ML20127M147

From kanterella
Revision as of 17:57, 9 July 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Insp Rept 50-413/85-18 on 850412 & 16-19.No Violation or Deviation Noted
ML20127M147
Person / Time
Site: Catawba Duke Energy icon.png
Issue date: 05/08/1985
From: Brownlee V
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Tucker H
DUKE POWER CO.
Shared Package
ML20127M150 List:
References
NUDOCS 8507010122
Download: ML20127M147 (1)


See also: IR 05000413/1985018

Text

. s.

f

NAY 8 1985

Duke Power Company

ATTN: Mr. H. B. Tucker, Vice President

Nuclear Production Department

422 South Church Street

Charlotte, NC 28242

/4

ti

Gentlemen:

SUBJECT: REPORT N0. 50-413/85-18

On April 12 and 16-19, 1985, NRC inspected activities authorized by NRC Operating

License No. NPF-35 for your Catawba facility. At the conclusion of the

inspection, the findings were discussed with those members of your staff

identified in the enclosed inspection report.

Areas examined during the inspection are identified in the report. Within these

areas, the inspection consisted of selective examinations of procedures and

representative records, interviews with personnel, and observation of activities

in progress.

Within the scope of the inspection, no violations or deviations were identified.

Should you have any questions concerning this letter, please contact us.

Sincerely,

S{

Virgil L. Brownlee, Chief

Reactor Projects Branch 2

Division of Reactor Projects

Enclosure:

Inspection Report No. 50-413/85-18

cc w/ enc 1:

R. L. Dick, Vice President - Construction

J. W. Hampton, Station Manager

bec w/ encl:

G. Johnson, ELD

K. N. Jabbour, NRR

Document Control Desk

"

fb e$kd@.b n ES

I RII RII RII

l dh

)Burnett

h

M

AHerdt

VB nlee:km & FJap r

05/ qw/85 05A6/85 05/ 85 05/1/85 3

8507010122 850508

PDR ADOCK 05000413

f