Category:CORRESPONDENCE-LETTERS
MONTHYEARTXX-9924, Forwards Responses to Questions by NRC Re Application for Amends to Licenses NPF-87 & NPF-89,by Incorporating Changes Increasing RWST low-level Setpoint from Greater than But Equal to 40% to Greater than But Equal to 45% of Span1999-10-22022 October 1999 Forwards Responses to Questions by NRC Re Application for Amends to Licenses NPF-87 & NPF-89,by Incorporating Changes Increasing RWST low-level Setpoint from Greater than But Equal to 40% to Greater than But Equal to 45% of Span ML20217M5711999-10-20020 October 1999 Forwards Insp Repts 50-445/99-15 & 50-446/99-15 on 990822- 1002.Two Severity Level IV Violations of NRC Requirements Identified & Being Treated as non-cited Violations Consistent with App C of Enforcement Policy TXX-9923, Forwards Monthly Operating Repts for Sept 1999 for CPSES, Units 1 & 2,per Plant TS 5.6.4.No Failures of Challenges to PORVs of SV for Units Occurred1999-10-15015 October 1999 Forwards Monthly Operating Repts for Sept 1999 for CPSES, Units 1 & 2,per Plant TS 5.6.4.No Failures of Challenges to PORVs of SV for Units Occurred ML20217E7951999-10-12012 October 1999 Forwards COLR for Unit 1,Cycle 8,per TS 5.6.5 ML20212L2891999-10-0101 October 1999 Discusses Closeout of GL 97-06, Degradation of Steam Generator Internals. Purpose of GL Was to Obtain Info That Would Enable NRC to Verify That Condition of Licensee SG Internals Comply with Current Licensing Bases TXX-9922, Forwards Revised COLR, for Cycle 5 for Unit 21999-10-0101 October 1999 Forwards Revised COLR, for Cycle 5 for Unit 2 ML20216J5571999-10-0101 October 1999 Provides Final Response to GL 98-01,suppl 1, Y2K Readiness of Computer Sys at Npps ML20212G0721999-09-24024 September 1999 Forwards Rev 4 to Augmented Inservice Insp Plan for CPSES, Unit 1. Future Changes & Revs to Unit 1 Augmented Inservice Insp Plan Will Be Available on Site ML20212H0461999-09-24024 September 1999 Forwards Rev 6 to CPSES Glen Rose,Tx ASME Section XI ISI Program Plan for 1st Interval on 990820 ML20212F7481999-09-24024 September 1999 Forwards SER Authorizing Relief from Exam Requirement of 1986 Edition ASME Code,Section XI Pursuant to 10CFR50.55a(a)(3)(ii) for Relief Request A-3 & 10CFR50.55a(g)(6)(i) for Relief Requests B15,16,17 & C-4 ML20212F1041999-09-23023 September 1999 Requests That NRC Be Informed of Any Changes in Scope of Y2K System Deficiencies Listed or Util Projected Completion Schedule for Comanche Peak Steam Electric Station,Units 1 & 2 ML20212E6661999-09-21021 September 1999 Advises That Info Contained in Application & Affidavit, (CAW-99-1342) Re WCAP-15009,Rev 0, Comache Peak Unit 1 Evaluation for Tube Vibration Induced Fatigue, Will Be Withheld from Public Disclosure ML20212D9111999-09-16016 September 1999 Informs That on 990818,NRC Completed Midcycle PPR of CPSES & Did Not Identify Any Areas in Which Performance Warranted Insp Beyond Core Insp Program.Core Insp Plan at Facility Over Next 7 Months.Insp Plan Through March 2000 Encl ML20212A7601999-09-14014 September 1999 Forwards Insp Repts 50-445/99-14 & 50-446/99-14 on 990707-0821.Four Violations Occurred & Being Treated as Ncvs.Conduct of Activities Was Generally Characterized by safety-conscious Operations & Sound Radiological Controls TXX-9921, Suppls 981221 LAR 98-010 to Licenses NPF-87 & NPF-89, Clarfying Conditions of Use Re Analytical Methods Used to Determine Core Operating Limits,Per Telcon with NRC1999-09-10010 September 1999 Suppls 981221 LAR 98-010 to Licenses NPF-87 & NPF-89, Clarfying Conditions of Use Re Analytical Methods Used to Determine Core Operating Limits,Per Telcon with NRC ML20211P3761999-09-0707 September 1999 Ack Receipt of Ltr Dtd 990615,transmitting Rev 30 to Physical Security Plan,Per 10CFR50.54(p).No NRC Approval Is Required ML20211L9871999-09-0303 September 1999 Forwards Rev 31 to Technical Requirements Manual. All Changes Applicable to Plants Have Been Reviewed Under Util 10CFR50.59 Process & Found Not to Include Any USQs TXX-9915, Responds to 990701 & 0825 RAI Telcons Re Spent Fuel Pool Temp,Per LAR 98-008,which Requested Increase in Spent Fuel Storage capacity.Marked-up Page 4-1 of CPSES Fuel Storage Licensing Rept, Encl1999-09-0303 September 1999 Responds to 990701 & 0825 RAI Telcons Re Spent Fuel Pool Temp,Per LAR 98-008,which Requested Increase in Spent Fuel Storage capacity.Marked-up Page 4-1 of CPSES Fuel Storage Licensing Rept, Encl ML20211K2231999-08-31031 August 1999 Forwards Txu Electric Comments of Rvid,Version 2 ML20211J3801999-08-27027 August 1999 Forwards Corrected TS Page 3.8-26 to Amend 66 to Licenses NPF-87 & NPF-89,respectively.Footnote on TS Page 3.8-26 Incorrectly Deleted ML20211G7301999-08-26026 August 1999 Forwards Revs 29 & 30 to CPSES Technical Requirements Manual (Trm). Attachments 1 & 2 Contain Description of Changes for Revs 29 & 30 Respectively ML20211G1081999-08-26026 August 1999 Responds to NRR Staff RAI Re Util Mar 1999 Submittal for NRC Review & Approval of Changes to CPSES Emergency Classification Procedure ML20211G3441999-08-25025 August 1999 Forwards Response to NRC RAI on LAR 98-010 for Cpses,Units 1 & 2.Communication Contains No New Licensing Commitments Re Cpses,Units 1 & 2 ML20211B2861999-08-18018 August 1999 Forwards Insp Repts 50-445/99-13 & 50-446/99-13 on 990720- 23.No Violations Noted.Insp Included Implementation of Licensee Emergency Plan & Procedures During Util Biennial Emergency Preparedness Exercise ML20211C4661999-08-18018 August 1999 Discusses