ML20134E907
ML20134E907 | |
Person / Time | |
---|---|
Site: | LaSalle ![]() |
Issue date: | 12/17/1996 |
From: | Rossbach L NRC |
To: | NRC |
Shared Package | |
ML20134E767 | List: |
References | |
FOIA-97-4 NUDOCS 9702070147 | |
Download: ML20134E907 (1) | |
Similar Documents at LaSalle | |
---|---|
Category:INTERNAL OR EXTERNAL MEMORANDUM
MONTHYEARML20217M5311999-10-25025 October 1999
[Table view]Notification of 991103 Meeting with Util in Rockville,Md to Discuss Licensee Analytical Approach in Design of Pipe Supports at Plant ML20217C9051999-10-12012 October 1999 Forwards SER Input Approving License Request for Amend to Plant,Units 1 & 2.Licensee Proposal to Modify Definition of Core Alteration in Section 1.0 of TS & Update Sections 3/4.1,3.4.3 & 3/4.9 to Reflect Proposed Definition Change ML17191B4501999-09-17017 September 1999 Notification of 991006 & 07 Licensing Workshop with Util in Downers Grove,Il to Jointly Sponsor Licensing Workshop with Goals of Improving Quality of Licensing Submittals & Improving Licensing Interface ML20211K8611999-09-0101 September 1999 Informs That There Has Been Some Confusion Re Recently Issued ODCM Generic Section Rev Which Needs to Be Clarified. Clarifications Are Listed ML20210P1361999-08-0404 August 1999 Notification of 990817 Meeting with Util in Rockville, Maryland to Discuss Status of Licensing Actions Submitted by Comm Ed & Plan for Proposed Licensing Workshop ML20237E3131998-08-26026 August 1998 Forwards for Public Release,Info Re NRC SMM Held on 980714-15.Summary of January 1998 NRC SMM & Watch List Removal Evaluation Factors Also Encl ML20237D9751998-08-11011 August 1998 Notification of Cancelled Licensee Meeting W/Util to Discuss Effectiveness of Performance Improvement Initiatives & Progress Toward LaSalle Unit 1 Restart ML20237D9821998-08-11011 August 1998 Notification of Licensee Meeting W/Util on 980915 to Discuss Status of LaSalle Unit 1 & Performance Improvement & Restart Plans for LaSalle Unit 2 ML20237D9721998-08-11011 August 1998 Notification of Cancelled Licensee Meeting W/Util on 980903 to Discuss Effectiveness of Performance Improvement Initiatives & Progress Toward LaSalle Unit 1 Restart ML20216H6971998-03-17017 March 1998 Notification of 980326 Meeting W/Commonwealth Edison Co in Lisle,Il to Discuss Comed Request to Consolidate near-site Emergency Operations Facility Into Single Central EOF ML20013F9811998-03-17017 March 1998 Revised Notification of 980326 Meeting W/Util in Lisle,Il to Discuss Util Request to Consolidate near-site EOFs Into Single Central Eof.Notification Reissued to Show Change in Time ML17188A0671998-02-11011 February 1998 Revised Notification of 980305 Meeting W/Util in Rockville, MD to Discuss Com Ed Engineering Issues Such as Design Basis Initiative & 10CFR50.59 Process ML17188A0511998-02-11011 February 1998 Notification of 980305 Meeting W/Util in Rockville,Md to Discuss Comm Ed Engineering Issues Such as Design Basis Initiative & 10CFR50.59 Process ML20198N7961998-01-13013 January 1998 Confirms Rev to Time of NRC Oversight Panel Meeting for LaSalle County Station.Meeting Will Be Conducted on 980126 in Lisle,Il to Discuss Status & Effectiveness of Restart Plan Plant Performance Improvement Actions ML20197A8901997-12-16016 December 1997 Forwards Plant Restart Action Plan,For Review & Approval. Restart Action Plan Status Will Be Updated on as Required Basis ML20217D4261997-09-30030 September 1997 Informs of Scheduled Visits W/Nuclear Services at Gpu on Nov 14th & Visit at Commonwealth Edison on Dec 3rd & Would Like to Receive Any Info Available.Supporting Documentation Encl ML17187B1161997-09-15015 September 1997 Notification of 970922 Meeting W/Util in Rockville,Md to Discuss Util Performance Indicators ML20211D6721997-09-15015 September 1997 Provides NRR Concurrence to Remove Big Rock Point from SALP Program,To Extend Current Point Beach SALP Cycle from 15 to 19 Months & to Extend Current LaSalle