|
---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARML17355A4601999-10-26026 October 1999 Forwards Revised Epips,Including Revs to 0-EPIP-1102, 0-EPIP-1212,0-EPIP-20110,0-EPIP-20111,0-EPIP-20132, 0-EPIP-20133 & 0-EPIP-20201,per 10CFR50.54(q) & 10CFR50, App E.Epip 0-EPIP-20107,has Been Deleted ML17355A4301999-10-0808 October 1999 Forwards Rev 16 of Updated Fsar.Info Accurately Reflects Plant Changes Made Since Previous Submittal.Rev Incorporates Changes Completed Between 971015 & 990408.Summary of Accuracy Review Changes & Instructions,Included ML17355A4461999-10-0404 October 1999 Notifies NRC of Change in Commitment to Perform Periodic Testing of Critical Welds & Parts on Special Lifting Devices IAW NUREG-0612.Use of Ae Technology Will Provide Same Level of Testing Quality as Did NDE Methods Noted in ANSI Std L-99-208, Forwards Changes,Tests & Experiments Made as Allowed by 10CFR50.59 for Period Covering 971014-990408. Summary of PORV Actuations & Results of Plants SG Tube Insp,Which Occurred During That Time Included1999-10-0404 October 1999 Forwards Changes,Tests & Experiments Made as Allowed by 10CFR50.59 for Period Covering 971014-990408. Summary of PORV Actuations & Results of Plants SG Tube Insp,Which Occurred During That Time Included ML17355A4291999-10-0404 October 1999 Forwards Response to NRC Telcon Questions Re License Amend Request Dtd 990727,proposing Amend on one-time Basis to Modify TS 3.8.1.1 & TS 3.4.3 & 3.5.2 to Extend Allowed Outage Time for EDG from 72 H to 7 Days ML20212M1601999-09-28028 September 1999 Refers to 990908 Engineering Meeting Conducted at NRC Region II to Discuss Engineering Issues at Lucie & Turkey Point Facilities.List of Attendees & Copy of Presentation Handout Encl ML17355A4251999-09-22022 September 1999 Forwards NRC Form 536 in Response to NRC Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams, Issued 990820 ML17355A4111999-09-0909 September 1999 Informs That Thermo-Lag Upgrades for Fire Zones 47,54,113, 114,115,116,118,119,120 & 143 Completed on 990726,per GL 92-08 ML17355A4131999-09-0707 September 1999 Forwards Revised Relief Request 20 Re Requirement to Perform Exams as Required by IWL-2524 & IWL-2525,Table IWL-2500-1 for Exempt Tendon Insp,Per Recent Discussions with NRC ML17355A4141999-09-0202 September 1999 Documents That Util Has No Concerns or Challenges Related to site-specific Written Exam Administered at Plant on 990830 ML17355A4041999-08-23023 August 1999 Forwards Info to Support Assessment of Potential Risks Associated with Proposed Civil Aircraft Operations at Former Homestead Air Force Base to FP&L Turkey Point Nuclear Facility Units 3 & 4 ML17355A4071999-08-23023 August 1999 Informs That FPL Has Completed Review of Info Listed in Reactor Vessel Integrity Database,Version 2 & Found Listed Discrepancies,Re Closure of GL 92-01,rev 1,suppl 1, Reactor Vessel Structural Integrity. ML17355A4061999-08-23023 August 1999 Forwards Semiannual FFD Performance Rept for Period of Jan- June 1999,for Turkey Point Units 3 & 4.List of Events Reported & Summary of Mgt Actions Taken,Included ML17355A4001999-08-20020 August 1999 Informs That on 990722,util Determined Blind Specimen Submitted to Smithkline Beecham Clinical Labs on 990721,was Reported Back with Unsatisfactory Results.Attachment 1 Is Summary of Investigation of Unsatisfactory Performance ML17355A3941999-07-27027 July 1999 Submits Response to NRC AL 99-02, Operating Reactor Licensing Action Estimates, for FY00 & FY01 ML17355A3871999-07-16016 July 1999 Provides Supplement to FP&L Response to NRC Request for Info Re Y2K Readiness at Nuclear Power Plants ML17355A3851999-07-14014 July 1999 Informs That Pages Missing from 1998 Annual Radiological Environ Operating Rept, Contain Info Unrelated to ODCM- Specified Sampling & Were Not Included as Part of Rept ML17355A3711999-07-0606 July 1999 Forwards Revised EPIPs 0-EPIP-20201, Maintaining Emergency Preparedness - Radiological Emergency Plan Training & 0-EPIP-20126, Off-Site Dose Calculations. with Summary of Changes ML17355A3591999-06-30030 June 1999 Forwards Turkey Point,Unit 4 ISI Rept. Listed Repts Are Encl.No Eddy Current Exams Scheduled for Unit 4 Steam Generators ML17355A3661999-06-30030 June 1999 Forwards Florida Power & Light Topical QA Rept, Dtd June 1999.Encl I Includes Summary of Changes Made to Topical QA Rept Since 1998 ML17355A3571999-06-28028 June 1999 Informs That Util Voluntarily Reporting Facility Readiness as Outlined in Suppl 1 to GL 98-01.Encl Is Y2K Readiness Disclosure for Units 3 & 4,reporting Status of Facility Y2K Readiness ML17355A3521999-06-18018 June 1999 Forwards Response to NRC 990415 RAI Re GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves. ML17355A3491999-06-0404 June 1999 Forwards Summary of Corrective Actions Implemented by FPL Re GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design Basis Accident Conditions. ML17355A3441999-05-27027 May 1999 Modifies FPLs Consent to Confirmatory Order to Reflect Resolution of Four Issues Identified