ML20115D935

From kanterella
Revision as of 20:47, 16 May 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Advises That Util Still in Process of Obtaining Lists of Hfa Relays Discussed in Feb 1985 Ltr,In Response to IE Bulletin 84-02.Lists Will Be Available by 850531
ML20115D935
Person / Time
Site: River Bend Entergy icon.png
Issue date: 04/09/1985
From: Booker J
GULF STATES UTILITIES CO.
To: Martin R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
IEB-84-02, IEB-84-2, RBG-20643, NUDOCS 8504190150
Download: ML20115D935 (1)


Text

GULF STATES UTILITIES COMPANY POST OFFICE 00X 2951

  • BEAUMONT, TEXAS 777o4 A R E A C O D E 713 838'-6631 April 9, 1985 RBG 20643 File Nos. G9.5, G9.33.1 Mr. Robert D. Martin, Regional Administrator U. S. Nuclear Regulatory Commission P
  • B DMM  %

Region IV, Office of Inspection and Enforcement :j f 611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76011 APR I S 1985

Dear Mr. Martin:

River Bend Station - Unit 1 Docket.No. 50-458 I&E Bulletin 84-02 In a letter (GSU/Weigand to NRC/ Martin, RBG-20043) dated February 1, 1985 Gulf States Utilities Company (GSU) committed to provide additional information concerning I&E Bulletin 84-02 by April 5, 1985. Currently, CSU is still in the process of obtaining the lists of HFA relays as discussed in the February : letter. It is anticipated that these lists will be available by May 31, 1985. At that time GSU will provide an interim of-final status report.

If you have_any questions feel free to contact me.

Sincerely,

f. E. W J. E. Booker Manager-Engineering, Nuclear Fuels & Licensing River Bend Nuclear Group JEB/Mk p cc: D. Chamberlain (SRI)

U. S.' NRC' Document Control Desk vne#

' 8504190150 850409 PDR G

ADOCK 05000450

\

\

6 t0 c .

PDR ;

, -