County Station SALP Cycle to Approx Six Months Following Restart of Either Unit ML20211D7661997-09-0303 September 1997 Informs of Intent & Rationale for Extending Current LaSalle County Station SALP Cycle to Approx Six Months Following Restart of Either Unit ML17187B0111997-06-10010 June 1997 Notification of 970616 Meeting W/Ce in Rockville,Md to Discuss CE Resolution of Bulletin 96-003 Re New ECCS Suction Strainers for Listed Facilities IA-97-178, Forwards Partially Withheld Background Briefing Package in Preparation for 970425 Meeting Between Comed & Commission1997-04-18018 April 1997 Forwards Partially Withheld Background Briefing Package in Preparation for 970425 Meeting Between Comed & Commission ML20217D5461997-04-18018 April 1997 Forwards Partially Withheld Background Briefing Package in Preparation for 970425 Meeting Between Comed & Commission ML20147J2391997-04-0909 April 1997 Notification of Meeting on 970416 W/Util in Rockville,Md to Discuss Overall Response & Present Addl Details Re Performance Indicators Used to Monitor Performance Stations ML20136C1031997-03-0606 March 1997 Forwards Correspondence Transmitted Via Internet to J Zwolinski from P Blanch During 970102-31.Requests Correspondence Be Placed in PDR ML20138J7671997-02-0505 February 1997 Informs That NRC Plans to Administer Generic Fundamentals Exam Section of Written Operator Licenseing Exam on 970409. Ltr W/Copy to Chief,Operator Licensing Branch Must Be Submitted to Listed Address in Order to Register Personnel ML20149M6901997-01-19019 January 1997 Notification of 970128 Meeting W/Commonwealth Edison Co to Discuss Licensee Proposed Program for Use of Mixed Oxide Fuel ML20134E8811996-12-27027 December 1996 Submits Dates Requested Re Plants ML20134E9141996-12-18018 December 1996 Discusses Highlights of Independent Self Assessment Exit Meeting ML20134E9071996-12-17017 December 1996 Submits Draft Highlights on Licensee Independent Self Assessment Exit Meeting & Decision to Extend Outages ML20134E8261996-12-16016 December 1996 Forwards Highlights from Exit Meeting for LaSalle Independent Safety Assessment ML20134E8401996-12-16016 December 1996 Discusses Highlights from LaSalle Independent Safety Assessment Exit Mtg ML20134E8581996-12-16016 December 1996 Forwards Highlights from Exit Meeting for LaSalle Independent Safety Assessment ML20210N4271996-12-0202 December 1996 Informs About Drop in Meeting on 961203 for Update on Industry Restructuring & Deregulation,Unicom Strategic Planning & Mixed Oxide Fuel ML20217D5421996-11-27027 November 1996 Forwards Partially Withheld Background Briefing Package in Preparation for 961203 Meeting Between Comed,Nuclear Strategic Services & Chairman Jackson ML20129J4781996-11-0404 November 1996 Summarizes 961030 Operating Reactors Events Briefing 96-14 Re Notification of Senior Managers from Commission,Oe,Aeod, Res,Nrr & Regional Offices of Selected Events That Occurred Since 961023 Briefing.List of Attendees Encl ML20210N3761996-08-12012 August 1996 Informs About Meeting on 960513 to Brief Chairman Jackson on Comed Response to Deregulation ML20217D4761996-07-31031 July 1996 Forwards Background Briefing Package in Prepartion of 960813 Meeting Between Commonwealth Edison Co & Chairman Jackson. Purpose of Visit to Discuss Recent Organizational Changes at Comed & Company Mgt Focus for Immediate Future ML20210N3381996-05-14014 May 1996 Discusses Courtesy Visit to Ceco on 960513 Re Listed Plants ML17180B4501995-11-13013 November 1995 Notification of 951129 Meeting W/Util in Rockville,Md to Discuss Methodology for Forecasting Loads for Electrical Grid ML20210N2681995-11-13013 November 1995 Discusses Paritially Withheld Chairman Briefing by Ceco on 951116 ML20217D5321995-11-0909 November 1995 Forwards Partially Withheld Background Briefing Package in Preparation for 951116 Meeting Between Commission & Senior Comed Mgt.Purpose of Visit to Discuss Performance at Each of Sites & Challenges & Issues