Valves or Safety Valves TXX-9911, Forwards non-proprietary & Proprietary Responses to RAI Re LAR 98-010 by Incorporating Attached Changes Into CPSES Unit 2 OL NPF-89 & CPSES Units 1,OL NPF-87 & 2 TS to Increase Licensed Power.W & Caldon Proprietary Responses Withheld1999-05-14014 May 1999 Forwards non-proprietary & Proprietary Responses to RAI Re LAR 98-010 by Incorporating Attached Changes Into CPSES Unit 2 OL NPF-89 & CPSES Units 1,OL NPF-87 & 2 TS to Increase Licensed Power.W & Caldon Proprietary Responses Withheld 1999-09-03
[Table view] Category:LEGAL/LAW FIRM TO NRC
MONTHYEARML20055E2741990-05-0101 May 1990 FOIA Request for Investigation Rept 4-89-008 ML20042E3291990-04-10010 April 1990 Advises That Due to Clerical Error,Author Ltrs to NRC Re Insp Repts 50-445/90-05 & 50-446/90-05 Not Served.Repts Will Be Served to All Parties on Attached List ML20042E3311990-03-31031 March 1990 Advises That Open Issues Re Thermo-Lag Insulation Matl & Harassment & Intimidation of QC Inspector Not Addressed in Insp Repts 50-445/90-05 & 50-446/90-05.CASE Questions Whether Formulas to Mfg Thermo-Lag Changed ML20042E3351990-03-28028 March 1990 Requests Listed Info or Basis for Specific Action Re C Grimes 900208 Ltr to J Cahill Re Issuance of License NPF-28,specifically Why Temporary Exemption from Schedular Requirements Granted ML20042E4301990-03-26026 March 1990 Lists Questions Based on Review of Insp Repts 50-445/89-88, 50-446/89-88,50-445/88-88 & 50-446/88-88,including Contamination Problems Found Inside Namco Switches in 1989 & Aircom Fasteners ML20043B7341990-03-0202 March 1990 FOIA Request for Records Re Insp Performed by C Williams on 900207-0302 Concerning ASME Section III Compliance Review & Weld 12A ML20011F0091990-02-0808 February 1990 Certifies That Util Covered for Decontamination Liability & Excess Property Insurance,Effective on 900208 ML20012D6361990-02-0505 February 1990 Responds to Util 891221 Ltr to NRC Re thermo-lag Dispute ML20012D5951990-02-0505 February 1990 FOIA Request for Documents & Records Relevant to & Generated in Connection W/Insp Repts 50-445/90-05 & 50-446/90-05 on 900131 Re Therm-o-Lag Issues ML20005G5381990-01-10010 January 1990 Urges Resolution of Issues in Dispute & Matters of Concern to Case Prior to Fuel Load Decision.Issues Include, Auxiliary Feedwater Check Valve & Pending Enforcement Action & Station Svc Water Sys Enforcement Action ML20005G5481990-01-0909 January 1990 Forwards Analytical Evaluation of Station Svc Water Sys for Facilities by Case Consultant J Doyle Dtd 891231.Rept Submitted to Document Events Re Removal of Plastite Liner in Station Svc Water Sys in Spring 1988 ML19354D7631990-01-0909 January 1990 Forwards Rev 0 to Case Final Rept, Analytical Evaluation of Station Svc Water Sys,Comanche Peak Nuclear Power Station. Rept Contains Conclusions Applicable to Issues of Regulatory Character & Competence of Util to Manage & Operate Plant ML20005G6951990-01-0909 January 1990 Corrected Ltr Discussing K Doyle Rept, Analytical Evaluation of Station Svc Water Sys for Comanche Peak. Rept Concludes That Probable Cause of Failures of Sys Due to Inability of Util Personnel to Perform Accurate Analysis ML20005G6751989-12-12012 December 1989 FOIA Request for Documents Re Insp Repts 50-445/89-23 & 50-446/89-23 on 890405-0502 