Category:INTERNAL OR EXTERNAL MEMORANDUM
MONTHYEARML20217M5311999-10-25025 October 1999 Notification of 991103 Meeting with Util in Rockville,Md to Discuss Licensee Analytical Approach in Design of Pipe Supports at Plant ML20217C9051999-10-12012 October 1999 Forwards SER Input Approving License Request for Amend to Plant,Units 1 & 2.Licensee Proposal to Modify Definition of Core Alteration in Section 1.0 of TS & Update Sections 3/4.1,3.4.3 & 3/4.9 to Reflect Proposed Definition Change ML20211K8611999-09-0101 September 1999 Informs That There Has Been Some Confusion Re Recently Issued ODCM Generic Section Rev Which Needs to Be Clarified. Clarifications Are Listed ML20210P1361999-08-0404 August 1999 Notification of 990817 Meeting with Util in Rockville, Maryland to Discuss Status of Licensing Actions Submitted by Comm Ed & Plan for Proposed Licensing Workshop ML20237E3131998-08-26026 August 1998 Forwards for Public Release,Info Re NRC SMM Held on 980714-15.Summary of January 1998 NRC SMM & Watch List Removal Evaluation Factors Also Encl ML20237D9821998-08-11011 August 1998 Notification of Licensee Meeting W/Util on 980915 to Discuss Status of LaSalle Unit 1 & Performance Improvement & Restart Plans for LaSalle Unit 2 ML20237D9751998-08-11011 August 1998 Notification of Cancelled Licensee Meeting W/Util to Discuss Effectiveness of Performance Improvement Initiatives & Progress Toward LaSalle Unit 1 Restart ML20237D9721998-08-11011 August 1998 Notification of Cancelled Licensee Meeting W/Util on 980903 to Discuss Effectiveness of Performance Improvement Initiatives & Progress Toward LaSalle Unit 1 Restart ML20216H6971998-03-17017 March 1998 Notification of 980326 Meeting W/Commonwealth Edison Co in Lisle,Il to Discuss Comed Request to Consolidate near-site Emergency Operations Facility Into Single Central EOF ML20198N7961998-01-13013 January 1998 Confirms Rev to Time of NRC Oversight Panel Meeting for LaSalle County Station.Meeting Will Be Conducted on 980126 in Lisle,Il to Discuss Status & Effectiveness of Restart Plan Plant Performance Improvement Actions ML20197A8901997-12-16016 December 1997 Forwards Plant Restart Action Plan,For Review & Approval. Restart Action Plan Status Will Be Updated on as Required Basis ML20217D4261997-09-30030 September 1997 Informs of Scheduled Visits W/Nuclear Services at Gpu on Nov 14th & Visit at Commonwealth Edison on Dec 3rd & Would Like to Receive Any Info Available.Supporting Documentation Encl ML20211D6721997-09-15015 September 1997 Provides NRR Concurrence to Remove Big Rock Point from SALP Program,To Extend Current Point Beach SALP Cycle from 15 to 19 Months & to Extend Current LaSalle County Station SALP Cycle to Approx Six Months Following Restart of Either Unit ML20211D7661997-09-0303 September 1997 Informs of Intent & Rationale for Extending Current LaSalle County Station SALP Cycle to Approx Six Months Following Restart of Either Unit ML20217D5461997-04-18018 April 1997 Forwards Partially Withheld Background Briefing Package in Preparation for 970425 Meeting Between Comed & Commission IA-97-178, Forwards Partially Withheld Background Briefing Package in Preparation for 970425 Meeting Between Comed & Commission1997-04-18018 April 1997 Forwards Partially Withheld Background Briefing Package in Preparation for 970425 Meeting Between Comed & Commission ML20147J2391997-04-0909 April 1997 Notification of Meeting on 970416 W/Util in Rockville,Md to Discuss Overall Response & Present Addl Details Re Performance Indicators Used to Monitor Performance Stations ML20136C1031997-03-0606 March 1997 Forwards Correspondence Transmitted Via Internet to J Zwolinski from P Blanch During 970102-31.Requests Correspondence Be Placed in PDR ML20138J7671997-02-0505 February 1997 Informs That NRC Plans to Administer Generic Fundamentals Exam Section of Written Operator Licenseing Exam on 970409. Ltr W/Copy to Chief,Operator Licensing Branch Must Be Submitted to Listed