Needed to Be Addressed ML20210N3971995-10-12012 October 1995 Informs of Courtesy Visit on 951011 to Util to Discuss Listed Topics.List of Attendees Encl ML20210N3701995-10-0505 October 1995 Forwards Background Briefing Package in Preparation for 951011 Meeting W/Company Executives & Chairmam Jackson ML17180B1731995-04-20020 April 1995 Notification of Significant Licensee Meeting W/Util on on 950502 to Discuss Status of CE Nuclear Power Station ML17180B1121995-03-0202 March 1995 Notification of Significant Licensee Meeting W/Util on 950308 to Discuss Util Engineering Initiatives ML17180B1061995-02-23023 February 1995 Notification of 950315-16 Meeting W/Util in Rockville,Md to Discuss MOV Program ML17180B0011994-11-0404 November 1994 Notification of 941206 Meeting W/Util & NRC in Rockville,Md to Discuss Performance of Licensee Plants ML17180B0291994-11-0404 November 1994 Notification of Cancelled 941206 Meeting W/Util in Rockville,Md to Discuss Performance of Plants ML17180A9571994-10-0606 October 1994 Notification of 941019 Meeting W/Licensee in Rockville,Md to Discuss Util long-term Implementation of Centralized EOF ML17180A9521994-10-0606 October 1994 Notification of 941019 Meeting W/Util in Rockville,Md to Discuss Plant Request for Use of Corporate EOF as Interim EOF 1999-09-17 Category:MEMORANDUMS-CORRESPONDENCE MONTHYEARML20217M5311999-10-25025 October 1999
[Table view]Notification of 991103 Meeting with Util in Rockville,Md to Discuss Licensee Analytical Approach in Design of Pipe Supports at Plant ML20217C9051999-10-12012 October 1999 Forwards SER Input Approving License Request for Amend to Plant,Units 1 & 2.Licensee Proposal to Modify Definition of Core Alteration in Section 1.0 of TS & Update Sections 3/4.1,3.4.3 & 3/4.9 to Reflect Proposed Definition Change ML17191B4501999-09-17017 September 1999 Notification of 991006 & 07 Licensing Workshop with Util in Downers Grove,Il to Jointly Sponsor Licensing Workshop with Goals of Improving Quality of Licensing Submittals & Improving Licensing Interface ML20211K8611999-09-0101 September 1999 Informs That There Has Been Some Confusion Re Recently Issued ODCM Generic Section Rev Which Needs to Be Clarified. Clarifications Are Listed ML20210P1361999-08-0404 August 1999 Notification of 990817 Meeting with Util in Rockville, Maryland to Discuss Status of Licensing Actions Submitted by Comm Ed & Plan for Proposed Licensing Workshop ML20237E3131998-08-26026 August 1998 Forwards for Public Release,Info Re NRC SMM Held on 980714-15.Summary of January 1998 NRC SMM & Watch List Removal Evaluation Factors Also Encl ML20237D9751998-08-11011 August 1998 Notification of Cancelled Licensee Meeting W/Util to Discuss Effectiveness of Performance Improvement Initiatives & Progress Toward LaSalle Unit 1 Restart ML20237D9821998-08-11011 August 1998 Notification of Licensee Meeting W/Util on 980915 to Discuss Status of LaSalle Unit 1 & Performance Improvement & Restart Plans for LaSalle Unit 2 ML20237D9721998-08-11011 August 1998 Notification of Cancelled Licensee Meeting W/Util on 980903 to Discuss Effectiveness of Performance Improvement Initiatives & Progress Toward LaSalle Unit 1 Restart ML20216H6971998-03-17017 March 1998 Notification of 980326 Meeting W/Commonwealth Edison Co in Lisle,Il to Discuss Comed Request to Consolidate near-site Emergency Operations Facility Into Single Central EOF ML20013F9811998-03-17017 March 1998 Revised Notification of 980326 Meeting W/Util in Lisle,Il to Discuss Util Request to Consolidate near-site EOFs Into Single Central Eof.Notification Reissued to Show Change in Time ML17188A0671998-02-11011 February 1998 Revised Notification of 980305 Meeting W/Util in Rockville, MD to Discuss Com Ed Engineering Issues Such as Design Basis Initiative & 10CFR50.59 Process ML17188A0511998-02-11011 February 1998 Notification of 980305 Meeting W/Util in Rockville,Md to Discuss Comm Ed Engineering Issues Such as Design Basis