Proprietary Info Re Thermo-Lag.NRC Treated Bisco Test Rept 748-105 as Proprietary & Withheld It from Public Disclosure,Iaw 10CFR2.790 ML20210U3981999-08-17017 August 1999 Forwards Monthly Operating Repts for July 1999 for CPSES, Units 1 & 2,per TS 6.9.1.5.No Failures or Challenges to PORVs or SVs for Plant Occurred ML20211C0991999-08-17017 August 1999 Forwards Rev 3 to ASME Section XI ISI Program Plan,Unit 2 - 1st Interval, Replacing Rev 2 in Entirety ML20211C4571999-08-16016 August 1999 Forwards Omitted Subj Page of Contractor TER TXX-9919, Forwards Relief Request A-3,Rev 1 to Unit 1 ISI Program,Per Conversations Between NRC & Txu Electric on 9908021999-08-16016 August 1999 Forwards Relief Request A-3,Rev 1 to Unit 1 ISI Program,Per Conversations Between NRC & Txu Electric on 990802 ML20210R6561999-08-13013 August 1999 Forwards Response to NRR 990805 Telcon RAI Re License Amend Request 98-010,to Increase Power for Operation of CPSES Unit 2 to 3445 Mwth & Incorporating Addl Changes Into Units 1 & 2 TS ML20211A9501999-08-12012 August 1999 Discusses 990720-21 Workshop Conducted in Region IV Ofc,Re Exchange of Info in Area of Use of Risk Insights in Regulatory Activities.List of Attendees,Summary of Topic & Issues,Agenda & Copies of Handouts Encl ML20210S6411999-08-12012 August 1999 Informs That Wg Guldemond,License SOP-43780,is No Longer Performing Licensed Duties.Discontinuation of License Is Requested ML20210R2221999-08-12012 August 1999 Forwards Insp Repts 50-445/99-10 & 50-446/99-10 on 990510-0628.Violations Noted & Being Treated as Ncvs, Consistent with App C of Enforcement Policy ML20210N1101999-08-0404 August 1999 Provides Supplemental Info to Util 990623 License Amend Request 99-005 Re Bypassing DG Trips.Info Replaces Info Contained in Subject Submittal in Attachment 2,Section II, Description of TS Change Request ML20210L1461999-08-0303 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Requests Submittal of Ltr Identifying Individuals Taking Exam,Personnel Allowed Access to Exams & Mailing Address for Exams ML20210J2301999-08-0202 August 1999 Forwards Amend 96 to CPSES Ufsar.Replacement of FSAR Figures with Plant Process Flow Diagrams Meets Intent & Requirements of NRC Reg Guide 1.70,Rev 2 ML20210J6071999-08-0202 August 1999 Forwards line-by-line Descriptions of Changes in Amend 96 to CPSES UFSAR Transmitted by Util Ltr TXX-99166,dtd 990802. Replacment of FSAR Figures with Plant Process Flow Diagrams Meets Intent & Requirements of NRC Reg Guide 1.70,rev 2 TXX-9916, Notifies NRC That CPSES Units 1 & 2,improved TS Implemented on 9907271999-08-0202 August 1999 Notifies NRC That CPSES Units 1 & 2,improved TS Implemented on 990727 TXX-9918, Forwards CPSES 10CFR50.59 Evaluation Summary Rept 0008,for 970802-990201 & CPSES Commitment Matl Change Evaluation Rept 0003,for 970802-9906301999-08-0202 August 1999 Forwards CPSES 10CFR50.59 Evaluation Summary Rept 0008,for 970802-990201 & CPSES Commitment Matl Change Evaluation Rept 0003,for 970802-990630 ML20210K2321999-07-29029 July 1999 Forwards Insp Repts 50-445/99-12 & 50-446/99-12 on 990530-0710.No Violations Noted ML20210G5861999-07-29029 July 1999 Forwards fitness-for-duty Program Performance Data for Six Month Period of Jan-June 1999 ML20210J0121999-07-27027 July 1999 Forwards Summary of Methodology for Determination of NDE Measurement Uncertainty,In Response to Recent Discussions with NRC Re LAR 98-006 Concerning Rev to SG Tube Plugging Criteria TXX-9917, Provides Info Re Augmented Inservice Insp Plan,Which Requires Periodic Insp of Rv Head & Internals Lifting Devices at CPSES1999-07-26026 July 1999 Provides Info Re Augmented Inservice Insp Plan,Which Requires Periodic Insp of Rv Head & Internals Lifting Devices at CPSES ML20210F3121999-07-26026 July 1999 Responds to GL 99-02, Laboratory Testing of Nuclear-Grade Activated Charcoal, ML20210D8231999-07-23023 July 1999 Forwards Safety Evaluation of Relief Requests Re Use of 1998 Edition of Subsections IWE & Iwl of ASME Code for Containment Insp ML20210D3211999-07-21021 July 1999 Provides List of Estimates of Licensing Actions,In Response to Administrative Ltr 99-02,dtd 990603 ML20210C2931999-07-21021 July 1999 Supplements 880323 Response to NRC Bulletin 88-02, Rapidly Propagating...Sg Tubes, Non-proprietary WCAP-15010 & Proprietary Rev 0 to WCAP-15009, CP Unit 1 Evaluation for Tube Vibration... Encl.Proprietary Rept Withheld ML20209H0111999-07-16016 July 1999 Forwards Relief Request C-4 to CPSES Unit 2 ISI Program for Approval ML20210C3331999-07-16016 July 1999 Forwards Exam Repts 50-445/99-301 & 50-446/99-301 on 990618- 24.Exam Included Evaluation of Six Applicants for Senior Operator Licenses ML20209H2551999-07-16016 July 1999 Forwards ISI Summary Rept for Fourth Refueling Outage of CPSES Unit 2 & Containment ISI Summary Rept for Fourth Refueling Outage of CPSES Unit 2,per ASME Boiler & Pressure Vessel Code,Section Xi,Paragraph IWA-6230 1999-09-07
