Final Response to FOIA Request for Documents Re Tech Specs. Forwards App B Documents.App a & B Documents Also Available in PDR
ML20235B268
Person / Time
Site: 05000000
Issue date: 07/01/1987
From: Grimsley D
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
To: Williams O
JRA ASSOCIATES
Shared Package
ML16342B348 List: ... further results
References
FOIA-87-121, RTR-NUREG-0737 NUDOCS 8707090006
Download: ML20235B268 (7)


Text

- - - - . - - - - _ - - - - -

--e.

. /. .g MSPONSE TYPt i RESPONSE TO FREEDOM OF \ ION ^'

I l * '

(s ee.e INFORMATION ACT (FOIA) REQUEST g ig ,

00Catt NUMBERise ut esameom KEOUISTER Ms. Ophelia G. Williams PART i.-RECORDS RELEASED OR NOT LOCATED (See checked bones)

No agency records subpect to the request have been located.

No addrtaonal agency records subpect to the request have been located Agency records subpect to the request that are identifed in Appendix A a,e ai,eady ava,iabie ,o, pubiic it.pect,on and co,ymg in tne NRC Pubi,c Documeni Room.

K 1717 H Street. N W., Washington DC-Agency records subsect to the request v' are identifed m Appendix b are being rnade avadaNe for puNic enspection and copying in the NRC Public Document X liioom,1717 H Street, N.W.. Washington. DC, in a folder under the FolA number and requester name.

The nonproprietary verson of the proposaHal that you agreed a accept m a telephone conversation with a member of my staff is now bemg made svalable for public inspection cnd coying at the NRC Pubhc Document Room,1717 H Street. N W., Washington, DC. an a folder under thia FOIA number and requester name.

Enclosed e information on how you may obtem access to and the charges for copying records placed en t4 NRC Pubiec Document Room.1717 H Street. N W, Washington. DC.

Agsney records subpoet to the request are enclosed Any applicable charge for copes of the records provided and payment procedures are noted era the cuhments secton.

l l F.ecords subsect to the request have been referred to another Federal agencytest for revew and direct response to you.

1 in von of NRC's response to the request, no further acton is being taken on appeal letter dated PART ll.A-INFORMATION WITHHELD FROM FUBLIC DISCLOSURE Ceum informaton in the requested iocords e being withheld from pubhc disclosure pursuant to the FOIA exemptions described in and for the reasons stated in Part l', sec-tarta B. C, and O. Any released portions of the documents for which only part of the record is bemg withheld are being made avadable for public enspection and copymg m

  • .e NRC Public Document Room.1717 H Street, N.W.. Washington OC. in a folder under this FOlA number and requester name.

Comments Since your request involved 3814 hours0.0441 days <br />1.059 hours <br />0.00631 weeks <br />0.00145 months <br /> af search time instead of 40 hours4.62963e-4 days <br />0.0111 hours <br />6.613757e-5 weeks <br />1.522e-5 months <br />, you will receive a reimbursement check in the amount of $21.00.

f I

l j

i i

E707n e oo k M - N;; h iu .oV&oN 6tsANDRicoR05 XA A

k l

l

\

l NRC FORM 464 Pen o is ess

Appendix A

'FO!A 87-121 DOCUMEflTS ALD.EADY Ifl THE PDR Date Description

1. 08/16/82 Memo D. G. Eisenhut to Regional Administrators re:

Proposed Guidance for Calibration and Surveillance Requirements for Equipment Provided to Meet Item II.F.1, Attachments 1, 2 and 3 ~NUREG 0737 ACCESSION NO. 8209270140

2. 11/13/85 Memo R. L. Baer to'C. J. Paperiello re: Effluent Radiation Monitor Calibrations.

