Forwards Insp Repts 50-348/87-16 & 50-364/87-16 on 870629-0702.No Violations or Deviations Identified
ML20235Y986
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 07/20/1987
From: Dan Collins
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Mcdonald R
ALABAMA POWER CO.
Shared Package
ML20235Y988 List:
References
NUDOCS 8707270136
Download: ML20235Y986 (2)


See also: IR 05000348/1987016

Text

~ - - - - - _ _

.

p

Ohd/bd

j ,% '

.

sta o m7

.

Docket Nos. 50-348, 50-364

License Nos. NPF-2 and NPF-8

Alabama Power Company

ATTN: Mr. R. P. Mcdonald

Senior Vice President

P. 0. Box 2641

Birmingham, AL 35291-0400

Gentlemen:

SUBJECT: NRC INSPECTION REPORT NOS. 50-348/87-16 AND 50-364/87-16

h

This refers to the Nuclear Regulatory Conrnission (NRC) inspection conducted by

T. R. Collins on June 29 - July 2, 1987. The inspection included a review of

activities authorized for your Farley facility. At the conclusion of the

inspection, the findings were discussed with those members of your staff

identified in the enclosed inspection report.

Areas examined during the inspection are identified in the report. Within

these areas, the inspection consisted of selective examinations of procedures

and representative records, interviews with personnel, and observation of

activities in progress.

Within the scope of the inspection, no violations or deviations were

identified.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

-

Title 10, Code of Federal Regulations, a copy of this letter and its enclosure

will be placed in the NRC Public Document Room.

Should you have any questions concerning this letter, piease contact us.

Sincerely,

01 }I1101 Sq)neci bj

87072701g %M4s Douglas M. Collins, Chief I

PDR ADO PDR Emergency Preparedness and

'

O Radiological Protection Branch I

Division of Radition Safety i

and Safeguards ]

Enclosure: (See page 2)

i

I

$

i

_ - - - - - - - - - - - - - - - - - - -

zeoo

_ - - . -_

g .>

.

Alabama Power Company 2

Enclosure:

Inpsection Report

cc w/ encl:

W. O. Whitt, Executive Vice President

J. D. Woodard, General Manager -

Nuclear Plant

W. G. Hairston, III, General Manager -

Nuclear Suppor t

J. W. McGowan, Manager-Safety Audit

and Engineering Review

J. K. Osterhol tz, Supervisor-Safety

Audit and Engineering Review

bcc w/ encl:

NRC Resident Inspector

E. Reeves, Project Manager, NRR

Document Control Desk

State of Alabana

RI RII RII

l TC lins CHosey

b Cd.Y\- fit)

HDance

7/g/87 7/g/87 7/p/87

L _ _ --- - _ _ _ . _ _ _