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARTXX-9924, Forwards Responses to Questions by NRC Re Application for Amends to Licenses NPF-87 & NPF-89,by Incorporating Changes Increasing RWST low-level Setpoint from Greater than But Equal to 40% to Greater than But Equal to 45% of Span1999-10-22022 October 1999 Forwards Responses to Questions by NRC Re Application for Amends to Licenses NPF-87 & NPF-89,by Incorporating Changes Increasing RWST low-level Setpoint from Greater than But Equal to 40% to Greater than But Equal to 45% of Span TXX-9923, Forwards Monthly Operating Repts for Sept 1999 for CPSES, Units 1 & 2,per Plant TS 5.6.4.No Failures of Challenges to PORVs of SV for Units Occurred1999-10-15015 October 1999 Forwards Monthly Operating Repts for Sept 1999 for CPSES, Units 1 & 2,per Plant TS 5.6.4.No Failures of Challenges to PORVs of SV for Units Occurred ML20217E7951999-10-12012 October 1999 Forwards COLR for Unit 1,Cycle 8,per TS 5.6.5 ML20216J5571999-10-0101 October 1999 Provides Final Response to GL 98-01,suppl 1, Y2K Readiness of Computer Sys at Npps TXX-9922, Forwards Revised COLR, for Cycle 5 for Unit 21999-10-0101 October 1999 Forwards Revised COLR, for Cycle 5 for Unit 2 ML20212G0721999-09-24024 September 1999 Forwards Rev 4 to Augmented Inservice Insp Plan for CPSES, Unit 1. Future Changes & Revs to Unit 1 Augmented Inservice Insp Plan Will Be Available on Site ML20212H0461999-09-24024 September 1999 Forwards Rev 6 to CPSES Glen Rose,Tx ASME Section XI ISI Program Plan for 1st Interval on 990820 TXX-9921, Suppls 981221 LAR 98-010 to Licenses NPF-87 & NPF-89, Clarfying Conditions of Use Re Analytical Methods Used to Determine Core Operating Limits,Per Telcon with NRC1999-09-10010 September 1999 Suppls 981221 LAR 98-010 to Licenses NPF-87 & NPF-89, Clarfying Conditions of Use Re Analytical Methods Used to Determine Core Operating Limits,Per Telcon with NRC ML20211L9871999-09-0303 September 1999 Forwards Rev 31 to Technical Requirements Manual. All Changes Applicable to Plants Have Been Reviewed Under Util 10CFR50.59 Process & Found Not to Include Any USQs TXX-9915, Responds to 990701 & 0825 RAI Telcons Re Spent Fuel Pool Temp,Per LAR 98-008,which Requested Increase in Spent Fuel Storage capacity.Marked-up Page 4-1 of CPSES Fuel Storage Licensing Rept, Encl1999-09-0303 September 1999 Responds to 990701 & 0825 RAI Telcons Re Spent Fuel Pool Temp,Per LAR 98-008,which Requested Increase in Spent Fuel Storage capacity.Marked-up Page 4-1 of CPSES Fuel Storage Licensing Rept, Encl ML20211K2231999-08-31031 August 1999 Forwards Txu Electric Comments of Rvid,Version 2 ML20211G1081999-08-26026 August 1999 Responds to NRR Staff RAI Re Util Mar 1999 Submittal for NRC Review & Approval of Changes to CPSES Emergency Classification Procedure ML20211G7301999-08-26026 August 1999 Forwards Revs 29 & 30 to CPSES Technical Requirements Manual (Trm). Attachments 1 & 2 Contain Description of Changes for Revs 29 & 30 Respectively ML20211G3441999-08-25025 August 1999 Forwards Response to NRC RAI on LAR 98-010 for Cpses,Units 1 & 2.Communication Contains No New Licensing Commitments Re Cpses,Units 1 & 2 ML20210U3981999-08-17017 August 1999 Forwards Monthly Operating Repts for July 1999 for CPSES, Units 1 & 2,per TS 6.9.1.5.No Failures or Challenges to PORVs or SVs for Plant Occurred ML20211C0991999-08-17017 August 1999 Forwards Rev 3 to ASME Section XI ISI Program Plan,Unit 2 - 1st Interval, Replacing Rev 2 in Entirety TXX-9919, Forwards Relief Request A-3,Rev 1 to Unit 1 ISI Program,Per Conversations Between NRC & Txu Electric on 9908021999-08-16016 August 1999 Forwards Relief Request A-3,Rev 1 to Unit 1 ISI Program,Per Conversations Between NRC & Txu Electric on 990802 ML20210R6561999-08-13013 August 1999 Forwards Response to NRR 990805 Telcon RAI Re License Amend Request 98-010,to Increase Power for Operation of CPSES Unit 2 to 3445 Mwth & Incorporating Addl Changes Into Units 1 & 2 TS ML20210S6411999-08-12012 August 1999 Informs That Wg Guldemond,License SOP-43780,is No Longer Performing Licensed Duties.Discontinuation of License Is Requested ML20210N1101999-08-0404 August 1999 Provides Supplemental Info to Util 990623 License Amend Request 99-005 Re Bypassing DG Trips.Info Replaces Info Contained in Subject Submittal in Attachment 2,Section II, Description of TS Change Request TXX-9918, Forwards CPSES 10CFR50.59 Evaluation Summary Rept 0008,for 970802-990201 & CPSES Commitment Matl Change Evaluation Rept 0003,for 970802-9906301999-08-0202 August 1999 Forwards CPSES 10CFR50.59 Evaluation Summary Rept 0008,for 970802-990201 & CPSES Commitment Matl Change Evaluation Rept 0003,for 970802-990630 ML20210J2301999-08-0202 August 1999 Forwards Amend 96 to CPSES Ufsar.Replacement of FSAR Figures with Plant Process Flow Diagrams Meets Intent & Requirements of NRC Reg Guide 1.70,Rev 2 ML20210J6071999-08-0202 August 1999 Forwards line-by-line Descriptions of Changes in Amend 96 to CPSES UFSAR Transmitted by Util Ltr TXX-99166,dtd 990802. Replacment of FSAR Figures with Plant Process Flow Diagrams Meets Intent & Requirements of NRC Reg Guide 1.70,rev 2 TXX-9916, Notifies NRC That CPSES Units 1 & 2,improved TS Implemented on 9907271999-08-0202 August 1999 Notifies NRC That CPSES Units 1 & 2,improved TS Implemented on 990727 ML20210G5861999-07-29029 July 1999 Forwards fitness-for-duty Program Performance Data for Six Month Period of Jan-June 1999 ML20210J0121999-07-27027 July 1999 Forwards Summary of Methodology for Determination of NDE Measurement Uncertainty,In Response to Recent Discussions with NRC Re LAR 98-006 Concerning Rev to SG Tube Plugging Criteria TXX-9917, Provides Info Re Augmented Inservice Insp Plan,Which Requires Periodic Insp of Rv Head & Internals Lifting Devices at CPSES1999-07-26026 July 1999 Provides Info Re Augmented Inservice Insp Plan,Which Requires Periodic Insp of Rv Head & Internals Lifting Devices at CPSES ML20210F3121999-07-26026 July 1999 Responds to GL 99-02, Laboratory Testing of Nuclear-Grade Activated Charcoal, ML20210C2931999-07-21021 July 