ACCESSION NO. 8511180296 ,

~

.a e

l l

1

)

d

I J

Appendix B FOIA 87-121 DOCUMENTS BEING PLACED IN THE PDR Date Description

1. 04/29/77 Memo J. H. Sniezek to Multiple Aodressees re: Minimum Shif t Crew Composition w/ enclosures (4 pages)
2. 06/08/77 Memo F. J. Nolan to R. C. Knop re: Intent of Technical Specification (TS) Requirement Relating to APRM Flux l Trip at Quad Cities - Memorandum dated 5/25/77, Docket No. 50-294 (1 page)
3. 09/08/77 Memo F. J. Nolan to A. B. Davis re: Voluntary Entry l into Technical Specification Action Statements (F14482H1)

(F14529H2) w/ enclosures (7 pages) {

q

4. 12/12/77 Memo F. J. Nolan to Multiple Addressees re: Technical Specifications for Minimum Critical Fower Ratio (MCPR) i w/ enclosures (3 pages)
5. 08/14/80 Memo R. L'. Spessard to E. L. Jordan re: Testin Requirements for Standby Gas Treatment Systems SGTS) l (AITSF03096680) w/ enclosure (2'pages) '
6. 08/27/80 Memo R. F. Heishman to All Members - Reactor Operations and Nuclear Support Branch re: Position on " Licensed  !

Power Level" w/ enclosure (3 pages)

7. 10/02/80 Memo J. F. Streeter to E. L. Jordan re: Possible Design Deficiency in LaSalle Emergency Diesel Generator Air Starting) w/ attachment (3 pages Systems ( AITS - F03110380)
8. 04/16/81 Memo E. B. Blackwood to F. Re.imann re: BWR 5/6 Control i

Rod Drive Scram Testing (AITS F03001881) (2 pages)

9. 08/18/81 Memo R. L. Baer to R. L. Spessard re: Testing of Standby Gas Treatment Systems at LaSalle (AITS F03096680H07) (2 pages)
10. 01/18/82 Memo R. L. Baer to Multiple Addressees re: Clarification of Provisions of Appendix J in 10 CFR 50 w/ enclosures (4 pages)
11. 05/21/82 Memo to File re: Operability of Containment Isolation Valves (2pages)

I

__._______.m.____ _ _ _ _ -__

Appendix 8 (cont'd) FOIA 87-121 DOCUtiENTS BEING PLACED IN THE PDR l

Date Description k

12.  !

10/14/82 Memo re: TIA 82-53 Equipment Qualification Requirements for NUREG-0737 Items (2 pages)

13. 01/03/83 Memo D. G. Eisenhut to C. E. Norelius re: TIA 82-37, Testing of Nomally Closed Check Valves w/ attachments (4 pages) j 14 01/12/83 Memo D. G. Eisenhut to R. Spessard re: Stopwatches t

Calibration and ASME Requirements on Transients Analyses l (2pages) 1

15. 01/28/83 '

Memo C. E. Norelius to D. G. Eisenhut re: Request for j Technical Assistance - Clarification of LaSalle 1 i Technical Specification 3.8.1.2, Action a. (1 page) i

16. 01/31/83 Memo C. E. Norelius to 'D. G. Eisenhut re: Request for Technical Assistance - NRR Position on When an Action l Statement is Entered as a Consequence of Failure to i

Perform Surveillance Tests (1 page) l

17. 02/09/83 Memo C. E. Norelius to D. G. Eisenhut re: Request for j

i Technical Assistance - NRR Position on Shutdown Time i Allowances When an LC0 is Not Met (2 pages) l

18. 02/16/83 l Memo C. E. Norelius to D. G. Eisenhut re: Request j for Technical Assistance - Technical Specification i

Interpretation (AITS F03008283) w/ attachment (5 pages) 1

19. 03/11/83 Memo D. G. Eisenhut to C. E. Norelius re: NRR Position of When an Action Statement is Entered as a Conse of failure to Perfom Surveill& e Tests (1 page)quence
20. 03/22/83 Memo D. G. Eisenhut to C. E. Norelius re: Clarification of LaSalle 1 Technical Specification 3.8.1.2, Action a.