ML20006B8811989-12-0505 December 1989 Appeals Denial of FOIA Request for App B Records ML19332F4911989-12-0101 December 1989 Discusses NRC 891027 Ltr to B Brink Re Citizens for Fair Util Regulation 891016 Request for Stay.Nrc Must Be Consistent in Application of NRC Procedures Re Probing of Allegations.Improprietaries Should Be Sought from Case ML20005G5441989-11-29029 November 1989 Requests That NRC Independently Conduct Insp/Investigation of Dispute Between Case & Util Re Thermo-Lag & Thermo Science,Inc Qc/Qa Breakdown.Util 891116 Ltr to Case Re Results of Investigation of Inspector a Concerns Encl ML20011D1221989-11-20020 November 1989 Discusses Concerns Re Integrity of Regulatory Process as Affecting Plant ML19332D7371989-10-0606 October 1989 FOIA Request for Records Re Chronology of Events Beginning 1985 ML19332F3141989-09-27027 September 1989 FOIA Request for Documents Re 890908 Insp Repts 50-445/89-38 & 50-446/89-38 ML20247R0381989-09-23023 September 1989 Advises of Case Position Re Need for Regulatory Enforcement Action in Response to Mgt Process & Administrative Control Failures Evidenced by 890505 Event at Facility ML20248C2711989-09-23023 September 1989 Requests Reclassification of Violations Noted in Insp Rept 50-445/88-47 & 50-446/88-42 on 880707-0802.Informs Case Believes Further Insp & Enforcement Review Appropriate ML20245J9341989-06-30030 June 1989 Forwards Util Response to Cap Rock Electric Cooperative,Inc Request for Order Modifying Antitrust License Conditions ML20248D6571989-06-16016 June 1989 Ofc of Inverstigations Subpoena to Jj Macktal,Nrc Investigation 4-89-008.* Requests Leave of 5 Days to Respond to Request Filed for Enforcement of Subpoena & to Brief Commission on Issues Re Subpoena ML20246K3781989-05-22022 May 1989 Requests Status of NRC Determination of Pending Fee Waiver Requests for FOIAs 89-47 & 89-52 ML20245A0381989-05-12012 May 1989 Forwards Request from Cap Rock Electric Cooperative,Inc for Order Enforcing & Modifying Antitrust License Conditions & Certificate of Svc.W/O Request ML20244D8701989-04-0606 April 1989 Forwards Endorsement 27 to Nelia NF-274 ML20246K3621989-03-30030 March 1989 Responds to Responding to Appeal of Denial of Fee Waivers for 890301 FOIA Requests.Justification for Fee Waiver Provided ML20246K3401989-03-0101 March 1989 Appeals Denial of Two Requests for Fee Waivers Re FOIAs 89-47 & 89-52 on Behalf of Jj Macktal & SM Hasan.Purpose of Requests to Examine Process Utilized by EDO & NRC for Revoking Confidentiality of Allegers ML20244D8771989-01-26026 January 1989 FOIA Request for Records Re Settlement Negotiations & Agreements in Licensing Proceedings Effectuated During Jul 1988 ML20246K2061989-01-25025 January 1989 FOIA Request for Records Re Revocation of Confidentiality on 890123 by V Stello & Requests for Info by Third Parties Which Concerns SM Hasan or Jj Macktal &/Or Respective Allegations About Facility ML20205D1401988-10-14014 October 1988 Forwards State of Tx Public Utils Commission Substantive Rule 23.66 Re Wheeling for Cogenerators ML20151U5971988-08-0808 August 1988 Requests Withdrawal of Portion of 860131 Filing Re Case Request for Imposition of Fine,For Suspension of Const Activities & for Hearing on Application to Renew CP ML20150E1411988-07-12012 July 1988 Forwards Suppl