as Pending in L-99-031 ML17355A3451999-05-24024 May 1999 Requests Waiver of 520 Hours (13 Wks) Required Parallel Watchstanding in Control Room Prior to License Application Submittal for W Conley ML17355A2921999-04-22022 April 1999 Forwards Rev 35 to Turkey Point EP & Revised EPIP 0-EPIP-20101, Duties of EC, Per Requirements of 10CFR50, App E & 10CFR50.54(q).Summary of Changes,Encl.Implementation Date for Both Documents Was 990330 ML20205M0431999-04-13013 April 1999 Eighth Partial Response to FOIA Request for Records.App Q & R Records Encl & Being Made Available in PDR ML17355A2891999-04-0909 April 1999 Forwards Relief Request 20, Exempt Tendon Insp, Requesting Relief from ASME Section XI Code,1992 Edition,Paragraph IWL-2521.1(c) Which Requires That Each Exempted Tendon Be Examined IAW IWL-2524 & IWL-2525.Approval Needed by 991001 ML17355A2861999-04-0505 April 1999 Forwards COLR for Turkey Point Unit 4,Cycle 18,IAW TS 6.9.1.7 ML17336A0681999-04-0101 April 1999 Expresses Support for FP&L Request for Waiver of Applicable Review Fees Upon FP&L Submittal of an Application for License Renewal for Turkey Point Units 3 & 4 ML17355A2751999-03-25025 March 1999 Informs NRC & Staff of Fp&Ls Plans to Submit License Renewal Application for Turkey Point Units 3 & 4 by End of Dec 2000 ML17355A2641999-03-19019 March 1999 Requests Changes to FPL Official Service List for Turkey Point,Units 3 & 4.Add s Franzone & Remove G Hollinger from All Correspondence ML17355A2651999-03-19019 March 1999 Forwards Annual Radioactive Effluent Release Rept for Jan-Dec 1998 & Rev 7 to ODCM for Gaseous & Liquid Effluents from Turkey Point,Units 3 & 4. ML17355A2621999-03-16016 March 1999 Forwards Special Rept as Result of Turkey Point Unit 3 End-of-Cycle 16 ISI of SG Tubes.Rept Summarizes Results of SG Tube ISI ML17355A2631999-03-12012 March 1999 Forwards FPL Decommissioning Fund Status Repts for St Lucie, Units 1 & 2 & Turkey Point,Units 3 & 4.Rept for St Lucie, Unit 2 Provides Status of Decommissioning Funds for All Three Owners of That Unit ML20204C6991999-03-10010 March 1999 Requests Amend to Turkey Point PSP to Modify Requirement to Post Security Officers to Provide Continuous Observation of Entire PA Perimeter in Event of Security Computer Failure. Change to Security Force Staffing Level Also Requested ML17355A2451999-03-0909 March 1999 Submits Info on FPL Current Levels of Nuclear Property Insurance,Per 10CFR50.54(w)(3) ML17355A2501999-03-0808 March 1999 Informs That Licensee Reviewed NRC 990228 Ltr Issuing Exemption Requested Re Fire Rating of Raceway Fire Barriers in Open Turbine Bldg.Tabulated Summary of Util Comments & Marked Copy of NRC Ltr & SER Encl ML17355A2441999-03-0101 March 1999 Provides Update to Util Written Notices,Dtd 961120 & 970627 of Claim Involving Alleged Bodily Injury Arising Out of or in Connection with Use of Radioactive Matl at Units 3 & 4 ML17355A2431999-02-25025 February 1999 Informs That FPL Does Not Have Any Candidates from Turkey Point Scheduled to Participate in 990407,Generic Fundamentals Examination (GFE) ML17355A2301999-02-18018 February 1999 Forwards Semiannual Fitness for Duty Performance Data for Period of 980701-981231 for Turkey Point Units 3 & 4 ML17355A2361999-02-18018 February 1999 Forwards Tabulation of 1998 Occupational Exposure Data for Turkey Point,Units 3 & 4,per TS 6.9.1.2.a.Reactor Coolant Specific Activity Limits of 100/E-bar Mci Per Gram of Gross Radioactivity Were Not Exceeded During 1998 L-99-042, Forwards Rev 13 to Turkey Point Physical Security Plan,Per 10CFR50.54(p).Util Determined That Rev Does Not Decrease Safeguards Effectiveness of Plan.Encl Withheld,Per 10CFR2.790(a)(3)1999-02-18018 February 1999 Forwards Rev 13 to Turkey Point Physical Security Plan,Per 10CFR50.54(p).Util Determined That Rev Does Not Decrease Safeguards Effectiveness of Plan.Encl Withheld,Per 10CFR2.790(a)(3) ML17355A2341999-02-18018 February 1999 Provides Response to RAI Re GL 97-01, Degradation of Crdm/ CEDM Nozzle & Other Vessel Closure Head Penetrations. ML17355A2231999-02-0808 February 1999 Informs That Util Will Comply with Commitment with Respect to Units 3 & 4,in Response to Ja Zwolinski 990129 Ltr.Util Also Agrees to Incorporate Commitment Into Confirmatory Order Modifying License Effective Immediately Upon Issuance ML17355A2031999-01-29029 January 1999 Forwards Rev 3 to Turkey Point Nuclear Plant Recovery Plan. Rev Does Not Decrease Effectiveness of Plan ML17355A2171999-01-20020 January 1999 Forwards Listed ISI Repts for Turkey Point Unit 3,in Accordance with Provisions of ASME Code,Section XI ML17354B2241999-01-0606 January 1999 Forwards Annual 10CFR50.46 Rept Re Changes To,Or Errors Discovered in ECCS Evaluation Models,Or in Application of Such Models That Effect Peak Clad Temp Calculation ML17354B2081998-12-15015 December 1998 Informs That Fpl,In Cooperation with State of Fl & County Emergency Response Agencies,Will Conduct Exercise of Turkey Point Radiological Emergency Plan on 990210.Scenario Package Forwarded to Emergency Preparedness Section Chief,Region II ML17354B2091998-12-15015 December 1998 Forwards Price Anderson Guarantees Annual Financial Rept,Per 10CFR140.21.Exhibit 1 Submitted to Satisfy Annual Financial Reporting Requirement of 10CFR50.71(b) 1999-09-09
