ML20214C907

From kanterella
Jump to navigation Jump to search
Forwards Legible Copy of Jn Ridgely Prof Qualifications Originally Filed in Connection W/Nrc 860218 Response to Licensee Motion for Summary Disposition.Related Correspondence
ML20214C907
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 02/19/1986
From: Wagner M
NRC OFFICE OF THE EXECUTIVE LEGAL DIRECTOR (OELD)
To: Cole R, Lazo R, Luebke E
Atomic Safety and Licensing Board Panel
References
CON-#186-145 OLA-2, NUDOCS 8602210321
Download: ML20214C907 (3)


Text

-_

UNITED STATES NUCLEAR REGULATORY CC.'"ilSSION MO i ,{' ,# g

E  ? WASHINGTON, D. C. 205bb t f 00CMETED

%, .....f February 19, 1986 USNRC

'86 FEB 20 P1 :51 0FFICE OF $Ef tfa '

00CKETit4G 4 5E?vif.i:

Dr. Robert M. Lazo, Chairman Dr. Richard F. Cole BRANCH Administrative Judge Administrative Jtidge Atomic Safety and Licensing Board Atomic Safety and Licensing Board U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission Washington, DC 20555 Washington, DC 20555 Dr. Emmeth A. Luebke Administrative Judge Atomic Safety and Licensing Board U.S. Nue! car Regulatory Commission Washington, DC 20555 In the Matter of FLORIDA POWER AND LIGHT COMPANY (Turkey Point Plant, Unit Nos. 3 and 4)

Docket Nos. 50-250, 50-251 OLA 2 (SFP Expansion)

Dear Administrative Judges:

It has come to my attention that the professional qualifications of John N.

Ridgely, filed in connection with the NRC Staff's February 18, 1986 response to Licensee's motion for summary disposition, did not reproduce in a legible fashion . Enclosed please find legible copies of Mr. Ridgely's professional qualifications.

Copies of the enclosed qualifications are being sent to the parties to this proceeding by means of this letts

  • Siricerely, l (M ( h/O' Wagner Mary F/' for NRC Staff Counst!

ec w/ encl: Service List 8602210321 860219 PDR ADOCK 05000250 Q PDR

h PROFESSIONAL QUALIFICATIONS JOHN N. RIDGELY PLANT SYSTEMS BRANCH DIVISION OF BWR LICENSING I am employed as a Mechanical Engineer (Auxiliary Systems) in the Plant Systems Branch, Division of BWR Licensing, Office of Nuclear Reactor Regulation, United States Nuclear Regulatory Commission, Washington, D.C. My duties consist of reviewing and evaluating the associated safety consideration on nuclear power and fuel handling systems and c.ssoci at ed engineering fields on power reactors. I am responsible for providing technical input to various documents includ-ing Safety Evaluation Reports.

I attended the Virgini a Polytechnic Institute in Blacksburg, Virginia and received a D.S. degree in Nuclear Science in 1972.

In July of 1972 I joined the Philadelphia Electric Company's Mechanical Engineering Division as a mechanical engineer.

  • At the Philadelphia Electric Company, I worked with both fossil and nuclear power plants. I designed systems, prepared specifica-tionc, performed computer analysis, and managed contracts. During this time I developed and had patented a process for removing tritium from High Temperature Gas Cooled Reactors. I wrote purchase order I specifications for high density spent fuel storage racks for Peach Bottom Atomic Power Station, reviewed the bids, awarded the contract, and performed a field audit at the manufacturer's facility. I also performed the preliminary work for the high density spent fuel storage racks for Limerick Generating Station.

From August 1977 through November 1980, I was employed by the Potomac Electric Power Company in Washington, D.C., as a mechanical engineer. During this time, I worked exclusively with fcccil power plants. My duties in this position were similar to those at Philadelphia Electric Company. In addition, I have design water treatment cubsystems and assisted in other system desions including water intake and diccharge treatment cystemc.

From December 1980 to the present, I have been employed by the United States Nuc1 car Regulatory Commicsion. I have been in the Auxiliary Systems Branch of the Division of Systems Integration until November 24, 1985 when NRR was reorganized and I have been ancigned to the Plants Systems Branch, Division of BWR Licensing. I have revised portions of the Standard Review Plan and have been the Tack Manager for the reuclution of two Generic Issues. My dutics include safety reviews and evaluations of cyntem deciqn and operation at nuclear power plant facilitieu. As required, I prepare safety evalua-tions and make presentations to the Advisory Committee on Reactor Saf eguar'd s. I am prouently managinn a contract for subcompartment i

'M

')

environmental analysis and reviewing applications for operating li-conses, proposed technical specifications, and cpent fuci pool expan-sions. Todate, I have reviewed the desiga of the spent fuel storage facilities for 11 reactor sites and have performed the analytical review for six additional facilities. This represents 21 spent fuel storage f acilities.

k t

2