1999 Supplements 880323 Response to NRC Bulletin 88-02, Rapidly Propagating...Sg Tubes, Non-proprietary WCAP-15010 & Proprietary Rev 0 to WCAP-15009, CP Unit 1 Evaluation for Tube Vibration... Encl.Proprietary Rept Withheld ML20210D3211999-07-21021 July 1999 Provides List of Estimates of Licensing Actions,In Response to Administrative Ltr 99-02,dtd 990603 ML20209H2551999-07-16016 July 1999 Forwards ISI Summary Rept for Fourth Refueling Outage of CPSES Unit 2 & Containment ISI Summary Rept for Fourth Refueling Outage of CPSES Unit 2,per ASME Boiler & Pressure Vessel Code,Section Xi,Paragraph IWA-6230 ML20209H0111999-07-16016 July 1999 Forwards Relief Request C-4 to CPSES Unit 2 ISI Program for Approval ML20209G0721999-07-13013 July 1999 Forwards Monthly Operating Repts for June 1999 for CPSES, Units 1 & 2,per TS 6.9.1.5.No Failures or Challenges to PORVs of SV Occurred During Reporting Period ML20209F0681999-07-0909 July 1999 Informs That Effective 990514,TU Electric Formally Changed Name to Txu Electric.Change All Refs of TU Electric to Txu Electric on Correspondence Distribution Lists ML20209E0421999-07-0909 July 1999 Forwards Response to NRC Request for Addl Info on LAR 98-010.Attachment 1 Is Affidavit for Info Supporting LAR 98-010 ML20209B6021999-06-30030 June 1999 Submits Second Response to NRC GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Npps. Readiness Disclosure for Reporting Status of Facility Y2K Readiness Encl ML20195J6981999-06-15015 June 1999 Provides Addl Info Related to Open Issue,Discussed in 990610 Conference Call with D Jaffe Re ISI Program Relief Request L-1 Submitted by Util on 980220 ML20196A4921999-06-15015 June 1999 Forwards Rev 30 to Physical Security Plan.Rev Withheld,Per 10CFR73.21 ML20195J0491999-06-14014 June 1999 Submits Response to RAI Re Implementation of 1.0 Volt Repair Criteria ML20195J0651999-06-14014 June 1999 Submits Response to RAI Re GL 95-07, Pressure Locking & Thermal Binding of Safety Related Power Operated Gate Valves 05000445/LER-1999-001, Forwards LER 99-001-00, Some Electrical Contacts for RCS Pressure Relief Valves Were Not Included in Surveillance Testing Procedures. New Licensing Commitments Identified in Attachment 11999-06-0808 June 1999 Forwards LER 99-001-00, Some Electrical Contacts for RCS Pressure Relief Valves Were Not Included in Surveillance Testing Procedures. New Licensing Commitments Identified in Attachment 1 ML20195F0091999-06-0808 June 1999 Forwards Response to RAI Re Units 1 & 2 ISI Program for Relief Requests E-1 & L-1.Communication Contains No New Licensing Basis Commitments Re Cpses,Units 1 & 2 ML20207E1921999-05-28028 May 1999 Submits Updated Request for NRC Staff to Review & Approve Certain Changes to CPSES Emergency Plan Submitted in 981015 & s Prior to Changes Being Implemented at CPSES ML20207E1711999-05-28028 May 1999 Supplements 990526 LAR 99-004 as TU Electric Believes Extingency Exists in That Proposed Amend Was Result of NOED Granted to Prevent Shudown of CPSES Unit 1 ML20207D9841999-05-26026 May 1999 Requests That NRC Exercise Enforcement Discretion to Allow Cpses,Unit 1 to Remain in Mode 1,power Operation,Without Having Performed Svc Test,Per SR 4.8.2.1d on Unit 1 Battery BT1ED2 ML20195B6351999-05-25025 May 1999 Submits Response to RAI Re GL 95-07, Pressure Locking & Thermal Binding of Safety Related Power Operated Gate Valves TXX-9912, Forwards Txu Electric (Formerly TU Electric) CPSES Emergency Preparedness Exercise Scenario Manual for 990721-22,Graded Exercise1999-05-21021 May 1999 Forwards Txu Electric (Formerly TU Electric) CPSES Emergency Preparedness Exercise Scenario Manual for 990721-22,Graded Exercise ML20206U1981999-05-20020 May 1999 Forwards Form 10K Annual Rept,Per 10CFR50.71(b). Communication Contains No New Licensing Basis Commitments Re Cpses,Units 1 & 2 ML20196L1931999-05-20020 May 1999 Forwards MOR for Apr 1999 for Cpses,Units 1 & 2.During Reporting Period There Have Been No Failures or Challenges to Power Operated Relief Valves or Safety Valves TXX-9911, Forwards non-proprietary & Proprietary Responses to RAI Re LAR 98-010 by Incorporating Attached Changes Into CPSES Unit 2 OL NPF-89 & CPSES Units 1,OL NPF-87 & 2 TS to Increase Licensed Power.W & Caldon Proprietary Responses Withheld1999-05-14014 May 1999 Forwards non-proprietary & Proprietary Responses to RAI Re LAR 98-010 by Incorporating Attached Changes Into CPSES Unit 2 OL NPF-89 & CPSES Units 1,OL NPF-87 & 2 TS to Increase Licensed Power.W & Caldon Proprietary Responses Withheld 1999-09-03
[Table view] Category:UTILITY TO NRC
MONTHYEARML20059K6141990-09-17017 September 1990 Submits Documentation of 900906 Telcon Re Addl Util Candidate for Licensed Operator Generic Fundamentals Exam Section ML20059G8761990-09-10010 September 1990 Forwards Rev 8 to Physical Security Plan.Rev Withheld (Ref 10CFR73.21) ML20059F8461990-09-0404 September 1990 Responds to NRC Re Violations Noted in Insp Repts 50-445/90-22 & 50-446/90-22 on 900606-0705.Corrective action:OPT-467A Changed to Provide Addl Prerequisite Info Re Solid State Protection Sys Switch Lineup During Testing ML20059E4981990-08-31031 August 1990 Forwards Revised Radial Peaking Factor Limit Rept for Cycle 1 Per Tech Specs Through Amend 1 & ML20059E4201990-08-30030 August 1990 Forwards Objectives & Guidelines for 1990 Emergency Preparedness Exercise Scheduled for 901113 ML20028G8281990-08-29029 August 1990 Forwards Comanche Peak Unit 1 Semiannual Radioactive Effluent Release Rept,900403-0630 & ODCM