[Table view] Category:INTERNAL OR EXTERNAL MEMORANDUM
MONTHYEARML20236Y6301998-08-0808 August 1998 Forwards Monthly Rept Reflecting Status of 10CFR2.206 Petitions as of 980731.Petitions on Plant GT97494 & GT97339 for Which DD Became Final Actions During Month Were Closed. Portion of Encl Withheld ML20237A0011998-08-0707 August 1998 Informs That Extension Granted on Envirocare Decision of 980904.Two Week Extension on Philadelphia VA Decision of 980828 Requested.Submits Concurrence of Changes.Rept on 2.206 July Status for Plants Encl ML20248L8621998-06-0909 June 1998 Forwards May 1998 Rept on Status of Public Petitioners Under 10CFR2.206.Petition on Seabrook (GT970873) for Which DD 98- 03 Became Final Agency Decision on 980413 Closed.Attachment 3 Withheld ML20205M3331997-07-28028 July 1997 Provides Final Agenda for Region II Enforcement Meeting to Be Held on 970730.OI Attendance Requested for Issue Involving Termination of Turkey Point Radwaste Operator Who Failed to Follow Procedure ML20148F7201997-05-30030 May 1997 Forwards Semiannual Status Rept on Fire Protection Task Action Plan & plant-specific Thermo-Lag Correction Action Programs ML20138J2611997-04-29029 April 1997 Informs That on 970421,name of Docketing & Svc Branch of Ofc of Secretary Was Changed to Rulemakings & Adjudications Staff.New Mailing Address,Fax Number & e-mail Address Submitted.W/Certificate of Svc.Served on 970429 ML20137F9371997-03-20020 March 1997 Submits Listed Question to Be Addressed by Noon 970321 ML20136A9241997-02-28028 February 1997 Partially Withheld Memo Discussing drop-in Visit of J Broadhead,Chairman & CEO FPL Group & Chairman & CEO FP&L Co & J Goldberg ML20138G4131996-11-12012 November 1996 Requests Technical assistance,TIA-019,re Discrepancies Between Containment Radiation Monitoring Sys Described in Usfar & Regulatory Guide 1.45 at Plants ML20129K2631996-11-0707 November 1996 Forwards Hearing File for Rl Tetrick Proceeding,Index & Notice of Appearance,Iaw Schedule Established in Memorandum & Order, ML20138G3651996-11-0505 November 1996 Requests That Listed Info Be Forwarded to Licensee in Connection W/Unescorted Access Visits to Plant by Listed NRC Contractor Employees During 961118-970110 for Purpose of Assisting NRC in Conduct of Design Insp.Partially Deleted ML20129D5301996-10-0707 October 1996 Forwards Request for Hearing Submitted by Rl Tetrick ML20135A2381996-10-0404 October 1996 Informs That Licensee Requested Courtesy Visit for T Plunkett.Meeting Scheduled for 961121 ML20136C8201995-10-10010 October 1995 Provides Summary of Discussion & Staff Actions Re 950921 Plant Performance Review.List of Participants,Changes to Mip & Matrix Trend Charts Encl ML20136A8451995-06-0505 June 1995 Partially Withheld Memo Discussing Directors Decision 95-07 Which Denies Petitioners Request for Various Enforcment Actions Against Florida Power & Light & Its Employees ML20134B5661995-04-0606 April 1995 Responds to 950201 Memo Re Request for Exemptions to N+1 Policy ML20137R9521995-03-22022 March 1995 Informs That Plant Performance Review of Listed Plants Was Held on 950316 ML20134C2181994-10-12012 October 1994 Summarizes 941011 Meeting W/Util to Discuss Items of Mutual Interest Re Operations at Util Nuclear Stations for Plants ML20137L8531994-07-18018 July 1994 Submits List of Generic Issues Arising from Plan Changes for Turkey Point & St Lucie,Per 940718 Telcon ML20134Q3341993-06-25025 June 1993 Informs That J Goldberg Met W/Chairman Selin to Discuss Whistleblowers ML20137P7191993-06-11011 June 1993 Forwards Background Info on St Lucie & Turkey Point,For Use in Preparing for 930624 Visit W/Chairman & Commissioners ML20062H6631990-11-28028 November 1990 Request for Hearing & Petition for Leave to Intervene Re Proposed License Amend.* Forwards Tj Saporito Request for Hearing & Licensee & NRC Responses,For Appropriate Action, Per 10CFR2.772(j) ML20062H6691990-11-28028 November 1990 Informs of Info Re ACRS Subcommittee on Reactor Operations Consideration of Issues Concerning Plant TS Replacement ML20058A3521990-10-16016 October 1990 Forwards AEOD/T90-14, Seal Problems in Boric Acid Transfer Pumps, Which Occurred at Facility ML20059M6021990-09-26026 September 1990 Svc of Ltr to Parties Turkey Point Memorandum & Order .