Filing of Response of Applicant to Motions to Stay,To Intervene & for Sua Sponte Relief Filed by Various Parties ML20150E2061988-07-10010 July 1988 Clarifies Relevant Issues Raised in LC Clark Re Recent Filings by J Doe.W/Supporting Info & Certificate of Svc ML20150D5031988-07-0808 July 1988 Forwards Motions to Intervene & for Sua Sponte Filed on Behalf of Citizens for Fair Util Regulation & Individual Residents ML20150D5091988-07-0707 July 1988 Forwards Substitute Pleadings of Petitioner J Doe ML20150D5261988-07-0606 July 1988 Forwards Motion for Permission to Withdraw Pleadings W/O Prejudice & W/Leave to File Substitute Pleadings within 48 H ML20151Y6221988-04-29029 April 1988 Forwards Wg Counsil Transmitting Errata to Project Status Repts for Mechanical Suppl a - Sys Interaction & Mechanical Suppl B - Fire Protection. Related Correspondence ML20151T7141988-04-26026 April 1988 Forwards Applicants Answers to Board 14 Questions Re Action Plan Results Rept VII.a.9.Checklists Used for Reinsp/ Documentation Review for 81 Items of Equipment & Matl Not Included W/Answers Due to Vol Amounting More than 1,000 Pp ML20151E9771988-04-0808 April 1988 Informs That Applicants Notified Board & Parties of Availability in TU Electric Document Room of Matls Ref in NRC Sser 14.W/Certificate of Svc ML20148M0221988-03-30030 March 1988 Forwards Exhibit 18 Introduced to Record by Counsel for co-owners During Williams 880218 Deposition & Pages 190-195 & 464-465 of Transcript,Representing Entire Contents of Deposition Re Exhibit.W/Certificate of Svc ML20148K3681988-03-24024 March 1988 Forwards Excerpts from Form 10-K Filed by Util W/Security & Exchange Commission.Excerpts Contain Financial Disclosures Re Facility.Info Provided to Keep Board Apprised of Matters Re Facility ML20150D0151988-03-21021 March 1988 Forwards Transcripts of Meeting Held on 871217-18 & 880218 Between Case & Util.W/O Encl.W/Certificate of Svc ML20150D0201988-03-18018 March 1988 Informs That on 880314,CASE Filed Tenth Progress Rept W/ Board & Urged Board to Review Transcript of Public Meetings Held Between Case & Applicants in Which Walsh/Doyle Issues Discussed.W/Certificate of Svc.Related Correspondence ML20148G1411988-03-17017 March 1988 Forwards Ltr of Even Date from Util to NRC Which Transmits Copies of Errata Prepared for Project Status Rept Re Cable Tray & Cable Tray Hangers & Conduit Supports Train C 2 Inch Diameter & Less ML20150D0381988-03-14014 March 1988 Forwards Util Informing That Licensee Still Collecting Documents for Files Containing Documentation for Result Rept VII.a.9 ML20196D5001988-02-0808 February 1988 Forwards Wg Counsil Transmitting Project Status Rept for Civil/Structural, Rev 0.Related Correspondence ML20195J0621988-01-15015 January 1988 Forwards Wg Counsil to Nrc,Transmitting Project Rept for Electrical, Rev 0.Rept Also Sent to J Ellis & Cygna.Related Correspondence ML20147D5771988-01-14014 January 1988 Forwards Util Form 8-K,current Repts, & 1214,filed W/Securities & Exchange Commission.Documents Forwarded as Part of Parties Efforts to Keep Board Apprised to Matters Re Facility.Related Correspondence 1990-05-01
[Table view] |
Text
i K@ ceurto coaass.qqs s
WORSHAM, FORSYTHE, S AMg WOOLDRIDGE THIRTV Two MunORED.2006 8@gwCR O
E U"w'OOLORi oO E DAuAs, Texas 75201 9." ".Q.""
