Forwards Insp Repts 50-413/89-19 & 50-414/89-19 on 890616- 28.No Notice of Violation Presently Issued Due to Violations Being Under Consideration for Escalated Enforcement Action. Enforcement Conference Scheduled for 890720
ML20247G186
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 07/14/1989
From: Ebneter S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Tucker H
DUKE POWER CO.
Shared Package
ML20247G192 List:
References
NUDOCS 8907270350
Download: ML20247G186 (2)


See also: IR 05000413/1989019

Text

., _ _ - - - _ - - _ _ - . __

' [)

-

f -],

,. .

-

.g o.- ,..

- . .

. .g- k

M

,

i }, " ^ .

JUL 141989

! Docket Nos. 50-413'and 50-414 '!

. License Nos. NPF-35 and NPF-52

Duke. Power Company

' ATTN: l1r. H. B. Tucker, Vice President

Nuclear Production Department

422' South Church - St reet

Charlotte, NC 28242

..

Gentlemen:

'SOBJECT: INSPECTION REPORT NOS. 50-413/89-19 AND 50-414/89-19

I

This refers to the Nuclear Regulatory Commission-(NRC) inspection conducted'by

W. T. Orders and M..S. Lesser on June 16-28, 1989.' The inspection' included'a-

review of' activities ' authorized for your Catawba facility. At the conclusion!

of the inspection, the findings were discussed with tho'se members of your' staff

identified in the enclosed inspection report.

Areas examined during the inspection are identified in ' the report. Within

these areas,:the inspection consisted of selective examinations of procedures

and representative records, interviews with personnel, and observation - of

activities in progress.

The inspection findings indicate that certain activities appeared to violate

NRC requirements. The violations described in the enclosed Inspection Report

are under consideration for escalated enforcement action. Accordingly, no

Notice of Violation is being issued at this time and no response to this'1etter

.is- required. - However, please be advised that the number and characterization

of violations described in the enclosed ' Inspection Report may change as .a

result- of further NRC review. . An Enforcement Conference to discuss. these

violations has 'been scheduled for July 20, 1989. You will be advised by

separate correspondence of the results of our deliberations on this matter.

In accordance with Section- 2.790 of the NRC'S " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and its enclosure

will be placed in the NRC'S Public Document Room.

Should you have any. questions concerning this letter, please contact us.

Sincerely,

5)

Stewart D. Ebneter

Regional Administrator

Enclosure:

Inspection Report

cc w/ enc 1: (See page 2)

8907270330 e90734 i\

PDR- ADOCK 05000413 ,

---

O~

,

_ _ _ _ _ _ - - _

PDC

_ _ _ - _ _ . -- __ _ _

.ZFo

__

,_- -_ _,

a 4

,

-

.

,

Duke. Power Company 2

jut 141989

cc w/ enc 1:

T. B. Owen, Station Manager

Senior Resident Inspector - McGuire

State of South Carolina

bec w/ enc 1:

NRC Resident Inspector

Document Control Desk

K, Jabbour, NRR

1

1

RI RII R RII RII

'

Tf8 nser k AHerdt s nst

7/43/89 7/Af/89 '//g b/89 1 7/ 89 7 /89  ;

!

RII

GJenkins

7//f/89 4