ML20211D672
| ML20211D672 | |
| Person / Time | |
|---|---|
| Site: | Point Beach, Big Rock Point, LaSalle File:Consumers Energy icon.png |
| Issue date: | 09/15/1997 |
| From: | Collins S NRC (Affiliation Not Assigned) |
| To: | Beach A NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| Shared Package | |
| ML20211D674 | List: |
| References | |
| NUDOCS 9709290201 | |
| Download: ML20211D672 (1) | |
Text
-___-__ _ ----
September 15, 1997
,ygg
$0~5 Nf MEMORANDUM T0:
A. Bill Beach, Regional Administrator Region III FROM:
Samuel J. Collins, Director [ Original signed by:]
Office of Nuclear Reactor Regulation
SUBJECT:
NRR CONCURRENCE ON REGION 111 SALP PROGRAM CHANGES The purpose of this memorandum is to provide NRR concurrence to remove Big Rock Point from the SALP program, to extend the current Point Beach SALP cycle from 15 to 19 months, and to extend the current LaSalle County Station SALP cycle to approximately six months following restart of either unit.
Your justifications (attached) were consistent with the guidance in NRC Management Directive 8.6.
Attachments: As stated Distribution:
(YT #0970137)
Central Files PIPB R/F LJCallan HLThompson FJMiraglia RPZimmermar.
JWRce g
BSheron h hg j EAdensam l
PUBLIC NRC RE CTP 08Py DOCUMENT NAME:
G:\\SECY2\\SALPMEMO.BRP T r.
iv.. copy. thi. docum.ni. indic.t. in th. box: c - copy withoudclosures *E' = Copy with eylosures *N" 0FFICE PIPB: DISP JE PIPB: DISP E
PIPB/$fSP l
6 DISP:W)01 l/J( D:NilR - #
NAME DLGamberonihlb MRJohnson Wihr-$WB&Aardt FPGi$spiefr/ M ins DATE 09/It_/97
~
09/l'l /97 h_ 09/ l2 /97 09/11./97
' k'f,09/\\5 /97 0FFTCIAL RECORD COPY h/
9709290201 970915 PDR ADOCK 05000155
]
F, G
PDR I
llll ll ll ll 1,ll,ll,lll I