NEIL O. ANDERSON = -
NA oM ANSO TELEPHONE (2
~~
97 031 All:40 OPCOo SE<
J DAN BOMANNAN JOS. IRION WORSM AM TRAVIS E. vANDERPOOL EARL A. FORSVTH E JUDITM R.JOMNSON RsCH ARD L. ADAMS g
7 g ,*E.LI I t hh Y
- +-v-DavtD C. LONERGAN 00CKEilN2 & St9e;g. TELECOPiERazio esO OOes JOHN W. McREYNOLDS 34K]q TMOM A S P. LILLARD ROBERYn wise TIMOYMY A. M ACR ROeERT M. FeLLMORE WM. STEPMEN BOVO M a n et R.WASEM CHRISTOPraCR R. MtLTENF ERGER ROBERT P. OL6vER MAR A SCHWARTZ RICHARD G. MOORE NANCYC L. SETMb REM CECE,,AJ..RoNER July 29,1986 JOE A. DAVIS ERic M. PETERSOW WALTER w. wMITE Peter B. Bloch, Esquire Dr. Kenneth A. McCollom Chairman Administrative Judge Atomic Safety and Licensing Board 1107 West Knapp U. S. Nuclear Regulatory Commission Stillwater, Oklahoma 74075 Washington, D. C. 20555 Elizabeth B. Johnson Dr. Walter H. Jordan Oak Ridge National Laboratory Administrative Judge P. O. Box X, Building 3500 881 West Outer Drive Oak Ridge, Tennessee 37830 Oak Ridge, Tennessee 37830 Re: Texas Utilities Electric Company, et al (Comanche Peak Steam Electric Station, Units 1 & 2); Docket Nos. 50-445 and 50-446 b /_-
Dear Administrative Judges:
For your information, enclosed is a copy of TXX-4922 dated July 23, 1986, from Mr. W. G. Counsil to Mr. V. Noonan. The letter transmits information regarding Appendix E of the CPRT Program Plan as requested by the Staff.
This information is being sent to keep the Board apprised as to matters of possible interest.
Respec lly, Robert A. Wooldridge RAW /kiw Enclosures cc: Service List
%80gg $hp j G
~
i Log # TXX-4922 File # 10068 TEXAS UTILITIES GENERATING COMPAhT SKYWAY TOWER . 400 NORTH OBJVE STREET. L.B. El
- DALLAS. TEXAS 78301 July 23, 1986
- 22"L'A?.?&%
Director of Nuclear Reactor Regulation Attention: Mr. V. S. Noonan, Director Comanche Peak Project Division of Licensing U. S. Nuclear Regulatory Commission Washington, D.C. 20555
SUBJECT:
COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)
DOCKET NOS. 50-445 AND 50-446 REVISION 2 0F APPENDIX E OF THE CPRT PROGRAM PLAN
Dear Mr. Noonan:
As requested, enclosed herewith is the revision bar annotated copy of revision 2 of Appendix E of the CPRT Program Plan. Please replace the copy of the Appendix E transmitted to you by my June 6, 1986, letter with the attached.
Revision 2 of Appendix E was necessitated for the following reasons:
- Ger.eral editing to eliminate repetitious wording.
- Title change to more appropriately reflect what the Appendix addresses.
- Revised definition of QA/QC program deficiency to more precisely describe the criteria that a QA/QC program deviation must satisfy in order to be classified as a deficiency.
- Sections B.5 and 8.6 in Revision 2 were moved forward from Sections C.5 and C.7 in Revision 1, because these sections more appropriately belong in Section B rather than Section C of the appendix.
- Title change of Section C from " Evaluation Process" to
" Follow-up Activities". The new title is a better descriptor of the activities described therein.
- Section D " Closure" was added for completeness.
Should you have any further questions, please contact Mr. John Beck or myself.