* Requests That Encl Author to C Michelson of ACRS Be Served on Parties to Proceeding.Served on 900927 ML20059M6241990-09-25025 September 1990 Forwards Opinion LBP-90-32 for ACRS to Consider Whether Applicant & Staff Conducted Review in Sufficient Depth to Assure That New Tech Specs Conform to Peculiarities of Reactor.W/O Encl.W/Certificate of Svc.Served on 900927 ML20059C4551990-08-29029 August 1990 Forwards Amends 137 & 132 to Licenses DPR-31 & DPR-41, Respectively,Issued on 900828 & Safety Evaluation ML20056A4071990-08-0101 August 1990 Advises That Listed Members of Aslab,Including TS Moore, Ha Wilber & GP Bollwerk Assigned to Serve as Aslab for OL Amend Proceeding.Related Correspondence ML20055D8151990-06-21021 June 1990 Informs That Je Moore Will Represent NRC at 900710 Oral Argument ML20247A2601989-09-0505 September 1989 Forwards Bj Elliot Affidavit Re NRC Response to Ctr for Nuclear Responsibility & J Lorion First Set of Discovery Requests,Filed on 890829.Agenda Ref in Response to Interrogatory 17 Also Encl.Related Correspondence ML20246N4061989-08-31031 August 1989 Advises That Accompanying NRC Staff Response Contained Typo.Corrected Docket Numbers Stated.Related Correspondence ML20246J6811989-08-29029 August 1989 Forwards NRC Response to Ctr for Nuclear Responsibility & J Lorion First Set of Discovery Requests & Bj Elliot & GE Edison Affidavits.Related Correspondence ML20246F5321989-08-28028 August 1989 Forwards Staff Response to Ctr for Nuclear Responsibility & J Lorion First Set of Discovery Requests to Nrc.Executed Affidavit Will Be Served on ASLB Upon Return of Bj Elliot, Who Is Currently on Travel & Unavailable to Sign ML20245E6861989-04-24024 April 1989 Advises That NRC Does Not Intend to Respond to Tj Sapporito 890406 Statement for Consideration as Petition for Leave to Intervene ML20235S0201989-01-12012 January 1989 Forwards Petitioner Requests for Disallowance of Licensee to Bring Unit 3 & 4 Reactors Critical,Until Both Internal & NRC Safety Investigation Completed ML20154S5321988-09-30030 September 1988 ALAB-898.* Corrected Memorandum Advising That Time for Commission to Review Decision ALAB-898 Expired.Commission Declined Review & Decision Became Final Agency Action on 880927.Served on 881003 ML20245B5961988-08-0909 August 1988 Forwards Inadequate NPSH in HPSI Sys in Pwrs, Engineering Evaluation Rept.Issue Similar to AEOD Rept on NPSH Problems in Low Head Safety Sys ML20197D9661988-05-27027 May 1988 Advises That Author Provided Assignment to J Lorion & M Young & Names Added to OLA-2 Svc List.Order of Appeal Board Served on 880527 on All Parties.Served on 880527 ML20197E0631988-05-26026 May 1988 Informs That Listed Members of ASLAP Assigned to Serve as Aslab for Spent Fuel Pool Expansion Proceeding ML20238D3921987-12-24024 December 1987 Forwards NRC Proposed Findings of Fact & Conclusion of Law, List of Proposed Transcript Corrections & Proposed Findings on Floppy Diskette in Ascii Format.W/O Diskette ML20237E4561987-12-21021 December 1987 Informs That Time Provided for Commission to Review ALAB-878 Expired.Commission Declined Any Review.Decision Became Final Agency Action on 871214.Served on 871221 ML20237B6471987-11-0606 November 1987 Forwards Aslab 871104 Decision ALAB-878,affirming on Sua Sponte Review of ASLB Grant of Summary Disposition of Contention (B) in OL Amend Proceeding ML20154S3031987-09-30030 September 1987 ALAB-898.* Advises That Time for Commission to Review Decision ALAB-898 Expired.Commission Declined Review & Decision Became Final Agency Action on 870927.Served on 880930 ML20234B5111987-09-15015 September 1987 Notification of 871006-08 Meetings W/Util in Bethesda,Md to Discuss Proposed Tech Specs Re Safety Limits & Instrumentations (Sections 2.0 & 3/4.3) ML20238F2801987-09-10010 September 1987 Forwards NRC Info Notice 87-043, Gaps in Neutron-Absorbing Matl in High-Density Spent Fuel Storage Racks, for Info. List of Plants W/Boraflex Structures in Spent Fuel Pool & List of Recent Info Notices Encl.Related Correspondence ML20238E5441987-09-0202 September 1987 Forwards Testimony of J Wing,Ce Mccracken & LI Kopp Re Contention 6 Concerning Spent Fuel Pool Expansion.Related Correspondence ML20237L7801987-08-31031 August 1987 Forwards Testimony of SB Kim & DG Mcdonald Re Contention 5 & Testimony of Cd Sellers Concerning Contention 6 (Spent Fuel Pool Matls Other than Boraflex).Testimony on Contention 6 to Be Dispatched on 870902.Related Correspondence ML20215J7311987-06-17017 June 1987 Provides List of NRC Witnessess Testifying at Hearings Scheduled to Begin on 870915 to Consider Contentions 5 & 6 Re Spent Fuel Pool Amend ML20216C6851987-06-12012 June 1987 Summary of 870609 Operating Reactors Events Meeting 87-018 W/Nrr,Res,Aeod & Regional Ofcs on Events Which Occurred Since 870602 Meeting.List of Attendees Encl ML20206T3441987-04-20020 April 1987 Notifies That Author Temporary Replacement for M Young as Counsel 1998-08-08
[Table view] Category:MEMORANDUMS-CORRESPONDENCE