TXX-9030, Forwards Endorsements 40 & 4 to Nelia Policy NF-274 & Maelu Policy M-90,respectively & Endorsements 10,11,12,13,14 & 15 to Maelu Policy MF-1311990-08-27027 August 1990 Forwards Endorsements 40 & 4 to Nelia Policy NF-274 & Maelu Policy M-90,respectively & Endorsements 10,11,12,13,14 & 15 to Maelu Policy MF-131 ML20059F4381990-08-23023 August 1990 Forwards Public Version of Revised Emergency Plan & Corporate Emergency Response Procedures,Consisting of Rev 1 to EPP-313,Rev 7 to CERP-101,Rev 7 to CERP-102 & Revised Forms.W/Dh Grimsley 900906 Release Memo TXX-9029, Responds to NRC Re Violations Noted in Insp Repts 50-445/89-57 & 50-446/89-57.Corrective Actions:Storage Facilities for Instrumentation & Control Work Packages Improved to Provide Acceptable Protection for Documents1990-08-20020 August 1990 Responds to NRC Re Violations Noted in Insp Repts 50-445/89-57 & 50-446/89-57.Corrective Actions:Storage Facilities for Instrumentation & Control Work Packages Improved to Provide Acceptable Protection for Documents ML20058P0571990-08-13013 August 1990 Forwards, Comanche Peak Steam Electric Station Unit 1 Control Room Simulator 10CFR55 Certification Initial Rept TXX-9026, Forwards Addendum to Unit 1 Preservice Insp (PSI) Summary Rept, Providing Remaining Info & Editorial Corrections Re PSI & Addressing Exams & Tests of Code Class 1 & 2 Sys as Stipulated in PSI Plan1990-08-13013 August 1990 Forwards Addendum to Unit 1 Preservice Insp (PSI) Summary Rept, Providing Remaining Info & Editorial Corrections Re PSI & Addressing Exams & Tests of Code Class 1 & 2 Sys as Stipulated in PSI Plan ML20058N2311990-08-0909 August 1990 Forwards First Half 1990 fitness-for-duty Program Performance Data,Per 10CFR26.71(d).Point of Contact for Personnel,Random Testing Program Results & Confirmed Positive Tests Summary & Mgt Summary Included in Data ML20059A5831990-08-0404 August 1990 Responds to Info Request Made During 900802 Meeting Re Inadvertent Safety Injections on 900726 & 30 & Results of 100% Power Plateau Testing TXX-9024, Provides Status of Exam Activity & Revised Completion Schedule for Portion of Exam.Util Deferred Preoperational Testing of Facility Spent Fuel Pool Cooling & Cleanup Sys Until Prior to First Off Loading of Spent Fuel1990-08-0303 August 1990 Provides Status of Exam Activity & Revised Completion Schedule for Portion of Exam.Util Deferred Preoperational Testing of Facility Spent Fuel Pool Cooling & Cleanup Sys Until Prior to First Off Loading of Spent Fuel TXX-9022, Forwards Detailed Descriptions of Changes in Amend 79 to FSAR for Comanche Peak Steam Electric Station1990-07-31031 July 1990 Forwards Detailed Descriptions of Changes in Amend 79 to FSAR for Comanche Peak Steam Electric Station TXX-9027, Responds to NRC Re Violations Noted in Insp Repts 50-445/90-19 & 50-446/90-19.Corrective Action:Specific Activity within Tech Spec Limits.No Further Corrective Action Required1990-07-30030 July 1990 Responds to NRC Re Violations Noted in Insp Repts 50-445/90-19 & 50-446/90-19.Corrective Action:Specific Activity within Tech Spec Limits.No Further Corrective Action Required ML20055J1571990-07-27027 July 1990 Submits Info Re Replacement of Borg-Warner/Intl Pump,Inc Check Valve Swing Arms,Per .Swing Arms in ASME Code Class 2 Check Valves Will Be Replaced During First Refueling Outage ML20056A0461990-07-24024 July 1990 Requests Regional Waiver of Compliance for Containment Pressure Transmitter 1-PT-934 During Coming Outage TXX-9023, Responds to NRC Bulletin 90-001, Loss of Fill-Oil in Transmitters Mfg by Rosemount. No Subj Transmitters in Existence at Facility1990-07-18018 July 1990 Responds to NRC Bulletin 90-001, Loss of Fill-Oil in Transmitters Mfg by Rosemount. No Subj Transmitters in Existence at Facility ML20055G6351990-07-17017 July 1990 Submits Results of Remote Shutdown Panel Environ Survey ML20055F9371990-07-13013 July 1990 Submits Info Re Revised Acceptance Criteria for THERMO-LAG Fire Barrier,Per 900705 Telcon.On Exposure to Heat Flux at Surface of Barrier,Listed Mechanisms Activated.Fire Testing Demonstrates That Panels Qualified W/Variation in Thickness ML20055F9391990-07-13013 July 1990 Advises That Operators Have Gained Significant Experience in Operating Plant Under Wide Range of Conditions & Have Demonstrated Necessary Proficiency to Safely Operate Unit ML20044A7001990-06-26026 June 1990 Responds to Generic Ltr 90-04, Request for Info on Status of Licensee Implementation of Generic Safety Issues Resolved W/Imposition of Requirements or Corrective Actions. Util Will Implement for Unit 2 Activities Performed for Unit 1 ML20044A1411990-06-20020 June 1990 Forwards Endorsements 4 & 5 to Nelia Certificate N-90, Endorsements 5 & 6 to Maelu Certificate M-90 & Endorsements 34,35,36,37,38 & 39 to Nelia Policy NF-274 ML20043H7031990-06-18018 June 1990 Discusses Mod/Rework to Auxiliary Feedwater Sys Check Valves Mfg by Bw/Ip Intl,Inc.All But One Affected Check Valve modified.Motor-driven Auxiliary Feedwater Pump Discharge Valve Check Valve Body Replaced ML20043G3131990-06-15015 June 1990 Forwards Addl Info Re Pressurizer Surge Line Thermal Stratification & leak-before-break Evaluation & Nonproprietary Suppl 3 to WCAP-12247, Supplementary Assessment... & Proprietary Suppl 3 to WCAP-12248 ML20043H2181990-06-15015 June 1990 Forwards Response to 900515 Request for Addl Info on Emergency Preparedness.Ongoing Emergency Preparedness Programs Address Concerns Raised by Citizens for Fair Util Regulation