ML20247J890

From kanterella
Revision as of 13:17, 10 February 2021 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Rept P-741-1, Analyses of Components in Asco Solenoid Valve, Per W Paulson Request
ML20247J890
Person / Time
Site: River Bend Entergy icon.png
Issue date: 03/27/1989
From: Booker J
GULF STATES UTILITIES CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20247J897 List:
References
RBG-30417, NUDOCS 8904050113
Download: ML20247J890 (2)


Text

_. ______ _ __-__- . _.__

t

  • G ULF STATES UTILITIES COMPANY eg RI/f R Of ND 5f AllCN POST OF FICE WJX 220 ST SRANCISVILL E Louts!AN A 70775 AHI A r. ODE f>04 635 &m4 34fl 8651 March 27, 1989 R8G- 30417 File Nos. G9.5, G9.25.1.3 U. S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555 l Gentlemen:

River Bend Station - Unit 1 Docket No. 50-458 In response to a verbal request from Mr. Walt Paulson, enclosed is a copy of a report prepared by Franklin Resea rch Center for Gulf States Utilities Company. The report documents analyses of components in an ASCO solenoid valve from River Bend Station.

If J you need additional information, please contact David Lorfing at (504) 381-4157.

Sincerely,

., I h~r J. E. Booker i Manager-River Bend Oversight River Bend Nuclear Group JEB/L h Enclocu >

cc: if. . Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 1000 Arlington, TX 76011 1

NRC Senior Resident Inspector P.O. Box 1051 St. Francisville, LA 70775 I

(?

8904050113 890327 [ }

PDP ADOCK 0500045G P PDC w____-__-_-__ _ _

I s.

1 4 ,

FRANKLIN RESEARCH CENTER

DIVISION OF ARVIN/CALSPAN 1

?

February 9, 1989 Gulf States Utilities Co.

River Bend Station, MA-2 P.O. Box 220 St. Francisville, LA 70775 Attention: Mr. Vincent P. Bacanskas rit b G V.BACANSKAS

Reference:

GSU Purchase Order No. 80N73567 FRC Project No. P741-0001

Dear Vince:

Enclosed is a copy of Report No. P741-1 covering FRC's analyses of components in an ASCO solenoid valve.

/ I would be pleased to discuss the analyses conducted and the results, i conclusions and recommendations presented in the report.

We will be returning the valve to you in the container in which it was shipped to FRC.

Very truly yours, 0.JG La ence nard Principal Engineer LL/ih Encl.

O- VALLEY FORGE CORPORATE CENTER 2000 MONROE SoulEVARD NomRISfoWN. PA 19403 TEL (215) 666-3000 1323C l l l

-- -.