Address in Order to Register Personnel ML20149M6901997-01-19019 January 1997 Notification of 970128 Meeting W/Commonwealth Edison Co to Discuss Licensee Proposed Program for Use of Mixed Oxide Fuel ML20134E8811996-12-27027 December 1996 Submits Dates Requested Re Plants ML20134E9141996-12-18018 December 1996 Discusses Highlights of Independent Self Assessment Exit Meeting ML20134E9071996-12-17017 December 1996 Submits Draft Highlights on Licensee Independent Self Assessment Exit Meeting & Decision to Extend Outages ML20134E8581996-12-16016 December 1996 Forwards Highlights from Exit Meeting for LaSalle Independent Safety Assessment ML20134E8261996-12-16016 December 1996 Forwards Highlights from Exit Meeting for LaSalle Independent Safety Assessment ML20134E8401996-12-16016 December 1996 Discusses Highlights from LaSalle Independent Safety Assessment Exit Mtg ML20210N4271996-12-0202 December 1996 Informs About Drop in Meeting on 961203 for Update on Industry Restructuring & Deregulation,Unicom Strategic Planning & Mixed Oxide Fuel ML20217D5421996-11-27027 November 1996 Forwards Partially Withheld Background Briefing Package in Preparation for 961203 Meeting Between Comed,Nuclear Strategic Services & Chairman Jackson ML20129J4781996-11-0404 November 1996 Summarizes 961030 Operating Reactors Events Briefing 96-14 Re Notification of Senior Managers from Commission,Oe,Aeod, Res,Nrr & Regional Offices of Selected Events That Occurred Since 961023 Briefing.List of Attendees Encl ML20210N3761996-08-12012 August 1996 Informs About Meeting on 960513 to Brief Chairman Jackson on Comed Response to Deregulation ML20217D4761996-07-31031 July 1996 Forwards Background Briefing Package in Prepartion of 960813 Meeting Between Commonwealth Edison Co & Chairman Jackson. Purpose of Visit to Discuss Recent Organizational Changes at Comed & Company Mgt Focus for Immediate Future ML20210N3381996-05-14014 May 1996 Discusses Courtesy Visit to Ceco on 960513 Re Listed Plants ML20210N2681995-11-13013 November 1995 Discusses Paritially Withheld Chairman Briefing by Ceco on 951116 ML20217D5321995-11-0909 November 1995 Forwards Partially Withheld Background Briefing Package in Preparation for 951116 Meeting Between Commission & Senior Comed Mgt.Purpose of Visit to Discuss Performance at Each of Sites & Challenges & Issues Needed to Be Addressed ML20210N3971995-10-12012 October 1995 Informs of Courtesy Visit on 951011 to Util to Discuss Listed Topics.List of Attendees Encl ML20210N3701995-10-0505 October 1995 Forwards Background Briefing Package in Preparation for 951011 Meeting W/Company Executives & Chairmam Jackson ML20134B5061994-04-13013 April 1994 Submits Plants Which Will Be Discussed in Categories Indicated Re Results of Screening Meetings for June 1994. Partially Deleted ML20059H2941994-01-21021 January 1994 Notification of Significant Licensee Meeting W/Util on 940201 in Lisle,Il to Discuss Failure to Take Prompt C/A for Hardened Grease in 4 Kv & 6.9 Kv Circuit Breakers Following 10CFR21 Notification & Oct 1992 Breaker Failure ML20058N4811993-12-15015 December 1993 Informs of Decision to Expand Senior Mgt Oversight of Selected Plants,Per Recent Meeting W/J Martin & H Miller. Lists Assignment of Managers,Effective Immediately IR 05000373/19930331993-11-23023 November 1993 Notification of 931130 Enforcement Conference in Region III Ofc to Discuss Fitness for Duty Issue as Discussed in Insp Repts 50-373/93-33 & 50-374/93-33 ML20062J4501993-10-27027 October 1993 Requests Addl Info Re Proposed EAL Changes in Util Generating Station Emergency Plan Annexes.Proposed EALs Reviewed Against Guidance in NUMARC/NESP-007,rev 2, Methodology for Development of Eals ML20059A4651993-10-20020 October 1993 Notification of Significant Licensee Meeting W/Util in Glen Ellyn,Il on 931104 to Review Status of Util Initiatives on QA & Corporate Engineering Support ML20057F2751993-10-13013 October 1993 Notification of 931021 Meeting