ML20043C5671990-06-0101 June 1990 Discusses Identification of Slave Relays Tested Using Alternative Methodology,Per 900402 Commitment.Encl Tabulation Identifies Test Type,Applicable Procedures & Equipment & Impact of Improper Documentation ML20043E7131990-06-0101 June 1990 Responds to NRC 900517 Notice of Violation & Imposition of Civil Penalty in Amount of $25,000.Corrective Action:Qc Mgt Counseled Level III Inspector & QC Supervisor on Importance of Good Communications W/Receipt Inspectors ML20043C4501990-05-31031 May 1990 Advises That Util Revised FSAR Section 15.1.2 & Question/ Response 32.108,per 10CFR50.59 ML20043B5471990-05-25025 May 1990 Provides Status of Facility Design & Const Activities,Per Request.Detailed Design Work Will Resume in June 1990.Const Activities Expected to Increase Signficantly by Jan 1991 ML20043B5481990-05-23023 May 1990 Provides Clarification of 890710 Commitment Re Power Ascension Program.Cooldown Portion of Remote Shutdown Test Performed During Preoperational Testing,Per FSAR & Reg Guide 1.68.2 TXX-9018, Advises of Completion of Implementation of Requirements of Generic Ltr 89-13, Svc Water Sys Problems Affecting Safety- Related Equipment1990-05-21021 May 1990 Advises of Completion of Implementation of Requirements of Generic Ltr 89-13, Svc Water Sys Problems Affecting Safety- Related Equipment ML20043D1711990-05-21021 May 1990 Forwards Public Version of Revised Emergency Plan Procedures,Including Rev 8 to EPP-109,Rev 7 to EPP-112,Rev 4 to EPP-116 & Rev 6 to EPP-121.W/DH Grimsley 900604 Release Memo ML20043B0981990-05-15015 May 1990 Forwards Radial Peaking Factor Limit Rept for Cycle 1, Containing F(Xy) Limits for All Core Planes Containing Bank D Control Rods & All Unrodded Core Planes ML20042F2851990-05-0303 May 1990 Supplemental Response to Generic Ltr 90-01, Request for Voluntary Participation in NRC Regulatory Impact Survey. ML20042F3861990-05-0303 May 1990 Responds to NRC 900410 Ltr Re Violations Noted in Insp Repts 50-445/90-10 & 50-446/90-10 on 900206-07 & 0226-0302. Corrective Action:Memo Issued Emphasizing That Discrepancies Should Be Brought to Attention of Site Organizations ML20042F3051990-05-0202 May 1990 Provides Revised Response to Generic Ltr 88-17 Re Loss of DHR ML20042F3021990-05-0202 May 1990 Responds to NRC 900402 Ltr Re Violations Noted in Insp Repts 50-445/89-23 & 50-446/89-23.Util Does Not Believe That Circumstances Described in 900402 Ltr Constitutes Violation of 10CFR50.9(a) ML20042E4581990-04-12012 April 1990 Responds to Inconsistencies in Terminology & Labelling Identified During NRC 890118 & 19 Audit of Facility Dcrdr. Util Believes Control Room Inventory Requirement of Suppl 1 to NUREG-0737,satisfied ML20042E0701990-04-10010 April 1990 Discusses 900305 Meeting W/Nrc in Rockville,Md Re Offsite Power Availability for Automatic Switch Co Solenoids for MSIV in Event of Nonmechanistic Main Steam Line Crack in Superpipe Region ML20012F5011990-04-0303 April 1990 Forwards Corrections to 891016 Response to Emergency Diesel Generator Engine Requirements.Lengths of Two Pairs of Bolts Above Crankpin Shall Be Measured Ultrasonically Before Detensioning & Disassembly of Bolts ML20012F3221990-04-0202 April 1990 Discusses ESF Sys Slave Relay Alternate Test Methodology. Implementation Schedule for Design Mods to Relay Will Be Submitted by 900601 ML20042D8081990-03-29029 March 1990 Forwards Proposed Change to FSAR Section 13.4 Re Station Operations Review Committee.Similar Change Submitted in 900328 Ltr for Chapter 6 of Facility Tech Specs ML20012F0411990-03-28028 March 1990 Forwards marked-up Pages of Facility Draft Tech Specs & Bases (NUREG-1381) Provided W/Low Power OL ML20012E6051990-03-27027 March 1990 Forwards Endorsements 1-4 to Maelu Certificate M-90, Endorsements 1-9 to Maelu Policy MF-131,Endorsements 29-33 to Nelia Policy NF-274 & Endorsements 1-3 to Nelia Certificate N-90 ML20012E6531990-03-27027 March 1990 Provides Final Response to Reporting Requirement 2 of NRC Bulletin 88-008, Thermal Stresses in Piping Connected to RCS, for Unit.Nde Requirements of Action 2 Not Considered Applicable to Unit ML20012E1911990-03-23023 March 1990 Forwards Comanche Peak Steam Electric Station Unit 1 Cycle 1 Startup Physics Tests Control Rod Worth Predictions Utilizing TU Electric Control Rod Swap Methodology. ML20012E1581990-03-23023 March 1990 Clarifies 880624 Response to NRC Generic Ltr 88-05, Boric Acid Corrosion of Carbon Steel Reactor Pressure Boundary Components in PWR Plants. ML20012D0151990-03-19019 March 1990 Responds to NRC 900216 Ltr Re Violation a Noted in Insp Repts 50-445/90-03 & 50-446/90-03.Corrective Actions: Groundwater Calculations Completed & Engineering Personnel Reminded of Procedural Requirements 1990-09-04
[Table view] |
Text
. 4 Log # TXX-4922 File # 10068 TEXAS UTILITIES GENERATING COMPANY NKYWAY TOWER . 400 NORTH OLIVE STREET. L.B. 51. IDAILAN. TEXAM 78303 July 23,1986 72M7AM.".7.*A Director of Nuclear Reactor Regulation Attention: Mr. V. S. Noonan, Director Comanche Peak Project Division of Licensing U. S. Nuclear Regulatory Commission Washington, D.C. 20555
SUBJECT:
COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)
DOCKET NOS. 50-445 AND 50-446 REVISION 2 0F APPENDIX E OF THE CPRT PROGRAM PLAN
Dear Mr. Noonan:
As requested, enclosed herewith is the revision bar annotated copy of revision 2 of Appendix E of the CPRT Program Plan. Please replace the copy of the Appendix E transmitted to you by my June 6, 1986, letter with the attached.