MONTHYEARML20236Y6301998-08-0808 August 1998 Forwards Monthly Rept Reflecting Status of 10CFR2.206 Petitions as of 980731.Petitions on Plant GT97494 & GT97339 for Which DD Became Final Actions During Month Were Closed. Portion of Encl Withheld ML20237A0011998-08-0707 August 1998 Informs That Extension Granted on Envirocare Decision of 980904.Two Week Extension on Philadelphia VA Decision of 980828 Requested.Submits Concurrence of Changes.Rept on 2.206 July Status for Plants Encl ML20248L8621998-06-0909 June 1998 Forwards May 1998 Rept on Status of Public Petitioners Under 10CFR2.206.Petition on Seabrook (GT970873) for Which DD 98- 03 Became Final Agency Decision on 980413 Closed.Attachment 3 Withheld ML20205M3331997-07-28028 July 1997 Provides Final Agenda for Region II Enforcement Meeting to Be Held on 970730.OI Attendance Requested for Issue Involving Termination of Turkey Point Radwaste Operator Who Failed to Follow Procedure ML20148F7201997-05-30030 May 1997 Forwards Semiannual Status Rept on Fire Protection Task Action Plan & plant-specific Thermo-Lag Correction Action Programs ML20138J2611997-04-29029 April 1997 Informs That on 970421,name of Docketing & Svc Branch of Ofc of Secretary Was Changed to Rulemakings & Adjudications Staff.New Mailing Address,Fax Number & e-mail Address Submitted.W/Certificate of Svc.Served on 970429 ML20137F9371997-03-20020 March 1997 Submits Listed Question to Be Addressed by Noon 970321 ML20136A9241997-02-28028 February 1997 Partially Withheld Memo Discussing drop-in Visit of J Broadhead,Chairman & CEO FPL Group & Chairman & CEO FP&L Co & J Goldberg ML20138G4131996-11-12012 November 1996 Requests Technical assistance,TIA-019,re Discrepancies Between Containment Radiation Monitoring Sys Described in Usfar & Regulatory Guide 1.45 at Plants ML20129K2631996-11-0707 November 1996 Forwards Hearing File for Rl Tetrick Proceeding,Index & Notice of Appearance,Iaw Schedule Established in Memorandum & Order, ML20138G3651996-11-0505 November 1996 Requests That Listed Info Be Forwarded to Licensee in Connection W/Unescorted Access Visits to Plant by Listed NRC Contractor Employees During 961118-970110 for Purpose of Assisting NRC in Conduct of Design Insp.Partially Deleted ML20129D5301996-10-0707 October 1996 Forwards Request for Hearing Submitted by Rl Tetrick ML20135A2381996-10-0404 October 1996 Informs That Licensee Requested Courtesy Visit for T Plunkett.Meeting Scheduled for 961121 ML20136C8201995-10-10010 October 1995 Provides Summary of Discussion & Staff Actions Re 950921 Plant Performance Review.List of Participants,Changes to Mip & Matrix Trend Charts Encl ML20136A8451995-06-0505 June 1995 Partially Withheld Memo Discussing Directors Decision 95-07 Which Denies Petitioners Request for Various Enforcment Actions Against Florida Power & Light & Its Employees ML20134B5661995-04-0606 April 1995 Responds to 950201 Memo Re Request for Exemptions to N+1 Policy ML20137R9521995-03-22022 March 1995 Informs That Plant Performance Review of Listed Plants Was Held on 950316 ML20134C2181994-10-12012 October 1994 Summarizes 941011 Meeting W/Util to Discuss Items of Mutual Interest Re Operations at Util Nuclear Stations for Plants ML20137L8531994-07-18018 July 1994 Submits List of Generic Issues Arising from Plan Changes for Turkey Point & St Lucie,Per 940718 Telcon ML20134Q3341993-06-25025 June 1993 Informs That J Goldberg Met W/Chairman Selin to Discuss Whistleblowers ML20137P7191993-06-11011 June 1993 Forwards Background Info on St Lucie & Turkey Point,For Use in Preparing for 930624 Visit W/Chairman & Commissioners ML20062H6631990-11-28028 November 1990 Request for Hearing & Petition for Leave to Intervene Re Proposed License Amend.* Forwards Tj Saporito Request for Hearing & Licensee & NRC Responses,For Appropriate Action, Per 10CFR2.772(j) ML20062H6691990-11-28028 November 1990 Informs of Info Re ACRS Subcommittee on Reactor Operations Consideration of Issues Concerning Plant TS Replacement ML20058A3521990-10-16016 October 1990 Forwards AEOD/T90-14, Seal Problems in Boric Acid Transfer Pumps, Which Occurred at Facility ML20059M6021990-09-26026 September 1990 Svc of Ltr to Parties Turkey Point Memorandum & Order .* Requests That Encl Author to C Michelson of ACRS Be Served on Parties to Proceeding.Served on 900927 ML20059M6241990-09-25025 September 1990 Forwards Opinion LBP-90-32 for ACRS to Consider Whether Applicant & Staff Conducted Review in Sufficient Depth to Assure That New Tech Specs Conform to Peculiarities of Reactor.W/O Encl.W/Certificate of Svc.Served on 900927 ML20059C4551990-08-29029 August 1990 Forwards Amends 137 & 132 to Licenses DPR-31 & DPR-41, Respectively,Issued on 900828 & Safety Evaluation ML20056A4071990-08-0101 August 1990 Advises That Listed Members of Aslab,Including TS Moore, Ha Wilber & GP Bollwerk Assigned to Serve as Aslab for OL Amend Proceeding.Related Correspondence ML20055D8151990-06-21021 June 1990 Informs That Je Moore Will Represent NRC at 900710 Oral Argument ML20247A2601989-09-0505 September 1989 Forwards Bj Elliot Affidavit Re NRC Response to Ctr for Nuclear Responsibility & J Lorion First Set of Discovery Requests,Filed on 890829.Agenda Ref in Response to Interrogatory 17 Also Encl.Related Correspondence ML20246N4061989-08-31031 August 1989 Advises That Accompanying NRC Staff Response Contained Typo.Corrected Docket Numbers Stated.Related Correspondence ML20246J6811989-08-29029 August 1989 Forwards NRC Response to Ctr for Nuclear Responsibility & J Lorion First Set of Discovery Requests & Bj Elliot & GE