ML20236M153

From kanterella
Revision as of 04:56, 21 February 2021 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Confirms 870810 Mgt Meeting W/Util in Glen Ellyn,Il to Discuss Util Assessment of Recent Licensed Operator Exam Results & Plans to Implement Corrective Measures to Plant Requalification Program
ML20236M153
Person / Time
Site: Prairie Island  Xcel Energy icon.png
Issue date: 08/05/1987
From: Norelius C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Larson C
NORTHERN STATES POWER CO.
References
NUDOCS 8708100489
Download: ML20236M153 (1)


Text

_ _ _

b/h8 i

AUG 0 51987 Docket No. 50-282 Docket No. 50-306 Northern States Power Company ATTN: Mr. C. E. Larson Vice President, Nuclear Generation 414 Nicollet Mall Minneapolis, MN 55401 Gentlemen:

This confirms plans as discussed on July 31, 1987, between you and Mr. H. Miller '

of our staff, to conduct a management meeting with you and members of your staff at 10:00 a.m. (CDT) on Monday, August 10, 1987, at the U. S. Nuclear Regulatory Conmission Office, 799 Roosevelt Road, Glen Ellyn, Illinois. The purpose of the meeting is to discuss your assessinent of the recent licensed operator examination results and your plans to implement both short term and long term corrective measures:to the Prairie Island requalification program.

We will be glad to discuss any questions you may have concerning this matter.

Sincerely, ORIGINAL SICNED BY C. E. NORELIUS Charles E. Norelius, Director Division of Reactor Projects cc: E. L. Watzl, Plant Manager DCS/RSB (RIDS)

Licensing Fee Management Branch Resident Inspector, RIII Prairie Island Resident Inspector, RIII Monticello John W. Ferman, Ph.D.,

Nuclear Engineer, MPCA State Liaison Officer, State l of Minnesota RI]I RIII RIII RIII MJV DeFpyette/cs 1

7 Gul ' nond s

Burdick 4,

N

-y lus 8/6 /87 8//f/87 8/5/87 8/r /87 8708100489 670805 2 i PDR ADOCK 0500 y

3 53,