Very truly yours,
/ f W. G. Counsil SSP /arh c - J. Ellis A Dl%TSION OF TEXAS UTTIJTTES ELECTEIC COMPANY
i i Ravision: 2
- n. Page 1 of 8 APPENDIX E I
CPRT Procedure For The Resolution Of Discrepancies Identified by the CPRT A. PURPOSE The purpose of this procedure is to provide instructions for the l resolution of discrepancies identified by the CPRT.
The resolution processes described in this Appendix were primarily developed and designed to address discrepancies identified by the CPRT during the implementation of the ISAPs and DSAPs developed for the CPRT self-initiated investigatory efforts. In order to ensure consistency throughout the CPRT program, these processes will also l be applied in the reporting of the results of the CPRT investigatory efforts for ISAPs and portions of DSAPs that were l developed to respond to concerns specifically identified by External Sources.
Additional information related to the development, approval and documentation of corrective actions for all deviations or deficiencies (both specific and programmatic) identified by the CPRT is provided in Appendix H to the CPRT Program Plan.
B. CLASSIFICATION Discrepancies identified by the CPRT are classified into categories of relative significance in order tc determine the appropriate follow-up activities required to resolve and close them.
The following definitions have been established for use in classifying identified discrepancies. The basis for classification of each discrepancy shall be documented.
- 1. Design Adequacy All design discrepancies are classified as observations.
deviations or deficiencies, depending upon whether the design error resulted in a failure to meet design criteria and depending on the safety significance of any failures to meet design criteria. The definitions employed in this area by the CPRT are as follows:
(a) Design Discrepancy Any identified error related to design inputs, implementing documents and outputs for safety-related structures, systems or components that could have an adverse impact on the adequacy of their design.
.--,.._.,._......,_.,,__-...,.-_.-.-..,_.,__,....__-____-~---,,___,.._--..m_ ._,,,.,_,--.__.,,,,_,,.,,_-,-.,.,,,..-,__e-m
--,.-,,_,,y- , _ _ . , - - , . . ,
i Rsvision: 2 Pcg2 2 of 8 j APPENDIX E (Cont'd)
B. CLASSIFICATION (Cont'd)
(b) Design Observation Any identified design discrepancy that has been determined to not constitute a design deviation.
(c) Design Deviation Any identified design discrepancy that has been determined to constitute a verified failure to meet a design commitment or specification. In this regard, design commitments include regulatory requirements, FSAR commitments, other licensing commitments, code commitments or other project-specific design criteria or commitments.
(d) Design Deficiency Any identified design deviation that has been determined to be safety-significant.
(e) Safety-Significant
" Safety 7significant", for purposes of the CPRT Program , is defined to mean that the identified discrepancy, if uncorrected, would result in the loss of capability of the affected system, structure or component to perform its intended safety function. For
- purposes of the CPRT Program, credit is not allowed for redundancy at the component, system, train or structure level.
(f) Programmatic Design Deficiency
\
A set of related design discrepancies that have been determined to constitute an adverse trend that is programmatic in nature.
This definition, which is employed in the CPRT Program for purposes t
of sample expansion, is more restrictive than that usually applied l
to the term " safety-significant" for regulatory purposes or in common parlance, in that it ignores redundancies that do exist in real life. [ Compare 10CFR50, Appendix A (Introduction, " Single Failure"); 10CFR50.55(e)(1) . ] Identification of a deficiency as
" safety-significant" for purposes of the CPRT Program, therefore, is not necessarily equivalent to a statement that, in fact the ,
deficiency, if uncorrected, wculd have resulted in unsafe operation.
mm, w g- y.y-+a,-Y r--~a"P-+--*-+- --
-T-"--"""t'-m"wN'-W""'---v"-v---+"*N*--P-u'--'-'e"-r- 'Twe'-'"w---c^'t--'-- w -M---m '
's--Y F r-em--+-e-m-----------'----MC--m-r-- * - - '--9
Rsvicient 2
- Pcg2 3 of 8 APPENDIX E (Cont'd)
B. CLASSIFICATION (Cont'd)
- 2. Construction Adequacy All construction discrepancies are classified either as deviations or deficiencies, depending upon the safety significance of the discrepancy. The definitions employrd by the CPRT in this area are as follows:
(a) Construction Deviation Any identified discrepancy related to construction or installation of safety-related hardware that has been determined to constitute a verified failure to construct or install a safety-related structure, system or component in accordance with safety-significant attributes and criteria contained in design drawings and specifications or installation procedures /
requirements.