Revision 2 of Appendix E was necessitated for the following reasons:
- General editing to eliminate repetitious wording.
- Title change to more appropriately reflect what the Appendix addresses.
l - Revised definition of QA/QC program deficiency to more precisely l describe the criteria that a QA/QC program deviation must i
satisfy in order to be classified as a deficiency.
l
- Sections B.5 and B.6 in Revision 2 were moved forward from Sections C.5 and C.7 in Revision 1, because these sections more l
appropriately belong in Section B rather than Section C of the appendix.
- Title change of Section C from " Evaluation Process" to ,
l " Follow-up Activities". The new title is a better descriptor of the activities described therein.
- Section D " Closure" was added for completeness.
Should you have any further questions, please contact Mr. John Beck or myself.
Very truly yours,
&f$Y F
f W. G. Counsil 4'
Ok SSP /arh i\
c - J. Ellis A DEVISION OF TEXAN UTTLETIES ELECTRIC COMPANY
t Rsvisient 2
, Page 1 of 8 APPENDIX E I
CIRT Procedure For The Resolution Of Discrepancies Identified by the CPRT A. PURPOSE The purpose of this procedure is to provide instructions for the l resolution of discrepancies identified by the CPRT.
The resolution processes described in this Appendix were primarily developed and designed to address discrepancies identified by the CPRT during the implementation of the ISAPs and DSAPs developed for the CPRT self-initiated investigatory efforts. In order to ensure consistency throughout the CPRT program, these processes will also l be applied in the reporting of the results of the CPRT investigatory efforts for ISAPs and portions of DSAPs that were developed to respond to concerns specifically identified by External Sources.
Additional information related to the development, approval and documentation of corrective actions for all deviations or deficiencies (both specific and programmatic) identified by the CPRT is p rovided in Appendix H to the CPRT Program Plan.
~
B. CLASSIFICATION Discrepancies identified by the CPRT are classified into categories of relative significance in order to determine the appropriate follow-up activities required to resolve and close them.
The following definitions have been established for use in classifying identified discrepancies. The basis for classification of each discrepancy shall be documented.
- 1. Design Adequacy All design discrepancies are classified as observations, deviations or deficiencies, depending upon whether the design error resulted in a failure to meet design criteria and depending on the safety significance of any failures to meet design criteria. The definitions employed in this area by the CPRT are as follows:
(a) Design Discrepancy Any identified error related to design inputs, implementing documents and outputs for safety-related structures, systems or components that could have an adverse impact on the adequacy of their design.
.-p-,--,--.g.- - -sus -- -,,,----y--
- - - - - - , ,-,;r, yy ,e y
Rsvisien: 2 Page 2 of 8 APPENDIX E (Cont'd)
B. CLASSIFICATION (Cont'd)
(b) Design Observation Any identified design discrepancy that has been determined to not constitute a design deviation.
(c) Design Deviation Any identified design discrepancy that has been determined to constitute a verified failure to meet a design commitment or specification. In this regard, design commitments include regulatory requirements, FSAR commitments, other licensing commitments, code commitments or other project-specific design criteria or commitments.
(d) Design Deficiency Any identified design deviation that has been
, determined to be safety-significant.
(e) Safety-Significant ,
" Safety 7significant", for purposes of the CPRT Program , is defined to mean that the identified discrepancy, if uncorrected, would result in the loss of capability of the affected system, structure or component to perform its intended safety function. For purposes of the CPRT Program, credit is not allowed for redundancy at the component, system, train or structure l
l level.
(f) Programmatic Design Deficiency A set of related design discrepancies that have been l
i determined to constitute an adverse trend that'is programmatic in nature.
1 This definition, which is employed in the CPRT Program for purposes of sample expansion, is more restrictive than that usually applied to the term " safety-significant" for regulatory purposes or in common parlance, in that it ignores redundancies that do exist in l real life. [ Compare 10CFR50, Appendix A (Introduction, " Single Failure"); 10CFR50.55(e)(1) .] Identification of a deficiency as
" safety-significant" for purposes of the CPRT Program, therefore, is not necessarily equivalent to a statement that, in fact, the deficiency, if uncorrected, would have resulted in unsafe operation.
i m,.-.___,____--.__m _-,wm r e e _ . - - - _ _ . -_ -
,-.-,.-.,.-,,7m p, _m..g - - -
Rsvision: 2 Pcg2 3 of 8 APPENDIX E (Cont'd)
B. CLASSIFICATION (Cont'd)
- 2. Construction Adequacy All construction discrepancies are classified either as deviations or deficiencies, depending upon the safety significance of the discrepancy. The definitions employed by the CPRT in this area are as follows:
(a) Construction Deviation Any identified discrepancy related to construction or installation of safety-related hardware that has been determined to constitute a verified failure to construct or install a safety-related structure, system or component in accordance with safety-significant attributes and criteria contained in design drawings and specifications or installation procedures /
requirements.
(b) Construction Deficiency Any identified construction deviation that has been '
determined to be safety-significant.
(c) Safety-Significant See B.l.(e) and associated footnote for definition.
(d) Programmatic Construction Deficiency A set of related construction deviations that has been determined to constitute an adverse trend that is programmatic in nature.
l 3. Testing Program Adequacy 1
All testing discrepancies are classified either as deviations or deficiencies, depending upon the significance of the
! discrepancy. The definitions employed by the CPRT in this
! area are as follows:
t i (a) Testing Deviation Any verified failure to meet a testing program commitment, regulatory requirement or a project specific testing commitment. In this regard, commitments include FSAR commitments and other licensing commitments.
l
Rsvisiont 2 Pags 4 of 8 APPENDIX E (Cont'd)
B. CLASSIFICATION (Cont'd)
(b) Testing Deficiency Any identified testing deviation that is determined to have resulted in a failure to meet a testing program objective such that retesting is required to demonstrate that the affected structure, system or component is capable of performing its intended safety function.
