Forwards Errata & Addendum 1 to GE NEDC-30997, Edwin I Hatch Nuclear Plant,Unit 1,Reactor Pressure Vessel Surveillance Matls Testing & Fracture Toughness Analysis. Date of Surveillance Capsule Removal Corrected
ML20207E978
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 12/26/1986
From: Gucwa L
GEORGIA POWER CO.
To:
NRC OFFICE OF ADMINISTRATION (ADM)
Shared Package
ML20207E982 List:
References
SL-1705, TAC-60542, NUDOCS 8701050318
Download: ML20207E978 (3)


Text

- - - _ _ _ -

Georgia Fower Company 333 Piedmont Avanue Atlanta, Georgia 30308 Telephone 404 5264526 Mar!ing Address:

Post Office Box 4545 -

Atlanta, Georgia 30302 Georgia Power L T. Gucwa the southem ekxtrc system Manager Nuclear Safety and Ucensing SL-1705 0976C j i

December 26, 1986 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washir.gton, D.C. 20555 NRC DOCKET 50-321 OPERATING LICENSE DPR-57 EDWIN I. HATCH NUCLEAR PLANT UNIT 1 ERRATA TO RPV SURVEILLANCE MATERIALS TESTING AND FRACTURE TOUGHNtSS ANALYSIS Gentlemen:

By Georgia Power Company (GPC) letter SL-189, dated January 10, 1986, we submitted General Electric (GE) topical report NEDC-30997, "Edwin I. Hatch Nuclear Plant, Unit 1, Reactor. Pressure Vessel Surveillance Materials Testing and Fracture Toughness Analysis," to the NRC. The subject topical report constituted the summary technical report required by 10 CFR 50, Appendix H, Section III.A and discussed testing of surveillance capsule specimens removed from the Hatch Unit 1 reactor pressure vessel (RPV) during the Fall 1984 maintenance / refueling outage.

In order to correct the surveillance capsule removal date and to make editorial changes, we requested GE to issue an errata to NEDC-30997. The discrepancy in the surveillance capsule removal date was discussed in our letter dated January 10, 1986. Enclosed herein are 19 copies of the Errata and Addenda No. 1 to GE topical report NEDC-30997. Instructions for incorporating the revised pages are included in the enclosure.

The changes provided by the enclosed errata should have no effect upon the previously reported test results which 'were the bases for the proposed Technical Specifications changes submitted to the NRC by GPC letter SL-161, dated January 7, 1986. The proposed Technical Specifications ' changes were subsequently issued by the NRC as Amendment No.126 to Hatch Unit 1 Facility Operating License DPR-57.

8701050318 861226 PDR ADOCK 05000321  !

P PDR 9

Georgia Power d U.S. Nuclear Regulatory Commission ATTN: Document Control Desk December 26, 1986 Page Two Should you have any questions in this regard, please contact this office at any time.

Sincerely,

<Wr @ -1 =

L. T. Gucwa JAE/lc Enclosure c: Georc ia Power Company U.S. Nuclear Regulatory Commission Mr. s . P. O'Reilly Dr. J. N. Grace, Regional Administrator Mr. J. T. Beckham, Jr. Mr. P. Holmes-Ray, Senior Resident Mr. H. C. Nix, Jr. Inspector-Hatch G0-NORMS Mr. G. Rivenbark, Licensing Project Manager 0976C

'*"s - - -.._- - .-__. _. .- _

t ENCLOSURE TO GEORGIA POWER COMPANY LETTER SL-1705-a DATE: AG d d I30$