(2pages)

21. 03/23/83 Memo D. G. Eisenhut to C. E. Norelius re: NRR Position i on Shutdown Time Allowances When an LCO is Not Met (2pages)
22. 03/29/83 Memo R. L. Spessard to J. M. Taylor re: Quality Assurance Audits to Verify Conformance to Technical Specification Provisions (2 pages) 1 2

l u_____.__.___ -- - - - - - -- - - - -

Appendix 8 (cont'd) FOIA 87-121 l

DOCUMEllTS BEltlG PLACED IN THE PDR I Date Description

23. 04/01/83 Memo C. E. Norelius to D. G. Eisenhut re: Transfer of Responsibility - Containment Vessel Welds not in Strict Compliance with FSAR Commitments - Perry Nuclear i Power Plant, Units 1 and 2 (2 pages) 24  !

04/20/83 Memo D. G. Eisenhut to C. E. Norelius re: NRR Position i on Component Operability when a Diesel Generator is t Inoperable (2 pages) '

25. 04/22/83 Memo D. G. Eisenhut to C. E. Norelius re: Containment Cooling System Operability for the Kewaunee Nuclear Power Plant w/ enclosures (9 pages)
26. 05/02/83 Memo C. E. Norelius to D. G. Eisenhut re: Request for Technical Assistance to Delineate Appropriate Licensee Actions Following Failure of Certain ECCS/ Containment Isolation Valves (4 pages)
27. 06/29/83 Memo D. G. Eisenhut to C. E. Norelius re: Technical Assistance to Delineate Appropriate Licensee Actions Following Failure of Certain ECCS/ Containment Isolation Valves (4 pages)
28. 07/14/83 Memo C. E. Norelius to D. G. Eisenhut re: Zion Technical Specifications (1page) )
29. 10/07/83 Memo D. G. Eisenhut to C. E. Norelius re: Containment Vessel Welds not in Strict Compliance with FSAR Commitments - Perry Nuclear Power Plant (Units 1 & 2) w/ attachment (10pages)
30. 10/21/83 Memo C. E. Norelius to D. G. Eisenhut re: Request for Technical Assistant-NRR Position on Technical Specifications Interpretation-Primary Containment Allowable Leakage Rates w/ attachment (2pages)
31. 10/28/83 Me c D. G. Eisenhut to C. E. Norelius re: Clarification i of the Term " Deputy Plant Manager" as Used in Generic Letter 82-12 w/ enclosure (4 pages)
32. 01/30/84 Memo J. G. Partlow to R. L. Spessard re: Quality Assurance SpecificationsAudits to Verify Provisions (Conformance to Technical 1 page) 3

q Appendix B (cont'd) F0IA 87-121 DOCUMENTS BEING PLACED IN THE PDR I

Da te Description

33. 02/84 Memo R. L. Spessard to C. E. Norelius re: Testing Requirements of Containment Airlocks at Kewaunee - l Technical Assistance (F03067783) w/ attachment (3 pages)
34. 03/20/84 Memo C. E. Norelius to D. G. Eisenhut re: Request for Assistance - Correction / Clarification of a Technical Specification Discrepancy w/ enclosures (6 pages)
35. 03/30/84 Memo C. J. Paperiello to F. Pagano re: Interpretation of Paragraph 50.72(b)(1)(v) of 10 CFF Part 50 (F003007984) w/ enclosure (3 pages)
36. 04/04/84 Memo D. G. Eisenhut to C. E. Norelius re: Technical Assistance to Establish a Staff Position on a Technical Specifications Interpretations on Prinary Containment Allowable Leakage Rates (TIA-83-102) (3 pages)
37. 05/30/84 Memo D. G. Eisenhut to C. E. Norelius re: NRR Technical Assistance - Interpretation of Technical Specifications Applicable to Vital Buses Powered Fror Non-Class 1E Power Source (Davis-Besse) w/ enclosure (3 pages)
38. 06/21/84 Memo R. C. DeYoung to Multiple Addressees re: Release of IE Inspection Manual to Licensees and the Public w/ enclosure (4 pages)
39. 01/10/85 Memo R. C. DeYoung to Multiple Addressees re: Notifications to the NRC Operations Center and Reporting Events in Licensee Event Reports (3 pages)
40. 04/18/85 Memo H. L. Thompson to R. L. Spessard re: Closure Verification of Nortnally Closed Check Valves During Reoperation Testing at Callaway (TIA 83-117) w/ enclosure (3 pages)
41. 07/08/85 Memo D. M. Crutchfield to Distribution re: Technical Specification Operability Requirements w/ enclosure (7 pages)
42. 07/15/85 Memo H. R. Denton/J. M. Taylor to Multiple Addressees i

