ML20136C353

From kanterella
Revision as of 10:02, 19 June 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Safety Evaluation Accepting Util Responses to Generic Ltr 83-28,Items 3.1.3 & 3.2.3 Re post-maint Testing Requirements in Existing Tech Specs for Reactor Trip Sys Components
ML20136C353
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 11/12/1985
From: Varga S
Office of Nuclear Reactor Regulation
To: Mcdonald R
ALABAMA POWER CO.
Shared Package
ML20136C358 List:
References
GL-83-28, NUDOCS 8511210079
Download: ML20136C353 (3)


Text

I November 12, 1985

. Docket Nos. 50-348 DISTRIBUT-ION and 50-364 Docket F1 UL) NRC PDR ORB #1 Rdg Gray File L PDR HThompson OELD EJordan Mr. R.~ P. Mcdonald BGrimes JPartlow Senior Vice President EReeves(2) ACRS 10 Alabama Power Company CParrish J. Basurto Post Office Box 2641 R. Karsch Birmingham, Alabama 35291

Dear Mr. Mcdonald:

SUBJECT:

COMPLETION OF REVIEW FOR ITEMS 3.1.3 AND 3.2.3 0F GENERIC LETTER 83-28 FOR JOSEPH M. FARLEY NUCLEAR PLANT UNITS 1 AND 2 Your submittals relating to the post-maintenance testing requirements in existing Technical Specifications for reactor trip system components and for all other safety related components have been reviewed. Our subcontractor, EG8G Idaho, Inc., conducted the technical review.

Based on the review, the enclosed Safety Evaluation ras been prepared, We conclude that the Items 3.1.3 and 3.2.3 of Generic Lotter 83-28 are acceptable as discussed in the evaluation. No response is required to this

- letter. ,

Sincerely, Donald C. Fithcer for

/s/ Steven A. Varga Steven A. Varga, Chief Operating Reactors Branch #1 Division of Licensing

Enclosure:

i As stated cc:

See next page

. *SEE PREVIOUS WHIT ONCURR -

ORB #1:DL* OR B DL CParrish .ER ves;ps SVarg 11/12/85 11/p/85 11/ga/85 8511210079 851112 PDR ADOCK 05000348 P PDR . . . _

w-----___--_-_--_

. Docket Nos. 50-348 DISTRIBUTION and 50-364 Docket File NRC PDR ORB #1 Rdg Gray File L PDR HThompson OELD EJordan -

Mr. R. P. Mcdonald BGrimes JPartlow /

Senior Vice President EReeves(d ACRS 10 /

Alabama Power Company CParrish J. Basurto Post Office Box 2641 R. Karsch Birmingham, Alabama 35291

Dear Mr,

Mcdonald:

SUBJECT:

COMPLETION OF REVIEW FOR ITEMS 3.1.3 AND 3.2.) 0F GENERIC LETTER 83-28 FOR JOSEPH M. FARLEY NUCLEAR PLANT UNI $ 1 AND 2 You submittals relating to the post-maintenance test ng requirements in existing Technical Specifications for reactor tri system components and for all other safety related components have be revie>:ed. Our subcontractor, EG&G Idaho, Inc., conducted the technical revi .

Based on the review, the enclosed Safety Eva ation has been prepared. We conclude that the Items 3.1.3 and 3.2.3 of/ Generic Letter 83-28 are acceptable as discussed in the evaluatio ' No response is required to this letter.

Sincerely, Steven A. Varga, Chief

/

/ Operating Reactors Branch #1 Division of Licensing p

Enclosure:

As stated

/

cc: /

See next page /

t /

,/

~

r

/

ORB # BC-0RB#1:DL ORB CP.,,,s N/lb85

  1. 1:Det ,R..v.s .s V.,g.

1$//85 1(/M85 1

', , Mr. R. P. Mcdonald Alabama Power Company Joseph M. Farley Nuclear Plant cc:

Mr. W. O. Whitt D. Biard MacGuineas Esquire Executive Vice President Volpe, Boskey and Lyons Alabama Power Company 918 16th Street, N.W.-

Post Office Box 2641 Washington, DC 20006 Birmingham, Alabama 35291 Mr. Louis B. Long, General Manager Alabama Electric Corporation Southern Company Services, Inc. Post Office Box 550 Post Office Box 2625 Andalusia, Alabama 36420 Birmingham, Alabama 35202

_- - Chairman Regional Administrator, Region II Houston County Comission U.S. Nuclear Regulatory Comission Dothan, Alabama 36301 101 Marietta Street, Suite 2900 Atlanta, Georgia 30303 George F. Trowbridge, Esquire Shaw, Pittman, Potts and Trowbridge Ira L. Myers, M.D.

1800 M. Street, N.W. State Health Officer Washington, DC 20036 State Department of Public Health State Office Building Robert A. Buettner, Esquire Balch, Bingham, Baker, Hawthorne, Mr. J. D. Woodard Williams and Ward General Manager - Nuclear Plant Post Office Box 306 Post Office Box 470 Birmingham, Alabama 35201 Ashford, Alabama 36312 Resident Inspector U.S. Nuclear Regulatory Comission Post Office Box 24 - Route 2 Columbia, Alabama 36319 State Department of Public Health ATTN: State Health Officer State Office Building Montgomery, Alabama 36104

__ __ _ __ _ _ _ _ -