(c) Programmatic Testing Deficiency A set of related testing deviations that has been determined to constitute an adverse trend that is programmatic in nature.
- 4. QA/QC Program Adequacy All QA/QC program discrepancies are classified either as deviations or deficiencies, depending upon the significance of the discrepancy. The definitions employed by the CPRT in this area are as follows: ,
(a) QA/QC Program Deviation Any verified failure of the QA/QC program to meet regulatory requirements (i.e., 10CFR50 Appendix B),
FSAR commitments or other licensing commitments.
(b) QA/QC Program Deficiency Any identified QA/QC program deviation meeting one or more of the following criteria:
- Inadequacy of a QA/QC program element such that substantive revision of the program or other corrective action is required to bring it into compliance with the regulatory requirements, FSAR commitments or other licensing commitments; or
- Extensive evaluation would be required to determine the effect on the quality of construction.
l
~
Rsvision: 2 l Paga 5 of 8 APPENDIX E (Cont'd)
B. CLASSIFICATION (Cont'd)
(c) Programmatic QA/QC Program Deficiency A set of related QA/QC deviations that has been determined to constitute an adverse trend that is programmatic in nature.
- 5. Adverse Trends A trend is a set of related observations and/or deviations having attributes that reflect a discernible commonality.
Examples of possible commonalities include:
- The individual, group of individuals or organization performing the safety-related activity; and
- The program requirements, procedures or controls governing the performance of the safety-related activity.
A trend is considered to be adverse if it is determined that the identified pattern or commonality is likely to have ,
resulted in the occurrence of an undetected deficiency in the affected area, population or stratum. Adverse trends are also referred to as programmatic deficiencies.
Each trend identified by the CPRT will be evaluated to determine whether it is adverse (unless it is processed as an unclassified trend). CPRT Review Team Leaders are responsible for performing such evaluations and for making such determinations within their areas of responsibility.
The nature and extent of these evaluations will vary depending upon the nature of the identified trend and the information already available regarding the implications of the trend.
Considerations in this regard include the extent to which:
- The boundaries of the trend have been identified;
- The underlying cause and/or contributing causes of the trend have been identified;
- The area, population or stratum affected by the trend has been investigated;
- The potential safety significance of the trend has been identified; and
Rzvisien: 2 Page 6 of 8 APPENDIX E (Cont'd)
B. CLASSIFICATION (Cont'd)
- Corrective action has already been taken to address the' trend.
The results of these evaluations vill be documented and retained in the CPRT working files.
- 6. Uncl'assified Deviations Or Trends As noted in the Program Plan (e.g. , Program Plan,Section IV(A), p.14), it may be determined that it is more practical or expeditious, with respect to a given deviation or set of deviations or trend, to proceed directly to analysis of root cause and generic implications and to specification of corrective actions. Where such a determination has been made, performing a safety significance evaluation in respect of the unclassified deviation (s) or an adverse trend analysis in respect of the unclassified trend would serve no purpose and will not be done. Such unclassified deviations or trends will be tracked as deficiencies or adverse trends for purposes of root cause and generic implications analysis and for the purpose of corrective actions. ,
C. FOLLOW-UP ACTIVITIES CPRT follow-up activities for each classification of discrepancies are listed below. In addition, activities relevant to corrective action shall be accomplished in accordance with Appendix H of the Program Plan.
In special cases, actions beyond those listed for any given classification may be warranted. For example, it may be considered appropriate to assess root cause and generic implications for a particular deviation or (non-adverse) trend. Review Team Leaders are responsible for identifying any such potential special cases to the Senior Review Team. The Senior Review Team in conjunction l
l with the Review Team Leader will determine what additional action is required in such cases.
- 1. (Design) Observations Design observations will be collectively evaluated for the purpose of identifying adverse trend.
I
Rsvision: 2 Page 7 of 8 APPENDIX E (Cont'd)
C. FOLLOW-UP ACTIVITIES (Cont'd)
- 2. Deviations All deviations will be transmitted to the CPSES Project for evaluation and disposition in accordance with CPSES Project procedures for processing nonconformances.
The CPRT will determine (to the extent required by Appendix H) that appropriate corrective action has been defined and accomplished for the non-conformance associated with the deviation.
All deviations within each area of CPRT activities (i.e.,
design, construction, testing, and QA/QC program) will be collectively evaluated for the purpose of identifying adverse trends.
- 3. Deficiencies (Including Unclassified Deviations)
All deficiencies will be transmitted to the CPSES Project for evaluation and disposition in accordance with CPSES Project procedures for processing nonconformances. -
An investigation of the root cause and/or contributing causes for the deficiency will be conducted.
The generic implications of the deficiency will be evaluated.
This evaluation must be of sufficient scope to provide reasonable assurance that there are no remaining undetected deficiencies within the affected area, population or stratum.
Any additional discrepancies that may be identified as a l
result of the generic implications evaluation will each be classified and dispositioned in accordance with this Appendix.
In addition, the associated set of such discrepancies will be further evaluated for commonalities that may be indicative of an adverse trend.
The CPRT will determine (to the extent required by Appendix H) that appropriate corrective action has been accomplished for the non-conformance associated with the deficiency.
l The bases for the above-mentioned determinations will be documented.
- 4. Trends No specific follow-up activities are required for a trend which has not been classified as an adverse trend. I L ___ _ __
l Rsvisicn 2 Page 8 of 8 APPENDIX E (Cont'd)
C. FOLLOW-UP ACTIVITIES (Cont'd)
- 5. Adverse Trends (Including Unclassified Trends) and Programmatic Deficiencies An investigation of the root cause and/or contributing causes of the trend will be conducted.
The generic implications of the trend will be evaluated. This evaluation must be of sufficient scope to provide reasonable assurance that there are no undetected deficiencies within the affected area, population or stratum.
Appropriate corrective actions for any additional deviations or deficiencies identified during the evaluation of generic implications must be defined.
Appropriate corrective action to preclude recurrence in the future must be defined.
, The results of these activities will be documented and
' retained in the CPRT working files. .
D. CLOSURE For the purpose of the third-party effort, each CPRT-identified discrepancy shall be considered closed when the applicable actions of this procedure have been completed and documented.
l l
l l'
i
_ _ _ _ . _ _ . _ _ _ _ . . - . . , _ _ . __,_____._,._...,._..____.__.__-.____._,_,.._i.._______