Initiative & 10CFR50.59 Process ML20198N7961998-01-13013 January 1998 Confirms Rev to Time of NRC Oversight Panel Meeting for LaSalle County Station.Meeting Will Be Conducted on 980126 in Lisle,Il to Discuss Status & Effectiveness of Restart Plan Plant Performance Improvement Actions ML20197A8901997-12-16016 December 1997 Forwards Plant Restart Action Plan,For Review & Approval. Restart Action Plan Status Will Be Updated on as Required Basis ML20217D4261997-09-30030 September 1997 Informs of Scheduled Visits W/Nuclear Services at Gpu on Nov 14th & Visit at Commonwealth Edison on Dec 3rd & Would Like to Receive Any Info Available.Supporting Documentation Encl ML17187B1161997-09-15015 September 1997 Notification of 970922 Meeting W/Util in Rockville,Md to Discuss Util Performance Indicators ML20211D6721997-09-15015 September 1997 Provides NRR Concurrence to Remove Big Rock Point from SALP Program,To Extend Current Point Beach SALP Cycle from 15 to 19 Months & to Extend Current LaSalle County Station SALP Cycle to Approx Six Months Following Restart of Either Unit ML20211D7661997-09-0303 September 1997 Informs of Intent & Rationale for Extending Current LaSalle County Station SALP Cycle to Approx Six Months Following Restart of Either Unit ML17187B0111997-06-10010 June 1997 Notification of 970616 Meeting W/Ce in Rockville,Md to Discuss CE Resolution of Bulletin 96-003 Re New ECCS Suction Strainers for Listed Facilities IA-97-178, Forwards Partially Withheld Background Briefing Package in Preparation for 970425 Meeting Between Comed & Commission1997-04-18018 April 1997 Forwards Partially Withheld Background Briefing Package in Preparation for 970425 Meeting Between Comed & Commission ML20217D5461997-04-18018 April 1997 Forwards Partially Withheld Background Briefing Package in Preparation for 970425 Meeting Between Comed & Commission ML20147J2391997-04-0909 April 1997 Notification of Meeting on 970416 W/Util in Rockville,Md to Discuss Overall Response & Present Addl Details Re Performance Indicators Used to Monitor Performance Stations ML20136C1031997-03-0606 March 1997 Forwards Correspondence Transmitted Via Internet to J Zwolinski from P Blanch During 970102-31.Requests Correspondence Be Placed in PDR ML20138J7671997-02-0505 February 1997 Informs That NRC Plans to Administer Generic Fundamentals Exam Section of Written Operator Licenseing Exam on 970409. Ltr W/Copy to Chief,Operator Licensing Branch Must Be Submitted to Listed Address in Order to Register Personnel ML20149M6901997-01-19019 January 1997 Notification of 970128 Meeting W/Commonwealth Edison Co to Discuss Licensee Proposed Program for Use of Mixed Oxide Fuel ML20134E8811996-12-27027 December 1996 Submits Dates Requested Re Plants ML20134E9141996-12-18018 December 1996 Discusses Highlights of Independent Self Assessment Exit Meeting ML20134E9071996-12-17017 December 1996 Submits Draft Highlights on Licensee Independent Self Assessment Exit Meeting & Decision to Extend Outages ML20134E8261996-12-16016 December 1996 Forwards Highlights from Exit Meeting for LaSalle Independent Safety Assessment ML20134E8401996-12-16016 December 1996 Discusses Highlights from LaSalle Independent Safety Assessment Exit Mtg ML20134E8581996-12-16016 December 1996 Forwards Highlights from Exit Meeting for LaSalle Independent Safety Assessment ML20210N4271996-12-0202 December 1996 Informs About Drop in Meeting on 961203 for Update on Industry Restructuring & Deregulation,Unicom Strategic Planning & Mixed Oxide Fuel ML20217D5421996-11-27027 November 1996 Forwards Partially Withheld Background Briefing Package in Preparation for 961203 Meeting Between Comed,Nuclear Strategic Services & Chairman Jackson ML20129J4781996-11-0404 November 1996 Summarizes 961030 Operating Reactors Events Briefing 96-14 Re Notification of Senior Managers from Commission,Oe,Aeod, Res,Nrr & Regional Offices of Selected Events That Occurred Since 961023 Briefing.List of Attendees