Edison Affidavits.Related Correspondence ML20246F5321989-08-28028 August 1989 Forwards Staff Response to Ctr for Nuclear Responsibility & J Lorion First Set of Discovery Requests to Nrc.Executed Affidavit Will Be Served on ASLB Upon Return of Bj Elliot, Who Is Currently on Travel & Unavailable to Sign ML20246D8841989-06-19019 June 1989 Staff Requirements Memo Re 890601 Briefing on Operating Reactors & Fuel Facilities in Rockville,Md.Commission Expressed Disappointment in Long Term Operating Performance of Turkey Point Nuclear Power Plant ML20247F3921989-05-17017 May 1989 Staff Requirements Memo Re Commission 890510 Briefing in Rockville,Md on Status of Operator License Requalification Exams.Operator Training Program at Turkey Point Should Be Closely Monitored & Rept Submitted at Next Meeting ML20245E6861989-04-24024 April 1989 Advises That NRC Does Not Intend to Respond to Tj Sapporito 890406 Statement for Consideration as Petition for Leave to Intervene ML20235S0201989-01-12012 January 1989 Forwards Petitioner Requests for Disallowance of Licensee to Bring Unit 3 & 4 Reactors Critical,Until Both Internal & NRC Safety Investigation Completed ML20154S5321988-09-30030 September 1988 ALAB-898.* Corrected Memorandum Advising That Time for Commission to Review Decision ALAB-898 Expired.Commission Declined Review & Decision Became Final Agency Action on 880927.Served on 881003 ML20245B5961988-08-0909 August 1988 Forwards Inadequate NPSH in HPSI Sys in Pwrs, Engineering Evaluation Rept.Issue Similar to AEOD Rept on NPSH Problems in Low Head Safety Sys ML20197D9661988-05-27027 May 1988 Advises That Author Provided Assignment to J Lorion & M Young & Names Added to OLA-2 Svc List.Order of Appeal Board Served on 880527 on All Parties.Served on 880527 ML20197E0631988-05-26026 May 1988 Informs That Listed Members of ASLAP Assigned to Serve as Aslab for Spent Fuel Pool Expansion Proceeding ML20238D3921987-12-24024 December 1987 Forwards NRC Proposed Findings of Fact & Conclusion of Law, List of Proposed Transcript Corrections & Proposed Findings on Floppy Diskette in Ascii Format.W/O Diskette ML20237E4561987-12-21021 December 1987 Informs That Time Provided for Commission to Review ALAB-878 Expired.Commission Declined Any Review.Decision Became Final Agency Action on 871214.Served on 871221 ML20237B6471987-11-0606 November 1987 Forwards Aslab 871104 Decision ALAB-878,affirming on Sua Sponte Review of ASLB Grant of Summary Disposition of Contention (B) in OL Amend Proceeding ML20154S3031987-09-30030 September 1987 ALAB-898.* Advises That Time for Commission to Review Decision ALAB-898 Expired.Commission Declined Review & Decision Became Final Agency Action on 870927.Served on 880930 ML20234B5111987-09-15015 September 1987 Notification of 871006-08 Meetings W/Util in Bethesda,Md to Discuss Proposed Tech Specs Re Safety Limits & Instrumentations (Sections 2.0 & 3/4.3) ML20238F2801987-09-10010 September 1987 Forwards NRC Info Notice 87-043, Gaps in Neutron-Absorbing Matl in High-Density Spent Fuel Storage Racks, for Info. List of Plants W/Boraflex Structures in Spent Fuel Pool & List of Recent Info Notices Encl.Related Correspondence ML20238E5441987-09-0202 September 1987 Forwards Testimony of J Wing,Ce Mccracken & LI Kopp Re Contention 6 Concerning Spent Fuel Pool Expansion.Related Correspondence ML20237L7801987-08-31031 August 1987 Forwards Testimony of SB Kim & DG Mcdonald Re Contention 5 & Testimony of Cd Sellers Concerning Contention 6 (Spent Fuel Pool Matls Other than Boraflex).Testimony on Contention 6 to Be Dispatched on 870902.Related Correspondence ML20215J7311987-06-17017 June 1987 Provides List of NRC Witnessess Testifying at Hearings Scheduled to Begin on 870915 to Consider Contentions 5 & 6 Re Spent Fuel Pool Amend 1998-08-08
[Table view] Category:NRC TO ASLP
MONTHYEARML20247A2601989-09-0505 September 1989 Forwards Bj Elliot Affidavit Re NRC Response to Ctr for Nuclear Responsibility & J Lorion First Set of Discovery Requests,Filed on 890829.Agenda Ref in Response to Interrogatory 17 Also Encl.Related Correspondence ML20246N4061989-08-31031 August 1989 Advises That Accompanying NRC Staff Response Contained Typo.Corrected Docket Numbers Stated.Related Correspondence ML20246J6811989-08-29029 August 1989 Forwards NRC Response to Ctr for Nuclear Responsibility & J Lorion First Set of Discovery Requests & Bj Elliot & GE Edison Affidavits.Related Correspondence ML20246F5321989-08-28028 August 1989 Forwards Staff Response to Ctr for Nuclear Responsibility & J Lorion First Set of Discovery Requests to Nrc.Executed Affidavit Will Be Served on ASLB Upon Return of Bj Elliot, Who Is Currently on Travel & Unavailable to Sign ML20245E6861989-04-24024 April 1989 Advises That NRC Does Not Intend to Respond to Tj Sapporito 890406 Statement for Consideration as Petition for Leave to Intervene ML20154S5321988-09-30030 September 1988 ALAB-898.