ML20248A175

From kanterella
Revision as of 16:45, 9 February 2021 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Ack Receipt of 890407 Response to Violations Noted in Insp Repts 50-348/89-03 & 50-364/89-03.Violation Occurred as Stated in Notice of Violation.Written Statement Describing Corrective Actions Requested.Encl Withheld (Ref 10CFR2.790)
ML20248A175
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 06/02/1989
From: Stohr J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Hairston W
ALABAMA POWER CO.
References
NUDOCS 8906080070
Download: ML20248A175 (2)


See also: IR 05000348/1989003

Text

- - _ _ _ _

-

" '

,

.

. SAFEGUARDS INFORMATION

,

,

JUN 0 2 L439

Alabama Power Company

ATTN: Mr. W. G. Hairston, III

Senior Vice President-Nuclear S NCEylUOM EMOVED

Operations .S'

< P. O. Box 2641

Birmingham, AL 35291-0400

Gentlemen:

SUBJECT: REPORT NOS. 50-348/89-03 AND 50-364/89-03

Thank you for your response of April 7,1989, to our Notice of Violation issued

on March 10, 1989, concerning activities conducted at your Farley facility

under NRC License Nos. NPF-2 and NPF-8.

In your response, you denied the violation. After careful consideration of the

bases for your denial, we have concluded, for the reasons presented in the

enclosure to this letter, that the violation occurred as stated in the Notice

of Violation. Therefore, in accordance with 10 CFR 2.201(a), please submit to

this office within 30 days of the date of this letter, a written

statement describing steps which have been taken to correct this violation and

the results achieved, corrective steps which will be taken to avoid further

violations, and the date when full compliance will be achieved.

In accordance with 10 CFR 2.790(d) and 10 CFR 73.21, safeguards activities and

security measures are exempt from public disclosure. Ths afore, the

enclosure to this letter will not be placed in the NRC Public Document Room.

The responses directed by this letter and its enclosure are not subject to the

clearance procedures of the Office of Management and Budget as required by the

Paperwork Reduction Act of 1980, Pub. L. No.96-511.

We appreciate your cooperation in this matter.

Sincerely,

ORIGINAL SIGNED BY

WILLIAM E. CLWE

J. Philip Stohr, Director

Division of Radiation Safety

and Safeguards

Enclosure:

Staff Assessment of Licensee Response

(Safeguards Information)

cc w/ encl: (See page 2)

8906080070 890602 f *

PDR ADOCK 05000348

O PDC

-

-

Docummt transmhted he'twith

SAFEGUARDS INFORMATION  %;;";TET:%1

rM b'Urrs, tM docu twnt is decontrQ{tei

. _ _ . _ _ _ _ _ _ _ _ . _

- - - --

'

-

,.

. SAFEGUARDS INFORMATION

'

Alabama Power Company 2

JgN O 2 g

cc w/ encl:

B. M. Guthrie, Executive Vice President

D. N. Morey, General Manager -

Nuclear Plant

J. D. Woodard, Vice President -

, Nuclear Generation

J. W. McGowan, Manager-Safety Audit

and Engineering Review

S. Fulmer, Supervisor-Safety

Audit and Engineering Review

cc w/o encl:

State of Alabama

bec w& encl: r

NRC Resident Inspector

E. Reeves, Project Manager, NRR

Document Control Desk .016

bcc w/ encl:

NRR/DRIS/SB

RII RI RII ,'/

,

WWSt n ry:er icGuire WCline HDance Jen ins

05//6/89 05/[J/89 05/f;/89 05/g/89 05/j2./89

Dor v

SAfsGU RDS INFORMATION g;;menttranten!?tedbeewith=;;;

wit =.un *,1tus datument is de;ontrolled.

- - _ - _ _ -