ML20248C206

From kanterella
Revision as of 04:40, 2 February 2021 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Advises of Special Emergency Operating Procedure Insp Program Being Performed at Plant on 891127-1208 to Verify That Procedures Technically Accurate & That Actions Can Be Accomplished W/Equipment,Controls & Instrumentation
ML20248C206
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 09/15/1989
From: Reyes L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Hairston W
ALABAMA POWER CO.
References
NUDOCS 8910030395
Download: ML20248C206 (3)


Text

--- - - - - -

Septwber 15, 1989 Docket Nos. 50-348,-50-364 License Nos. NPF-2, NPF-8 Alabama Power Company ATTN: Mr. W. G. Hairston, III Senior Vice President

-Nuclear Operations

.40 Inverness Center Parkway P. O. Box 1295 Birmingham, AL 35201 Gentleraen:

SUBJECT:

EMERGENCY OPERATING PROCEDURE (E0P) INSPECTION. PROGRAM DOCKET NOS. 50-348 AND 50-364.

This is to advise you of a special inspection initiative that is being performed at operating reactors. It will include an inspection to be performed at the Joseph M. Farley site. The initiative is entitled the "EOP Inspection Program."

The purpose of the inspection is to- verify. that the E0Ps. are technically accurate; that specified actions can be meaningfully accomplished. using existing equipment, controls, and instrumentation; and that the available procedures have the usability necessary to provide the operator with an effective operating tool.

The inspection program utilizes a team inspection. The inspection team will include two or three senior reactor inspectors, a licensing examiner,.a hum n factors specialist, and the Farley senior resident inspector (Mr. G. Maxweil).

The inspection is scheduled for November 27 - December. 8,1989. The team leader for this inspection will be Mr. L. Lawyer from Region II. Mr. Lawyer recently contacted members of your staff to discuss the c:etails of the inspection.

If you have any questions in the interim regarding the inspection program, we will be pleased to discuss them with you.

Sincerely, Original Signed by Charles W. Hehl /for Luis A. Reyes, Director Division of Reactor Projects 1

cc: (Seepage 2) 8920030395 890915

-gDR ADOCK 0500034s

_ PNU '

'ZE3C

Alabama Power Company 2 September 15, 1989 cc: B. M. Guthrie Executive Vice President Alabama Power Company P. O. Box 2641 Birmingham, AL 35291-0400 R. P. Mcdonald Executive Vice President Alabama Power Company P. O. Box 1295 Birmingham, AL 35201 J. D. Woodard Vice President - Nuclear Generation Alabama Power Compar.y P. 0. Box 2641 Birmingham, AL 35291-0400 D. N. Morey General Manager - Nuclear Plant Farley Nuclear Plant Drawer 470 Ashford, AL 36312 J. W. McGowan, Manager Safety Audit and Engineering Review Alabama Power Company P. O. Box 2641 Birmingham, AL 35291-0400 ,

S. Fulmer, Supervisor Safety Audit and Engineering Review Farley Nuclear Plant i Drawer 470 I Ashford, AL 36312 1

Louis B. Long, General Manager Southern Company Services, Inc.

P. O. Box 2625  ;

Birmingham, AL 35202 ]

Robert A. Buettner, Esq.

Balch, Bingham, Baker, Hawthorne, ,

Williams and Ward i P. O. Box 306 i Birmingham, AL 35201 l

I

Alabama Power Company 3 September 15, 1989 1 cc cont'd:

Ernst L. Blake, Jr., Esq.

Shaw, Pittman, Potts and Trowbridge 2300 N Street, NW Washington, D. C. 20037 i

D. Biard MacGuineas, Esquire ]

Volpe, Bokey and Lyons - 1 918 -16th Street, NW ,

Washington, D. C. 20006 Claude Earl Fox, M.D.

State Health Officer State Department of Public Health State Office Building Montgomery, AL 36130 Chairman Houston County Comission l Dothan, AL 36301  !

State of Alabama bec w/ encl: I E. Reeves, Project Manager, NRR G. Lapinsky, NRR Document Control Desk j NRC Resident Inspector U.S. Nuclear Regulatory Comission Route 2, Sox 24 Columbia, AL 36319 I

l n

g,j.ellgmpg3 R .NS RII: S RII: S RII:0RP RII:dPl v LL wyer PKeljt'ogg les Gibson DVer elli l.

09/f y/89 09/g/89 09//y/89 9////89 09/l /89 i

k i

- - _ - - - - _ - - - - - - - -- - .-