* Corrected Memorandum Advising That Time for Commission to Review Decision ALAB-898 Expired.Commission Declined Review & Decision Became Final Agency Action on 880927.Served on 881003 ML20197D9661988-05-27027 May 1988 Advises That Author Provided Assignment to J Lorion & M Young & Names Added to OLA-2 Svc List.Order of Appeal Board Served on 880527 on All Parties.Served on 880527 ML20238D3921987-12-24024 December 1987 Forwards NRC Proposed Findings of Fact & Conclusion of Law, List of Proposed Transcript Corrections & Proposed Findings on Floppy Diskette in Ascii Format.W/O Diskette ML20154S3031987-09-30030 September 1987 ALAB-898.* Advises That Time for Commission to Review Decision ALAB-898 Expired.Commission Declined Review & Decision Became Final Agency Action on 870927.Served on 880930 ML20238F2801987-09-10010 September 1987 Forwards NRC Info Notice 87-043, Gaps in Neutron-Absorbing Matl in High-Density Spent Fuel Storage Racks, for Info. List of Plants W/Boraflex Structures in Spent Fuel Pool & List of Recent Info Notices Encl.Related Correspondence ML20238E5441987-09-0202 September 1987 Forwards Testimony of J Wing,Ce Mccracken & LI Kopp Re Contention 6 Concerning Spent Fuel Pool Expansion.Related Correspondence ML20237L7801987-08-31031 August 1987 Forwards Testimony of SB Kim & DG Mcdonald Re Contention 5 & Testimony of Cd Sellers Concerning Contention 6 (Spent Fuel Pool Matls Other than Boraflex).Testimony on Contention 6 to Be Dispatched on 870902.Related Correspondence ML20215J7311987-06-17017 June 1987 Provides List of NRC Witnessess Testifying at Hearings Scheduled to Begin on 870915 to Consider Contentions 5 & 6 Re Spent Fuel Pool Amend ML20206T3441987-04-20020 April 1987 Notifies That Author Temporary Replacement for M Young as Counsel ML20214C9071986-02-19019 February 1986 Forwards Legible Copy of Jn Ridgely Prof Qualifications Originally Filed in Connection W/Nrc 860218 Response to Licensee Motion for Summary Disposition.Related Correspondence ML20137N9741986-01-30030 January 1986 Discusses Util to NRC Re Completion of Spent Fuel Pool Cooling Sys Upgrade During End of Cycles 11 & 12 for Units 3 & 4,respectively.NRC 860123 Response Accepting Util Inservice Test Program Encl.Related Correspondence ML20140D1261986-01-24024 January 1986 Forwards 860114 Order Imposing Civil Penalty in Amount of $100,000 on Licensee for Violation Concerning Operation of Spent Fuel Pool Cooling Sys.Related Correspondence ML20138R0701985-12-16016 December 1985 Forwards for Info,Nrc 851206 Response & Util 851113 Request for Withdrawal of Request for NRC Review of Reanalysis of Spent Fuel Rack Modules W/Fuel Loaded Only in Overhanging Rows.Related Correspondence ML20137G9131985-11-25025 November 1985 Forwards Testimony of Y Hsii Re Contention (D) for 851210 Hearing.Related Correspondence ML20135E3101985-09-12012 September 1985 Forwards 850727 Board Notification 85-081 Concerning Allegations by Former Westinghouse Employee Re Certain Westinghouse Analyses & Qa.Related Correspondence ML20209F3371985-07-10010 July 1985 Forwards Region II 850701 Memo Stating That Amends Authorizing Reracking of Spent Fuel Pools Issued in Compliance W/Nrc Regulations & Consistent W/Commission Policy.Related Correspondence 1989-09-05
[Table view] |
Text
5 0.
/ 'o,, UNITED STATES
". 8 o NUCLEAR REGULATORY COMMISSION - ^
3 p WASHINGTON, D. C. 20555 ~
....
- December 16, 1985 Mpy Dr. Robert M. Lazo, Chairman Dr. Richard F. Cole Administrative Judge Administrative Judge Atomic Safety and Licensing Board Atomic GafeR gnd o big ing Board U.S. Nuclear Regulatory Commission U.S. Nuclear RegulAto Commission Washington, DC 20555 Washington, DC 20555 D% n. o ,
Dr. Emmeth A. Luebke ashg-Administrative Judge Atomic Safety and Licensing Board U.S. Nuclear Regulatory Commission Washington, DC 20555 In the Matter of FLORIDA POWER AND LIGHT COMPANY (Turkey Point Plant, Unit Nos. 3 and 4)
Docket Nos. 50-250, 50-251 OLA-2 (SFP Expansion)
Dear Adminis,
trative Judges:
Enclosed for your information is a copy of a December 6,1985 letter from the NRC Staff to Florida Power and Light Company (Licensee) which relates to the amendment allowing expansion of the spent fuel. pool storage capacity.
The Staff's letter is in response to a Licensee letter dated November 13, 1985 (also enclosed) indicating that Licensee has withdrawn its request for NRC review of a reanalysis of the spent fuel rack modules with fuel loaded only in the overhanging rows. The Staff states that administrative controls initiated prior to fuel loading in the affected racks preclude any fuel rack lift-off during a seismic event and that the technical analysis supporting the amendment and the conclusions in the Staff's Safety Evaluation remain valid. Consequently, the Staff will take no further action on Licensee's initial request.
I Copies of this letter and its enclosures are also being distributed to the l
parties. Copies of Licensee's original request for NRC Staff review were sent to the Board and parties by letter of Staff counsel, dated February 28, 1985, and more recently by letter of Licensee counsel, dated November 18, 1985.