W/Util in Rockville,Md to Discuss Util Mod to Address NRC Bulletin 93-03, Resolution of Issues Re Reactor Vessel Water Level Instrumentation in BWR, for Plant ML20057C9801993-09-27027 September 1993 Discusses 930927 Press Conference Re J O'Connor Announcement That Util Settled Six Rate Matters & Appeals Before Illinois Courts & Commerce Commission by Agreeing to Refund Listed Amount to Customers Over Next 12 Months ML20128E4961993-02-0505 February 1993 Notification of 930211 Meeting W/Util in Chicago,Il to Discuss Elimination of Operating Basis Earthquake Requirements for Pipe Ruptures ML20128C2901993-01-29029 January 1993 Notification of 930201 Meeting W/Licensee in Rockville,Md to Discuss Current Status of Licensing Activities at Plant ML20055C3521990-02-26026 February 1990 Notification of 900305 Meeting W/Util in Rockville,Md to Discuss Status of Licensing Activities for Facility ML20248E9391989-09-29029 September 1989 Forwards AEOD Technical Review Rept on Debris in Containment Recirculation Pumps.No Occurrences Found to Involve Actual Accumulation of Debris in Containment Sumps.Immediate Corrective Actions Completed ML20248C8311989-09-20020 September 1989 Request for Hearing by Alchemie.* Forwards Response & Request for Hearing,In Response to NRC 890818 Order Modifying License & Order to Show Cause Why Licenses Should Not Be Revoked,For Appropriate Action ML20247H9261989-09-0909 September 1989 Advises That SALP Meeting for Facilities Scheduled for 891115.Assessment Input Should Be Submitted by 891016 1999-09-01
[Table view] Category:MEMORANDUMS-CORRESPONDENCE
MONTHYEARML20217M5311999-10-25025 October 1999 Notification of 991103 Meeting with Util in Rockville,Md to Discuss Licensee Analytical Approach in Design of Pipe Supports at Plant ML20217C9051999-10-12012 October 1999 Forwards SER Input Approving License Request for Amend to Plant,Units 1 & 2.Licensee Proposal to Modify Definition of Core Alteration in Section 1.0 of TS & Update Sections 3/4.1,3.4.3 & 3/4.9 to Reflect Proposed Definition Change ML20211K8611999-09-0101 September 1999 Informs That There Has Been Some Confusion Re Recently Issued ODCM Generic Section Rev Which Needs to Be Clarified. Clarifications Are Listed ML20210P1361999-08-0404 August 1999 Notification of 990817 Meeting with Util in Rockville, Maryland to Discuss Status of Licensing Actions Submitted by Comm Ed & Plan for Proposed Licensing Workshop ML20237E3131998-08-26026 August 1998 Forwards for Public Release,Info Re NRC SMM Held on 980714-15.Summary of January 1998 NRC SMM & Watch List Removal Evaluation Factors Also Encl ML20237D9721998-08-11011 August 1998 Notification of Cancelled Licensee Meeting W/Util on 980903 to Discuss Effectiveness of Performance Improvement Initiatives & Progress Toward LaSalle Unit 1 Restart ML20237D9751998-08-11011 August 1998 Notification of Cancelled Licensee Meeting W/Util to Discuss Effectiveness of Performance Improvement Initiatives & Progress Toward LaSalle Unit 1 Restart ML20237D9821998-08-11011 August 1998 Notification of Licensee Meeting W/Util on 980915 to Discuss Status of LaSalle Unit 1 & Performance Improvement & Restart Plans for LaSalle Unit 2 ML20216H6971998-03-17017 March 1998 Notification of 980326 Meeting W/Commonwealth Edison Co in Lisle,Il to Discuss Comed Request to Consolidate near-site Emergency Operations Facility Into Single Central EOF ML20198N7961998-01-13013 January 1998 Confirms Rev to Time of NRC Oversight Panel Meeting for LaSalle County Station.Meeting Will Be Conducted on 980126 in Lisle,Il to Discuss Status & Effectiveness of Restart Plan Plant Performance Improvement Actions ML20197A8901997-12-16016 December 1997 Forwards Plant Restart Action Plan,For Review & Approval. Restart Action Plan Status Will Be Updated on as Required Basis ML20217D4261997-09-30030 September 1997 Informs of Scheduled Visits W/Nuclear Services at Gpu on Nov 14th & Visit at Commonwealth Edison on Dec 3rd & Would Like