Confirms 880926-30 as Dates for Reverification Insp of post-fire Safe Shutdown Capability,Per 880822 Telcon.List of Requested Matls Encl
ML20153F443
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 08/26/1988
From: Reyes L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Hairston W
ALABAMA POWER CO.
References
NUDOCS 8809070297
Download: ML20153F443 (3)


Text

_ _ _ . . _ - ._. _- _ _ .

. J *

/  :

AUS 261988 r'

i f

Docket Nos. 50-348, 50-364  ;

License Nos. NPF-2 and NPF-8 i

l i Alabama Power Company '

i ATTN: Mr. W. G. Hairston, III l Senior Y4e President-Nuclear  !

j Operations P. O. Box 2641 Birmingham, AL 35291-0400 i Gentlemen: f i

j $UBJECT: TRIENNIAL POSTFIRE SAFE SHUT 00WN CAPABILITY REVERIFICATION INSPECTION  :

t i This letter is to confirm the dates September 26-30, 1988, for the reverifica-

! tion of the postfire safe shutdown capability (Module 64150) inspection of j Farley, which was established during the telephone conversation of August 22, i 1983, between David Jones of your staff, and Hugh Dance of this office. l The purpose of this inspection is to verify your continued compitance with i 10 CFR 50, Appendix R, Sections III.G, III.J., III.L. and !!!.0; reverify your j postfire safe shutdown capability; and review your configuration management I

{ program with respect to fire protection. This will be a team type inspection, f

~

composed of personnel from NRC Region II office.  !

! I f In order for us to perform the inspection in an expeditious manner, we request I that you have the materials listed on the enclosure to this letter readily

! available to the inspection team when they arrive on site on September 26, i

{ 1988.  ;

I 1 '

Your cooperation with us during this inspection will be appreciated. Please j q

contact us if you have any questions, j I

j Sincerely, i i i

. C l Luis A. Reyes Otrector i Division of Reactor Projects 1

Enclosure:

(

4 Postfire Safe Shutdown Capability  !

I Reverification Inspection: l Requested Materials

}, l I cc: (See page 2) l J

l l mWAE l, 8

! JEol l

AUS 261988 Alabama Power Company 2 cc w/ enc 1:

B. M. Guthrie Executive Vice Preside it D. N. Morey, General Manager -

Nuclear Plant J. D. Woodard, Vice President -

Nuclear Generation J. W. McGowan, Manager-Safety Audit and Engineering Review S. Fulmer, Supervisor-Safety Audit and Engineering Review bec w/ encl:

NRC Resident Inspector DRS Technical Assistant E. Reeves, Project Manager, NRR State of Alabama J. U111, RIII J. Singh, RIV C. Ramsey, RV D. Kubicki, NRR Document Control Desk Ryg0 t

RII gy  ?,!q R7

/f @ ,;

RI RIQ O #

GWise7an Ne *dt AGibson HDance DVerrelli fpDWard:es 8/3Y/63 8/Ji/SS S,]//SB S/q'/SS i S/s t /SS 8/af/88

t

  • j ENCLOSURE POSTFIRE SAFE SHUTOOWN CAPABILITY REVERIFICATION INSPECTION: REQUESTED MATERIALS l i
1. Current revision of the Farley Fire Protection Program Report;

'l 2. Current revision of piping and instrumentation (flow) diagrams for hot strindby and cold shutdown systems, alternate shutdown, and RCP oil 3

collection system;

3. Plant layout drawings showing the location of fire barriers and hot
standby and cold shutdown equipment;  ;
4. Electrical raceway drawings 1  ;
5. Cable and raceway location drawings; ,
6. Plant operating procedures for postfire safe shutdown and repair
procedures for cold shutdown systems (if any);

i 1 7. Plant procedures governing design changes and work requests which 1 implement the configuration control program for fire protection;

8. All approved exemption requests and the associated NRC generated SERs I approving or denying these exemptions;
9. All engineering evaluations prepared in accordance with Generic etter '

! 86-10 justifying NFPA code deviations, the lack of area wide supp?ession l or detection, and nonrated fire barriers or fire barrier penetrations;

10. The associated circuits analysis and breaker / fuse coordination study;  ;
11. All 50.59 evaluations which justify design modifications should be l j

available on site. l i