Forwards Insp Repts 50-348/85-35 & 50-364/85-35 on 850819-23.No Violation or Deviation Noted
ML20132C761
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 09/23/1985
From: Verrelli D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Mcdonald R
ALABAMA POWER CO.
Shared Package
ML20132C764 List:
References
NUDOCS 8509270138
Download: ML20132C761 (2)


See also: IR 05000348/1985035

Text

'

.

,

ff/f0cb

.

.

SEP2 31985

Alabama P,ower Company

ATTN: p r. R. P. Mcdonald

Senior Vice President-Nuclear Generation

P. O. Box 2641 ,

Birmingham, AL 35291

Geatlemen:

SUBJECT: REPORT NOS. 50-348/85-35 AND 50-364/85-35

On August 19-23, 1985, NRC inspected activities authorized by NRC Operating

License Nos. NPF-2 and NPF-8 for your Farley facility. At the conclusion of the'

inspection, the findings were discussed with those members of your staff

identified in the enclosed inspection report.

l

Areas examined during the inspection are identified in the report. Within these l

areas, the inspection consisted of selective examinations of procedures and

representative records, interviews with personnel, and observation of activities

in progress.

Within the scope of the inspection, no violations or deviations were identified.

Should you have any questions concerning this letter, please contact us.

Sincerely,

Ou/ F?a6chen & .

David M. Verrelli, Chief

Reactor Projects Branch 1

Division of Reactor Projects

Enclosure:

Inspection Report Nos. 50-348/85-35

and 50-364/85-35

cc w/ encl:

M 0. Whitt, Executive Vice President

  1. D. Woodard, Plant Manager
  1. . G. Hairston, III, Manager, Nuclear Engineering

nd Technical Support

. W. McGowan, Manager-Safety Audit '

LM'and Engineering Review

O. Thrash, Manager, Nuclear Operations

and Administration

p/G. Ware, Supervisor-Safety Audit

and Engineering Review

bec w/ encl: (See page 2)

!N$48

"*

I

.svu y_ . _

% o*

.

'

  • *

.

,

Alabama Power Company 2

SEP 2 31985

bec w/ encl:

NRC Resident Inspector

T( Reeves, Project Manager, NRR

V' Benaroga, NRR/CHEB

0/ arr,

P NRR/ASB

Q.,A. Reeves,NRR/ ORB 1

L.vWhitney, IE

Document Control Desk

State of Alabama

,

' . ,, , '

'

RIIs'.p\ RI[. / IF RI RII

C -

'4'

{a a

WcfTier:jw TConlo 1 AHe dt FCan rell DVerrelli

9/(.(/85 9 0 /85 9/g/85 9/

/%

9/ /85