to Receive Any Info Available.Supporting Documentation Encl ML20211D6721997-09-15015 September 1997 Provides NRR Concurrence to Remove Big Rock Point from SALP Program,To Extend Current Point Beach SALP Cycle from 15 to 19 Months & to Extend Current LaSalle County Station SALP Cycle to Approx Six Months Following Restart of Either Unit ML20211D7661997-09-0303 September 1997 Informs of Intent & Rationale for Extending Current LaSalle County Station SALP Cycle to Approx Six Months Following Restart of Either Unit IA-97-178, Forwards Partially Withheld Background Briefing Package in Preparation for 970425 Meeting Between Comed & Commission1997-04-18018 April 1997 Forwards Partially Withheld Background Briefing Package in Preparation for 970425 Meeting Between Comed & Commission ML20217D5461997-04-18018 April 1997 Forwards Partially Withheld Background Briefing Package in Preparation for 970425 Meeting Between Comed & Commission ML20147J2391997-04-0909 April 1997 Notification of Meeting on 970416 W/Util in Rockville,Md to Discuss Overall Response & Present Addl Details Re Performance Indicators Used to Monitor Performance Stations ML20136C1031997-03-0606 March 1997 Forwards Correspondence Transmitted Via Internet to J Zwolinski from P Blanch During 970102-31.Requests Correspondence Be Placed in PDR ML20138J7671997-02-0505 February 1997 Informs That NRC Plans to Administer Generic Fundamentals Exam Section of Written Operator Licenseing Exam on 970409. Ltr W/Copy to Chief,Operator Licensing Branch Must Be Submitted to Listed Address in Order to Register Personnel ML20149M6901997-01-19019 January 1997 Notification of 970128 Meeting W/Commonwealth Edison Co to Discuss Licensee Proposed Program for Use of Mixed Oxide Fuel ML20134E8811996-12-27027 December 1996 Submits Dates Requested Re Plants ML20134E9141996-12-18018 December 1996 Discusses Highlights of Independent Self Assessment Exit Meeting ML20134E9071996-12-17017 December 1996 Submits Draft Highlights on Licensee Independent Self Assessment Exit Meeting & Decision to Extend Outages ML20134E8581996-12-16016 December 1996 Forwards Highlights from Exit Meeting for LaSalle Independent Safety Assessment ML20134E8401996-12-16016 December 1996 Discusses Highlights from LaSalle Independent Safety Assessment Exit Mtg ML20134E8261996-12-16016 December 1996 Forwards Highlights from Exit Meeting for LaSalle Independent Safety Assessment ML20210N4271996-12-0202 December 1996 Informs About Drop in Meeting on 961203 for Update on Industry Restructuring & Deregulation,Unicom Strategic Planning & Mixed Oxide Fuel ML20217D5421996-11-27027 November 1996 Forwards Partially Withheld Background Briefing Package in Preparation for 961203 Meeting Between Comed,Nuclear Strategic Services & Chairman Jackson ML20129J4781996-11-0404 November 1996 Summarizes 961030 Operating Reactors Events Briefing 96-14 Re Notification of Senior Managers from Commission,Oe,Aeod, Res,Nrr & Regional Offices of Selected Events That Occurred Since 961023 Briefing.List of Attendees Encl ML20210N3761996-08-12012 August 1996 Informs About Meeting on 960513 to Brief Chairman Jackson on Comed Response to Deregulation ML20217D4761996-07-31031 July 1996 Forwards Background Briefing Package in Prepartion of 960813 Meeting Between Commonwealth Edison Co & Chairman Jackson. Purpose of Visit to Discuss Recent Organizational Changes at Comed & Company Mgt Focus for Immediate Future ML20210N3381996-05-14014 May 1996 Discusses Courtesy Visit to Ceco on 960513 Re Listed Plants ML20210N2681995-11-13013 November 1995 Discusses Paritially Withheld Chairman Briefing by Ceco on 951116 ML20217D5321995-11-0909 November 1995 Forwards Partially Withheld Background Briefing Package in Preparation for 951116 Meeting Between Commission & Senior Comed Mgt.Purpose of Visit to Discuss Performance at Each of Sites & Challenges & Issues Needed to Be Addressed ML20210N3971995-10-12012 October 1995 Informs of Courtesy