ML20127L237

From kanterella
Revision as of 20:35, 9 July 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards ASME Code Update for Third Interval ISI Program, Per 10CFR50.55(a(g)
ML20127L237
Person / Time
Site: Big Rock Point File:Consumers Energy icon.png
Issue date: 01/22/1993
From: Beckman W
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20127L241 List:
References
NUDOCS 9301270057
Download: ML20127L237 (1)


Text

  1. h Consumers William L Deckman SQWgR$Ng .

MKHNEAN5 PROGRESS Big Rock Point Nuclear Plant.10269 US-31 North, Charlevoix, MI 49720 January 22, 1993 Nuclear Regulatory Commission Document Control Desk Was.hington, DC 20555 DOCKET 50-155 - LICENSE DPR BIG ROCK POINT PLANT -

ASME CODE UPDATE FOR THE THIRD INTERVAL, INSERVICE INSPECTION PROGRAM This update is being submitted in accordance with 10 CFR Part 50 paragraph 50.55a(g), which requires the use of the code incorporated by reference in paragraph (b) of 50.55a 12 months prior to the start of the 120 month interval. For the Big Rock Point Plant, the third inservice inspection interval commenced on January 1, 1992, and the code required per paragraph (b) of 50.55a for usage is the 1986 Edition of ASME Section XI with no addenda.

This code was incorporated in the Code of Federal Regulations-Energy, Title 10, Parts 0 to 50 as of January 1, 1991.

Section 5 (Relief Requests) describes the requests for relief (for the third in.erval) o suomitted to tne Nuclear Regulatory Commission per 10 CFR 50.55a.

The relief requests submitted for the third inspection interval at's requests that have been previously reviewed and approved for the first and second inspection intervals at Big Rock Point.

As a point of claiification, the Big Rock Point intervals are based on a letter from the Nuclear Regulatory Commission to Consumers Power Company dated June 10, 1983. This letter concludes that the second 10 year interval for Big Rock Point started on January 1, 1982. This letter also allowed the extension-of the first interval examinations until the end of the 1983 refueling outage, but required the second interval start January 1,1982. The January 1, 1997 start date for the third inspection interval was selected based oil the above discussion. It should be noted that the second interval ended on the start-up from the 1991-1992 refueling outage (May 16,1992). This outage began on November 29, 1991, and was originally scheduled to end on February 7, 1992.

The outage was extended to May 16, 1992, due to mechanical problems encountered with the reactor baffle bolts.

William L Beckman (Signed)

William L Beckman Plant Manager CC: Administrator, Region III, USl1RC NRC Resident Inspector - Big Fock Point 27001a ATTAQHMENh _. - ~ l o _ , / l

($5o I 9200S}lf A CMS ENGRCW COMPANY ~

L 1/t$15