ML20246N971

From kanterella
Revision as of 05:43, 12 February 2021 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Insp Repts 50-348/89-08 & 50-364/89-08 on 890410-14.No Violations or Deviations Noted
ML20246N971
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 05/12/1989
From: Dan Collins
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Hairston W
ALABAMA POWER CO.
Shared Package
ML20246N978 List:
References
NUDOCS 8905220048
Download: ML20246N971 (2)


See also: IR 05000348/1989008

Text

. _

. .4

otheial

,-

MAY 121989.

Docket Nos. 50-348, 50-364

License Nos. NPF-2 and NPF-8

Alabama Power Company

ATTN: Mr. W. G. Hairston, III

Senior Vice President-Nuclear

Operations

P. O. Box 2641

Birmingham, AL 35291,-0400

Gentlemen:

. SUBJECT: NRC INSPECTION REPORT NOS. 50-348/89-08 AND 50-364/89-08

This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by

W. B. Gloersen and R. B. Shortridge 'on April 10-14, 1989. The inspection

included a review of activities authorized for your Farley facility. At the

conclusion of the inspection, the findings were discussed with those members of

your staff identified in the enclosed inspection report.

Areas' examined during the inspection are identified in the report. Within

these areas, the inspection consisted of selective examinations of procedures

and representative records, interviews with personnel, and observation of

activities in progress. 1

Within the scope of the inspection, no violations or deviations were

identified.

The enclosed Inspection Report documents an oral commitment (see Paragraph 2.c)

made by a licensee representative and discussed in the exit interview. If your

understanding of this commitment differs from the report statements, please

inform this office promptly. j

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and its enclosure

)j

will be placed in the NRC Public Document Room. l

l

.

!

l

,

o

.

e. .

"" .~_

. hot f

_ , - - _ _ - - - - -

'

..

~ i

W.

./*

,,

e w- l . *i

, _x. .. c .

.

.

Alabama _ Power Company- 2

w-

'LShould you have.any questions concerning this'1etter, please contact us.

. Sincerely,

.

f

Douglas M. Collins,' Chief

Emergency Preparedness and

Radiological Protection Branch

Division'of Radiation Safety

and Safeguards

Enclosure:

, .NRC Inspection Report

cc w/ encl:

B.'M. Guthrie, Executive Vice President

D. N. Morey, General Manager -

Nuclear Plant

J. D. Woodard, Vice President -

Nuclear Generation

J. W. McGowan, Manager-Safety Audit

and Engineering Review

S. Fulmer, Supervisor-Safety

Audit and Engineering Review

State of Alabama

bec w/ encl:

NRC Resident Inspector

E. Reeves, Project Manager, NRR

Document-Control Desk

i

i

!

RII. RII RI RII

':o 4 g i

WGloersen RShortridge JPotter[yECantrell

5/p /89 5/Ao/89 5////89 5/ U/89

.,.

{

C_W____________._____ . _ _ _ _ _ _ _ _ . _

_.__________.______.______._____.___________________.___________________._________________.____________________.._______________j