Concurs W/Proposed Guidance in 830329 Memo Re Licensee QA Audits to Verify Conformance W/Tech Specs.Guidance Consistent W/Provisions of STS Section 6.5.2.8.a
ML20244C833
Person / Time
Issue date: 01/30/1984
From: Partlow J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
To: Spessard R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML16342B348 List: ... further results
References
FOIA-87-121 NUDOCS 8402060269
Download: ML20244C833 (1)


Text

___----_ __ - ___-_ _ _ _ _

^'

' ' a me jNh &l0 UNITED STATES

%g NUCLE AR REGULATORY COMMISSION . z. H^MI^

/

r, W ASHINGTON, D. C. 20555 . ,.

-l

% ,,, , , o January 30, 1984 PAD

-[505 3A AL . /

%F File V MEMORANDUM FOR: Richard L. Spessard, Director Division of Project and Resident Programs, Region III FROM: James G. Partlow, Acting Director Division of Quality Assurance, Safeguards and Inspection Programs Branch Office of Inspection and Enforcement _.

SUBJECT:

QUALITY ASSURANCE AUDITS TO VERIFY CONFORMANCE TO TECHNICAL SPECIFICATIONS PROVISIONS

REFERENCE:

Memorandum, R. L. Spessard to J. M. Taylor, same subject, dated March 29, 1983 We have reviewed your proposed guidance for the conduct of Quality Assurance Audits by the licensee to verify conformance to the technical specification (TS) provisions and agree that the guidance is consistent with our views of an acceptable program as required by Section 6.5.2.8.a of the Standard Technical Specifications. Specifically, we agree that the audit periodicity for each TS area (not every item) should be annual, recognizing that TS areas will vary dependent on the vintage of the licensee's TS. Further, we agree that all applicable line items in the TS should be examined by the auditing organization within a specified period of time.

As a part of a current effort to upgrade our quality assurance 2515 inspection procedures, we plan to incorporate this guidance into future revisions to IE Inspection Procedures. To provide more definitive guidance in this area, an appropriate mechanism may be to include the guidance in future revisions to Regulatory Guide 1.33, " Quality Assurance Program Requirements (Operation),"

and the ANS 3.2 standard, " Administrative Controls and Quality Assurance for Operational Use of Nuclear Power Plants." We will look into the need to upgrade RG 1.33 and ANS 3.2 in this topic area and we will keep you informed of the progress of our efforts, c.

k.hduL t Jares; G. Partlow, Acting Director Div ision of Quality Assurance, Safeguards nd Inspection Programs Of ice of Inspection and Enforcement cc: D. Brinkman, HP,R 1

Contact: