ML20127L081

From kanterella
Revision as of 22:10, 9 July 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Insp Repts 50-348/85-21 & 50-364/85-21 on 850415-19 & Notice of Violation
ML20127L081
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 05/21/1985
From: Verrelli D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Mcdonald R
ALABAMA POWER CO.
Shared Package
ML20127L085 List:
References
NUDOCS 8506270735
Download: ML20127L081 (2)


See also: IR 05000348/1985021

Text

-

', '

yt'/lW

May 21,1985

Alabama Power Company

ATTN: Mr. R. P. Mcdonald

Senior Vice President-Nuclear Generation

P. O. Box 2641

Birmingham, AL 35291

Gentlemen:

SUBJECT: REPORT NOS. 50-348/85-21 AND 50-364/85-21

On April 15 - 19, 1985, NRC inspected activities authorized by NRC License

Nos. NFP-2 and NFP-8 for your Farley facility. At the conclusion of the

inspection, the findings were discussed with those members of your staff

identified in the enclosed inspection report.

Areas examined during the inspection are identified in the report. Within these

areas, the inspection consisted of selective examinations of procedures and

representative records, interviews with personnel, and observation of activities

in progress.

The inspection findings indicate that certain activities violated NRC require-

ments. The violation, references to pertinent requirements, and elements to be

included in your response are presented in the enclosed Notice of Violation.

The responses directed by this letter and the enclosures are not subject to the

clearance procedures of the Office of Management and Budget issued under the

Paperwork Reduction Act of 1980, PL 96-511.

Should you have any questions concerning this letter, please contact us.

Sincerely,

(Original signed by DMVerrelli)

David M. Verrelli, Chief

Reactor Projects Branch 1

Division of Reactor Frojects

Enclosures:

1. Notice of Violatica

2. Inspection Report Nos. 50-348/85-21

and 50-364/85-21

cc w/encls: (See page 2)

'

f

' (

8506270735 850521 s

PDR ADOCK 05000348

'*"

_

ZE Ol y

, - -

-O

e .

Alabama Power Company 2 May 21, 1985

cc w/encls:

W. O. Whitt, Executive Vice President

J. D. Woodard, Plant Manager

W. G. Hairston, III, Manager, Nuclear Engineering

and Technical Support

J. W. McGowan, Manager-Safety Audit

and Engineering Review

H. O. Thrash, Manager, Nuclear Operations

and Administration

W. G. Ware, Supervisor-Safety Audit

and Engineering Review

bec w/encls:

NRC Resident Inspector

E. Reeves, Project Manager, NRR

Document Control Desk

State of Alabama

'

/Jo V

RII RII RII fy RII

yGABelisle:sa & V1 I<

y/iSibsont&7DI FCantrell mic .0$

CMUpright 7'/{

/85 /85 85 0 fj/85

$/f [ /T L>