(b) Construction Deficiency Any identified construction deviation that has been determined to be safety-significant.
(c) Safety-Significant See B.I.(e) and associated footnote for definition.
(d) Programmatic Construction Deficiency A set of related construction deviations that has been determined to constitute an adverse trend that is programmatic in nature.
- 3. Testing Program Adequacy All testing discrepancies are classified either as deviations or deficiencies, depending upon the significance of the discrepancy. The definitions employed by the CPRT in this area are as follows:
(a) Testing Deviation Any verified failure to meet a testing program commitment, regulatory requirement or a project specific testing commitment. In this regard, commitments include FSAR commitments and other licensing commitments.
s R2 Vision: 2 Pcg2 4 of 8 APPENDIX E (Cont'd)
L. CLASSIFICATION (Cont'd)
(b) Testing Deficiency Any identified testing deviation that is determined to have resulted in a failure to meet a testing program objective such that ratesting is required to demonstrate that the affected structure, system or component is capable of performing its intended safety function.
(c) Programmatic Testing Deficiency A set of related testing deviations that has been determined to constitute an adverse trend that is programmatic in nature.
- 4. QA/QC Program Adequacy All QA/QC program discrepancies are classified either as deviations or deficiencies, depending upon the significance of the discrepancy. The definitions employed by the CPRT in this area are as follows:
(a) QA/QC Program Deviation Any verified failure of the QA/QC program to meet regulatory requirements ,(f.e., 10CFR50 Appendix B),
FSAR commitments or other licensing commitments.
(b) QA/QC Program Deficiency l
Any identified QA/QC program deviation meeting one or more of the following criteria:
- Inadequacy of a QA/QC program element such that substantive revision of the program or other corrective action is required to bring it into compliance with the regulatory requirements, FSAR commitments or other licensing commitments; or
- Extensive evaluation would be required to determine the effect on the quality of construction.
5 Rsvision: 2
' Page 5 cf 8 APPENDIX E I (Cont'd)
B. CLASSIFICATION (Cont'd)
(c) Programmatic QA/QC Program Deficiency A set of related QA/QC deviations that has been determined to constitute an adverse trend that is programmatic in nature.
- 5. Adverse Trends A trend is a set of related observations and/or deviations having attributes that reflect a' discernible commonality.
Examples of possible commonalities include:
The individual, group of individuals or organization performing the safety-related activity; and
- The program requirements, procedures or controls governing the performance of the safety-related activity.
A trend is considered to be adverse if it is determined that the identified pattern or commonality is likely to have resulted in the occurrence of an undetected deficiency in the affected area, population or stratum.- Adverse trends are also referred to as programmatic deficiencies.
Each trend identified by the CPRT will ha evaluated to determine whether it is adverse (unless it is processed as an ,
unclassified trend). CPRT Review Team Leaders are responsible for performing such evaluations and for making such determinations within their areas of responsibility.
The nature and extent of these evaluations will vary depending upon the nature of the identified trend and the information already available regarding the implications of the trend.
Considerations in this regard include the extent to which:
- The boundaries of the trend have been identified; i
' - The underlying cause and/or contributing causes of the trend have been identified;
- The area, population or stratum affected by the trend has been investigated;
- The potential safety significance of the trend has been identified; and
t Ravisien: 2
) Page 6 of 8 APPENDIX E (Cont'd)
B. CLASSIFICATION (Cont'd)
- Corrective action has already been taken to address the' trend.