Sincerely, 8512300355 851216 -
ADOCK 0500 0 j; e l {DR Mi r.i. . Young Counsel for NRC Staff l
Enclosures:
As stated l
l cc w/encls: Joette Lorion Harold F. Rais cc w/o encls: Remainder of service list
M1, l
}u
,6 at ,
UNITED STATES 8 o NUCLEAR REGULATORY COMMISSION ,
- 7. j WASHINGTON, D. C. 20556
\,*****/ DEC 0 61985 Docket Nos. 50-250 and 50-251 Mr. J. W. Williams, Jr., Group Vice President Nuclear Energy Department Florida Power and Light Company Post Office Box 14000 Juno Beach, Florida 33408
Dear Mr. Williams:
j
Reference:
TAC Numbers 56805 and 56808
SUBJECT:
SPENT FUEL STORAGE FACILITY By letter dated November 13, 1985, you have withdrawn your February 1, 1985, request for NRC review of a reanalysis of the spent fuel rack modules with only overhanging rows loaded with fuel. You further indicated that fuel placement in the new spent fuel racks will be controlled in accordance with the bases supporting amendments 111 and 105 to the operating licenses for the Turkey Point Plant Units 3 and 4. respectively, as stated in your February 1, 1985, letter.
l As indicated in our letter of February 26, 1985, the NRC staff's Safety Evaluation and supporting Technical Evaluation Report conclusions in support of amendments 111 and 105 remain valid due to the administrative controls initiated when you
? became aware of the potential need for the controls. These controls, which were initiated prior to any fuel loading in the affected racks, preclude the possibility of any separation of the rack modules from the pool liner floor during a seismic event. You have indicated that any changes will be reviewed in accordance with the provisions of 10 CFR 50.59. Should your review indicate that a technical specification change is required or an unreviewed safety question exists, you will request NRC review and approval in accordance with 10 CFR 50.59(c).
Therefore, based on the above, we will take no action on your initial request and close out the above referenced TAC numbers.
Sincerely, N $
aniel G. Mcdonald, Project Manager PWR Project Directorate #2, NRR
4 i .
. l.,
J. W. Williams, Jr. Turkey Point Plants Florida Power and Light Company Units 3 and 4 cc: Harold F,. Reis, Esquire Administrator Newman and Holtzinger P.C. Department of Environmental 1615 L Street, N.W. Regulation Washington, DC 10036 Power Plant Siting Section State of Florida Mr. Jack Shreve 2600 Blair Stone Road Office of the Public Counsel Tallahassee, Florida 32301 Room 4 Holland Building Tallahassee, Florida 32304 James P. O'Reilly Regional Administrator, Region II Norman A. Coll, Esquire U.S. Nuclear Regulatory Comission Steel. Hector and Davis Suite 2900 4000 Southeast Financial 101 Marietta Street Center Atlanta, GA 30303 i Miami, Florida 33131-2398 Martin H. Hodder, Esquire Mr. Ken N. Harris, Vice President 1131 N. E. 86th Street Turkey Point Nuclear Plant Miami, Florida 33138 Florida Power and Light Company P.O. Box 013100 Joette Lorion Miami, Florida 33101 7269 SW 54 Avenue Miami, Florida 33143 Mr. M. R. Stierheim County Manager of Metropolitan Mr. Chris J. Baker, Plant Manager Dade County Turkey Point Nuclear Plant Miami, Florida 33130 Florida Power and Light Company P.O. Box 013100 Resident Inspector Miami, Florida 33101 Turkey Point Nuclear Generating Station U.S. Nuclear Regulatory Comission Attorney General Post Office Box 57-1185 Department of Legal Affairs Miami, Florida 33257-1185 The Capitol Tallahassee, Florida 32304 <
Regional Radiation Representative EAP Region IV Mr. Allan Schubert, Manager 345 Courtland Street, N.W. Public Health Physicist Atlanta, GA 30308 Department of Health and Rehabilitative Services Intergovernmental Coordination 1323 Winewood Blvd.
and Review Tallahassee, Florida 32301 Office of Planning & Budget Executive Office of the Governor The Capitol Building ,
Tallahassee, Florida 32301 '
.. P O c0114000. JUNO SC ACH.rL 03406 i *
~
)
FLORIDA POWWER & LIGHT COMPANY my i a em
~
L-85 409 :
Office of Nuclear Reactor Regulation Attention: Mr. Steven A. Vorgo, Chief Operating Reactors Bronch il Division of Licensing U. S. Nuclear Regulatory Commission Washington, D.C. 20555 Deor Mr. Vorgo:
Re: Turkey Point Units 3 and 4 i
' Docket Nos. 50-250 and 50-251 I Spent Fuel Storoge Focility NRC TAC Nos. 56805 ond 56808 !
By letter dated February 1,1985, FPL requested WC review of a reonalysis of the spent fuel rock modules with only overhonging rows fooded with fuel. Mr. D. -
G. Mcdonald's letter of February 26,1985 stated that the FPL request for review (
of the reonalysis represented a change in a basis supporting Amendments lII and 105 to the operating licenses for Turkey Point Units 3 and 4 respectively, and that FPL could make such changes without prior WC approval provided that a review performed in accordance with the provisions of 10 CFR 50.59 determined that neither on explicit technical specificotton change nor on unreviewed safety question is involved.
On the basis of Mr. Mcdonald's letter, FPL withdrows its February I,1985 request. As stated in our February I letter, fuel placement in the new spent fuel rocks will be controlled in occordonce with the bosis supporting Amendments li t and 105. Any change to that basis will be reviewed in accordance with the provisions of 10 CFR 50.59. Should a 10 CFR 50.59 review indicate that a i technical specification change is required or on unreviewed safety question exists, s FPL will request tEC approval in occordonce with 10 CFR 50.59(c).
Very truly yours, !*
. d g'@. GrW. s,Jr.
i e President Nuclear Energy JWW/TCG/ cob cc Horold F. Reis, Esquire Dr. J. Nelson Croce, NRC Region 11 TCG3/006/l PEOPLE ...sERvlNG PEOPLE