ML20132F345

From kanterella
Revision as of 08:33, 5 July 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Insp Rept 50-413/85-28 on 850624-28.No Violations or Deviations Noted
ML20132F345
Person / Time
Site: Catawba Duke Energy icon.png
Issue date: 07/12/1985
From: Brownlee V
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Tucker H
DUKE POWER CO.
Shared Package
ML20132F349 List:
References
NUDOCS 8508020244
Download: ML20132F345 (1)


See also: IR 05000413/1985028

Text

c

y<llow

t-

.

JUL 121985

J) uke Power Company

V ATTN: Mr. H. B. Tucker, Vice President

Nuclear Production Department

422 South Church Street

Charlotte, NC 28242

Gentlemen:

SUBJECT: REPORT NO. 50-413/85-28

On June 24 - 28, 1985, NRC inspected activities authorized by NRC License

No. NPF-35 for your Catawba facility. At the conclusion of the inspection, the

findings were discussed with those members of your staff identified 'in the

enclosed inspection report.

Areas examined during the in.spection are identified in the report. Within these

areas, the inspection consisted of selective examinations of procedures and

representative records, interviews with personnel, and observation of activities

in progress.

Within the scope of the inspection, no violations or deviations were identified.

Should you have any questions concerning this latter, please contact us.

Sincerely,

Y. W Md'#^ h

Virgil L. Brownlee, Chief

Reactor Projects Branch 2

Division of Reactor Projects

Enclosure:

Inspection Report No. 50-413/85-28

cc w/ encl:

M . L. Dick, Vice President - Construction

d W. Hampton, Station Manager

bec w/ encl:

d , Johnson, ELD

-1(. N. Jabbour, NRR

Document Control Desk 8508020244 850712

State of South Carolina PDR ADOCK 05000413

a PDR

vffRC Resident Inspector

,

RII RII RI

PTaurnett:sa FJa ARHerdt d\

07////85 07//g85 07/go/85

UOl 'lt