The results of these evaluations will be documented and retained in the CPRT working files.
- 6. Unclassified Deviations or Trends As noted in the Program Plan (e.g., Program Plan,Section IV(A), p.14), it may be determined that it is more practical or expeditious, with respect to a given deviation or set of deviations or trend, to proceed directly to analysis of root cause and generic implications and to specification of corrective actions. Where such a determination has been made, performing a safety significance evaluation in respect of the unclassified deviation (s) or an adverse trend analysis in respect of the unclassified trend would serve no purpose and will not be done. Such unclassified deviations or trends will be tracked as deficiencies or adverse trends for purposes of root cause and generic implications analysis and for the purpose of corrective actions. ,
C. FOLLOW-UP ACTIVITIES CPRT followu 'p activities for each classification of discrepancies are listed below. In addition, activities relevant to corrective action shall be accomplished in accordance with Appendix H of the Program Plan.
I In special cases, actions beyond those listed for any given classification may be warranted. For example, it may be considered l
appropriate to assess root cause and generic implications for a particular deviation or (non-adverse) trend. Review Team Leaders are responsible for identifying any such potential special cases to the Senior Review Team. The Senior Review Team in conjunction with the Review Team Leader will determine what additional action is required in such cases.
- 1. (Design) Observations Design observations will be collectively evaluated for the purpose of identifying adverse trend.
t
- 1 Revisient 2 Page 7 of 8 APPENDIX E (Cont'd)
C. FOLLOW-UP ACTIVITIES (Cont'd)
- 2. Deviations All deviations will be transmitted to the CPSES Project for evaluation and disposition in accordance with CPSES Project i procedures for processing nonconformances.
The CPRT will determine (to the extent required by Appendix H) that appropriate corrective action has been defined and accomplished for the non-conformance associated with the deviation.
All deviations within each area of CPRT activities (i.e.,
design, construction, testing, and QA/QC program) will be collectively evaluated for the purpose of identifying adverse trends.
- 3. Deficiencies (Including Unclassified Deviations) -
All deficiencies will be transmitted to the CPSES Project for evaluation and disposition in accordance with CPSES Project procedures for processing nonconformances.
An investigation of the root cause and/or contributing causes for the deficiency will be conducted.
The generic implications of the deficiency will be evaluated.
This evaluation must be of sufficient scope to provide reasonable assurance that there are no remaining undetected deficiencies within the affected area, population or stratum.
Any additional discrepancies that may be identified as a result of the generic implications evaluation will each be j classified and dispositioned in accordance with this Appendix. ,
t In addition, the associated set of such discrep'ancies will be l
- further evaluated for commonalities that may be indicative of ,
j an adverse trend.
The CPRT will determine (to the extent required by Appendix H) that appropriate ccrrective action has been accomplished for the non-conformance associated with the deficiency.
1 The bases for the above-mentioned determinatio'ns will be documented.
- 4. Trends No specific follow-up activities are required for a trend which has not been classified as an adverse trend.
T 4
i R3 vision: 2 Page 8 of 8 APPENDIX E (Cont'd)
C. FOLLOW-UP ACTIVITIES (Cont'd)
- 5. Adverse Trends (Including Unclassified Trends) and Programmatic Deficiencies An investigation of the root cause and/or contributing causes of the trend will be conducted.
The generic implications of the trend will be evaluated. This evaluation must be of sufficient scope to provide reasonable assurance that there are no undetected deficiencies within the affected s.rea, population or stratum.
Appropriate corrective actions for any additional deviations or deficiencies identified during the evaluation of generic implications must be defined.
Appropriate corrective action to preclude recurrence in the future must be defined.
The results of these activities will be documented and retained in the CPRT working files.
D. CLOSURE For the purpose of the third-party effort, each CPRT-identified discrepancy shall be considered closed when the applicable actions of this procedure have been completed and documented.
r