Provides Description of Three Listed Requirements Re Plant Defueled Emergency Plan Implementation Commitments,In Response to 980911 Telcon with NRC
ML20151Y262
Person / Time
Site: Big Rock Point File:Consumers Energy icon.png
Issue date: 09/11/1998
From: Powers K
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9809180168
Download: ML20151Y262 (2)


Text

. ..- - -- .-- --. . - -_-

l M

l l

A CMS Energy Company big Ibck Point Nuclear Plant M R numers 10269 t&3I Nonn Site General Manager Charlevoix, MI 49720 l

4 September 11,1998 l

Nuclear Regulatory Commission l Document Control Desk Washington, DC 20555 - 0001 DOCKET 50-155 - LICENSE DPR BIG ROCK POINT PLANT: BIG ROCK POINT PLANT DEFUELED EMERGENCY PL,AN IMPLEMENTATION COMMITMENTS On September 11,1998, a conference call was conducted between the Nuclear Regulatory I Commission and the Big Rock Point Licensing staff with regard to the Defueled Emergency Plan (DEP) currently undergoing NRC review. The NRC Staff has concluded that the following three (3) requirements need to be described in the DEP to gain approval. Note: the text that is

" struck out"is consistent with the latest supplement of the related exemption request submitted July 30,1998.

  • Appendix E (IV)(C): Activation of Emergency Organization

" ...The existence, but not the details, of a message authentication scheme shall be noted for such (offsite) agencies".

e Appendix E (IV)(D)(1): Notification Procedures

" Administrative and physical means for notifying local, State, and Federal officials and agencies and agreements reached with these officials and agencies for thc prompt notifica:icn of the public and for public cvacuatica v. um.s. rm.mu m ummem , muuu.m u.s., umm.m .. mmeu. ,, shall be described. This description shall include identification of the appropriate officials, by title and agency, of the State and local government agencies veithin the EPZs.

  • Appendix E (IV)(E): Emergency Facilities and Equipment

" Adequate provisions shall be made and described for emergency facilities and equipment, including: (9) At least one onsite and one offsite communications system; each system shall have a backup power source".

e

) O 980918016e 980911 PDR -ADOCA 05000155 E rkgt[~3 F PDR u J

. -- -. ., - --.- - . =.- - -. - - .-.- -._. _ - _ -. .- . _ ~ _ -_. -

l l BIG ROCK POINT PLANT DEFUELED EMERGENCY PLAN; IMPLEMENTATION COMMITMENTS l- The Big Rock Point Defueled Emergency Plan will be revised to describe the requirements listed above. A letter confi ing the completion of the revisions will then be forwarded to the NRC.

Kenneth P Powers l Site General Manager i.

cc: Administrator, Region llI NRC Decommissioning Inspector- BRP NRR Project Manager - OWFN, USNRC l