Visit on 951011 to Util to Discuss Listed Topics.List of Attendees Encl ML20210N3701995-10-0505 October 1995 Forwards Background Briefing Package in Preparation for 951011 Meeting W/Company Executives & Chairmam Jackson ML20134B5061994-04-13013 April 1994 Submits Plants Which Will Be Discussed in Categories Indicated Re Results of Screening Meetings for June 1994. Partially Deleted ML20059H2941994-01-21021 January 1994 Notification of Significant Licensee Meeting W/Util on 940201 in Lisle,Il to Discuss Failure to Take Prompt C/A for Hardened Grease in 4 Kv & 6.9 Kv Circuit Breakers Following 10CFR21 Notification & Oct 1992 Breaker Failure ML20058N4811993-12-15015 December 1993 Informs of Decision to Expand Senior Mgt Oversight of Selected Plants,Per Recent Meeting W/J Martin & H Miller. Lists Assignment of Managers,Effective Immediately IR 05000373/19930331993-11-23023 November 1993 Notification of 931130 Enforcement Conference in Region III Ofc to Discuss Fitness for Duty Issue as Discussed in Insp Repts 50-373/93-33 & 50-374/93-33 ML20062J4501993-10-27027 October 1993 Requests Addl Info Re Proposed EAL Changes in Util Generating Station Emergency Plan Annexes.Proposed EALs Reviewed Against Guidance in NUMARC/NESP-007,rev 2, Methodology for Development of Eals ML20059A4651993-10-20020 October 1993 Notification of Significant Licensee Meeting W/Util in Glen Ellyn,Il on 931104 to Review Status of Util Initiatives on QA & Corporate Engineering Support ML20057F2751993-10-13013 October 1993 Notification of 931021 Meeting W/Util in Rockville,Md to Discuss Util Mod to Address NRC Bulletin 93-03, Resolution of Issues Re Reactor Vessel Water Level Instrumentation in BWR, for Plant ML20057C9801993-09-27027 September 1993 Discusses 930927 Press Conference Re J O'Connor Announcement That Util Settled Six Rate Matters & Appeals Before Illinois Courts & Commerce Commission by Agreeing to Refund Listed Amount to Customers Over Next 12 Months ML20128E4961993-02-0505 February 1993 Notification of 930211 Meeting W/Util in Chicago,Il to Discuss Elimination of Operating Basis Earthquake Requirements for Pipe Ruptures ML20128C2901993-01-29029 January 1993 Notification of 930201 Meeting W/Licensee in Rockville,Md to Discuss Current Status of Licensing Activities at Plant ML20055C3521990-02-26026 February 1990 Notification of 900305 Meeting W/Util in Rockville,Md to Discuss Status of Licensing Activities for Facility ML20248E9391989-09-29029 September 1989 Forwards AEOD Technical Review Rept on Debris in Containment Recirculation Pumps.No Occurrences Found to Involve Actual Accumulation of Debris in Containment Sumps.Immediate Corrective Actions Completed ML20248C8311989-09-20020 September 1989 Request for Hearing by Alchemie.* Forwards Response & Request for Hearing,In Response to NRC 890818 Order Modifying License & Order to Show Cause Why Licenses Should Not Be Revoked,For Appropriate Action ML20247H9261989-09-0909 September 1989 Advises That SALP Meeting for Facilities Scheduled for 891115.Assessment Input Should Be Submitted by 891016 1999-09-01
[Table view] |
Text
i
. .. i(L... -i
- ... e 9" "' C
%- g PRINCIP S_T/JF f 5 9,( d j . NUCLEAR REGULATORY COMMISSION
-5
- .p ny WASHWGTON, D. C. 20555 7/D gg,
\ ***
[ //}qKC 0 4 ggO [ '
9Od 4,nt Ak M g 3 3 1981 " It M DESTI prP
~
W ?!le
~~~~
Docket No. 50-373 b o- [d MEMORANDUM FOR: [L. Spessard, Director, Division of Resident and N ""
- Project Inspection, RIII arrs .+ o g s .J u c.o. ~
FROM: R. L. Baer, Chief, Reactor Engineering Branch, DRRRI . _ _ . _
SUBJECT:
TESTING OF STANDBY GAS TREATMENT SYSTEMS AT LASALLE (AITS F03096680H07)
Your memorandum to E. Jordan dated August 14, 1980, requested a review of the testing requirements for the Standby Gas Treatment System (SGTS) at LaSalle. The concerns relate to leak testing of the SGTS during the preoperational phase, subsequent periodic inservice testingr and : leak' testing following maintenance activities.
