Forwards Insp Repts 50-348/87-19 & 50-364/87-19 on 870810- 14.No Violations or Deviations Noted
ML20238A345
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 08/31/1987
From: Cline W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Mcdonald R
ALABAMA POWER CO.
Shared Package
ML20238A348 List:
References
NUDOCS 8709090252
Download: ML20238A345 (2)


See also: IR 05000348/1987019

Text

- _ -

_ - - - ~ ~ ~ ~ ~ -

--

-

. 3

SAFEGbARDS INFORMATION

AUG 311987

Docket Nos. 50-348, 50-364

License Nos. NPF-2 and NPF-8

Alabama Power Company

ATTN: Mr. R. P. Mcdonald

Senior Vice President

P. O. Box 2641

Birmingham, AL 35291-0400

Gentlemen:

SUBJECT: (NRC INSPECTION REPORT NOS. 50-348/87-19 AND 50-364/87-19)

This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by

D.. Thompson on August 10-14, 1987. The inspection included a review of

activities authorized for your Farley Nuclear . Power Plant facility. At the

conclusion of the inspection, the findings were discussed with those members of

your staff identified in the enclosed inspection report.

Aras examined during the inspection are identified in the report. Within

these areas, the inspection consisted of selective examinations of procedures

and representative records, interviews with personnel, and observation of

activities in progress.

Within the scope of the inspection, no violations or deviations were

identified.

In accordance with 10 CFR 2.790(d) and 10 CFR 73.21, safeguards activitier and

security measures are exempt from public disclosure; therefore, the enclosure

to this letter, with the exceptior, of the report cover page which presents a

nonexempt summary, will not be placed in the NRC Public Document Room.

Should you have any questions concerning this letter, please contact us.

l

Sincerely,

William E. Cline, Chief

Nuclear Materials Safety and

Safeguards Branch

Division of Radiation Safety

and Safeguards

Enclosure: (See page 2)

0709090252 070831

PDR ADOCK 05000340

G PDR , ENCLos%E CO:: TASS

u.PENr c; I:!I av ATION

S AFEGU ARDS INFORM ATION= PM 13 000

c=yw

_ -

"

ift

- - - - - - - - -- -- _- - _ _ --- .

'.

SAFEGUARDS INFORMATIO

Alabama Power Company 2

AUG 311987

Enclosure:

NRC Inspection Report

(Safeguards Information)

cc w/ enc 1:

W. 0. Whitt, Executive Vice President

J. D. Woodard, General Manager -

Nuclear Plant

W.'G. Hairston, III,-General Manager -

Nuclear, Support

J. W. McGowan, Manager-Safety Audit

and Engineering Review

J. K. Osterholtz, Supervisor-Safety

Audit and Engineering Review

bec w/ enc 1:

NRR/ORIS/SB

bec w/ Inspection Summary:

NRC Resident Inspector

Document Control Desk, 016

State of-Alabama

l

RII geh R ,

DThompson:tj Dic uire LModenos {

8/d')/87 8/ 87 8/by'/87

ENCLOSURE CONTAFNS

St.FECUARDS Im'cy,7

EGUARDS INF0RMA iioi. ** ""'"""an=-*

--