re: Relief from Technical Specification LCOs (2 pages) l

43. 11/22/85 Memo H. L. Thompson to Multiple Addressees re: I Technical l Specification Interpretation (2 pages)

{

i 4

l

.)

l Appendix B (cont'd) F0! A 87-121 DOCUMEf4TS BElitG PLACED 1:1 THE PDR Date Description e

44. 12/04/85 Memo E. L. Jordan to W. T. Russell re: Recommended Technical Specification Change Concerning the loss of Control Room Cooling (2 pages)
45. 04/28/86 Memo J. A. Hind to H. L. Thompson, Jr., re: Request for Technical Assistance Regarding Post-Accident Noble Gas Effluent Monitorin w/ attachment (2 pages)g Systems at Callaway
46. 05/27/86 Memo H. R. Denton to C. E. Norelius re: Technical Specification Interpretation on Snubbers (3 pages) l
47. 09/09/86 Memo C. E. Norelius to G. M. Holahan re': Request for Technical Assistance - Additional Clarification of Snubber Technical Specification Requirements (3 pages)
48. 02/10/87 Memo H. R. Denton to Multiple Addressees _re: Interim Commission Policy on Technical Specifications w/ enclosure (18 pages)
49. Undated l Memo D. G. Eisenhut to C. E. Norelius re: LaSalle Unit 1 - Fast Cold Starts of Diesel Generators (1 page) i 5

j i

i I

-. . - . . - . . . . ~ . . .

. \

. .__ i

[ g UNITED STATES

( t! NUCLEAR REGULATORY COMMISSION j

...../ WASHINGTON, D.C. 20555 i

July 30,1987 i e

NOTE FOR: T e DocumentJontrol System i FROM: 'at w b#bth-C rcedom of Information & Privacy i Acts Branch Division of Rules and Records

[ .f

[ ]

r- t

SUBJECT:

F01A-87-121 FROM OPHELIA WILLIAMS '

[

Appendix A to the 7/1/87 letter from Grimsley ' -

)

to Williams -egarding the above-referenced i FOIA request erroneously indicated that two i 1 documents are already available in the Public l' .)

l

' Document Room. In fact, the two documents were l j available in Central Files only. '

j I have cleared the release of the two documents with NRR and these documents can now be placed in the PDR. l-Please change the file code. fok the two documents '

from Central" Files:to PDR availability. L t

Enclosures:

1. 8/16/82 memo from Eisenhut to Regional l Administrators '
2. 11/13/85 memo from Baer to Paperiello ,

1 I

cc: Kathleen Ruhlman, PDR l l' s

l I

Appendix A F0IA 87-121 00CUMEf4TS ALREADY IN THE PDR Date Description

1. 08/16/82 Memo D. G. Eisenhut to Regional Administrators re:

Proposed Guidance.for Calibration and Surveillance Requirements for Equipment Provided to Meet Item-II.F.1, Attachments 1, 2 and 3. NUREG 0737 ACCESSION NO. 8209270140 l 2. 11/13/85. Memo R. L. Baer to'C. J. Paperiello re: Effluent

)

l Radiation Monitor Calibrations ACCESSION NO. 8511180296 I

I 1

1 l

1

!