A review of the Standard Review Plan Section 6.5.1, Paragraph II44.f and the referenced ANSI standards N509-1976 (Section 5.6) and N510-1975 (Section 6) indicates that leak testing of the filter housing and ductwork is required after installation. In discussion with D. Bangart and R. Bellamy, Effluent Treatment Systems Branch, NRR, it was agreed that LaSalle should perform an appropriate leak test of the filter housing and ductwork after installation.
H. Wong of nty staff has discussed this position with F. Reimann, Region III, and we note that Inspection Report 50-373/80-49 maintains this issue ~as an ,
"Open Item."
In regard to periodic or post-maintenance leak testing, we have discussed this with the Effluent Treatment Systems Branch and come to the conclusion that this leak testing is not required. The bases for this determination is: 1) the use of all-welded construction reduces the potential for leakage,
- 2) initial pre-operational pressure testing would identify installation /
construction deficiencies, 3) leakage could be observed or heard during the routine use or testing of the SGTS, 4) area radiation monitors are in place that would detect leakage under abnormal circumstances and the affected SGTS train would be isolated preventing additional leakage to the reactor building, and 5) neither ANSI standard N509-1976 nor N510-1975 specify periodic or post-maintenance leak testing.
Based on recent discusWns with F. Reimann, we understand that a followup i
hyuL _
CONTACT: H. J. Wong, IE 'U '
49-24767 p T <bFJ1 Il
, ht2.%osoD < [7j AUG 2 01981 a p {
pa- ; )q
b.
R. L spessard inspection is planned in order to assure that leak, testing of the installed housing and ductwork has been performed. It you have additional questions, please contact this office. l We consider this Action Item F03096680 closed.
Whff R. L. Baer, Chief Reactor Engineering Branch DRRRI cc: E. Blackwood, IE E. Gallagher, IE F. Reimann, RIII W. Gammill, NRR R. Bangart, NRR R. Bellamy, NRR A. Bournia, NRR 1
y , .
k.
~
$. m %4
.c UNITED STATES l' NUCLEAR REGULATORY COMMISSION y, f ,i WASHINGT ON, D. C. 20555 g -
k ,,..* 'JAN 11 1983 MEMORANDUM FOR: J. Sniezek, Director, Division of Resident and Regional Inspection, IE FROM: R. Mattson, Director, Division of Systems Integration, NRR
SUBJECT:
.f CLARIFICATION OF APPENDIX J REQUIREMENT 5 - DEFINITION OF TYPE A TEST FAILURES PIFERENCE: Memorandum from J. H. Sniezek to R. J. Mattson, " Request for Clarification of Provisions to 10 CFR Part 50, Appen-dix J," dated December 29, 1981 Sections III.D.1.a. III.D.2.a and III,D.3.a of Appendix J require that a set of three periodic Type A tests be performed at approximately equal intervals during each 10-year service period, and that Type B and Type C tests be per- -
formed during reactor shutdown for refueling but in no case at intervals greater than two years. Under these test requirements, there are many occa-sions when Type A, B and C tests must be performed during the same reactor shutdown period. Questions are frequently raised concerning the correct se-quence of conducting the Type A. Type B and C tests, and the potential impact-on the success or failure of a periodic Type A' test. With regard to these questions, the following clarification is provided by the Containment Systems Branch.
Type B and C tests could be performed either prior to the start of or after completion of the periodic Type A test provided that the pre-test requirements of III. A.l.a of Appendix J are met; i.e., no repairs or adjustments.-(ras) to the primary containment boundary are made so that the containment can be tested In as close to the "as is" condition as-practical. As such, the leakage infor- ,
nation obtained from the "as is"'(sometimes called "as found") Type A test can be used to assess the c.ontainment condition and its integrity following a period of plant operation.
If ras, made as a result of the Type B and C testing programs, or other reasons, are made to the primary containment boundary prior to the Type A test sequence, local leak tests must be performed on the affected portion of the containment boundary to determine the leakage rates before and after the P,As. The'"as '
fonnd" Type A test result can then be obtained by adding the differences be-tween the affected path leakages before and after ras, to the overall measured Type A test result. A periodic Type A test should be called a " failure" if the "as found" Type A test result (with or without correction from local leak tests) exceeds 0.75 La (maximum allowable leakage rate).
4WII f6057
Contact:
Y. Huang, CSO:DSI 29424