Encl ML20210N3761996-08-12012 August 1996 Informs About Meeting on 960513 to Brief Chairman Jackson on Comed Response to Deregulation ML20217D4761996-07-31031 July 1996 Forwards Background Briefing Package in Prepartion of 960813 Meeting Between Commonwealth Edison Co & Chairman Jackson. Purpose of Visit to Discuss Recent Organizational Changes at Comed & Company Mgt Focus for Immediate Future ML20210N3381996-05-14014 May 1996 Discusses Courtesy Visit to Ceco on 960513 Re Listed Plants ML17180B4501995-11-13013 November 1995 Notification of 951129 Meeting W/Util in Rockville,Md to Discuss Methodology for Forecasting Loads for Electrical Grid ML20210N2681995-11-13013 November 1995 Discusses Paritially Withheld Chairman Briefing by Ceco on 951116 ML20217D5321995-11-0909 November 1995 Forwards Partially Withheld Background Briefing Package in Preparation for 951116 Meeting Between Commission & Senior Comed Mgt.Purpose of Visit to Discuss Performance at Each of Sites & Challenges & Issues Needed to Be Addressed ML20210N3971995-10-12012 October 1995 Informs of Courtesy Visit on 951011 to Util to Discuss Listed Topics.List of Attendees Encl ML20210N3701995-10-0505 October 1995 Forwards Background Briefing Package in Preparation for 951011 Meeting W/Company Executives & Chairmam Jackson ML17180B1731995-04-20020 April 1995 Notification of Significant Licensee Meeting W/Util on on 950502 to Discuss Status of CE Nuclear Power Station ML17180B1121995-03-0202 March 1995 Notification of Significant Licensee Meeting W/Util on 950308 to Discuss Util Engineering Initiatives ML17180B1061995-02-23023 February 1995 Notification of 950315-16 Meeting W/Util in Rockville,Md to Discuss MOV Program ML17180B0011994-11-0404 November 1994 Notification of 941206 Meeting W/Util & NRC in Rockville,Md to Discuss Performance of Licensee Plants ML17180B0291994-11-0404 November 1994 Notification of Cancelled 941206 Meeting W/Util in Rockville,Md to Discuss Performance of Plants ML17180A9571994-10-0606 October 1994 Notification of 941019 Meeting W/Licensee in Rockville,Md to Discuss Util long-term Implementation of Centralized EOF ML17180A9521994-10-0606 October 1994 Notification of 941019 Meeting W/Util in Rockville,Md to Discuss Plant Request for Use of Corporate EOF as Interim EOF 1999-09-17 |
Text
..
o g'
O From:'-
Lawrence.Rossbach DMS6 - t h M/a i To:
Date:
12/17/96 7:55am v
Subject:
draft hilite l
LASALLE.' UNITS 1 AND 2,"
Independen't Self Assessment Exit Meeting and Decision to Extend Outages t
The results of-the Independent 1Self Assessment (ISA) for the LaSalle Station
.d were presented at an exit meeting held at the LaSalle Station on December 13,
.1996. ' The ~ISA' is a DET type assessment performed for Commonwealth Edison by a high level team of industry peers and outside consultants.
i h
,The ISA scope included perfo mance in Management and the four functional areas
.of Op'erations, Maintenance; Engineering, and Plant Support.
The ISA assessment was very critical of Comed performance in all areas. Overriding themes included: performance standards missing or not followed, ineffective field supervision,' lack of team work, high management turnover rate and poor change management, inadequate or misapplied resources, inadequate performance indicators, poor: individual performance and work quality, inadequate training, staff not keeping up with improvements in the industry and unaware of poor performance ~, significant problems in work control and control of the licensing and design basis, a weak safety culture.
Approximately 200 persons including station management and a cross section of staff from all departments were present for the exit which was video taped with the expectation that all station personnel will see it.
Later in the day site Vice President W. Subalusky informed R-III Branch Chief M. Dapas that both LaSalle units will remain shutdown until at least June or July of 1997 to resolve these issues.