ML20117E618

From kanterella
Revision as of 18:30, 15 May 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Seismic Safe Shutdown Equipment List for PBAPS Units 2 & 3, USI A-46 Relay Evaluation Rept for PBAPS Units 2 & 3 & Seismic Evaluation Rept for PBAPS, in Response to GL 87-02/USI A-46
ML20117E618
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 05/07/1996
From: Hunger G
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20117E624 List:
References
REF-GTECI-A-46, REF-GTECI-SC, TASK-A-46, TASK-OR GL-87-02, GL-87-2, NUDOCS 9605160267
Download: ML20117E618 (3)


Text

_ _ _ . . . _ - - ~ _ . . - _ ._ . ._ _.__.._._ __.-m _ _ _ . . . _ _ _ . __ . _ _ _ .

.. Station Support Depcrtment A

PECO NUCLEAR no se- c-v Nuclear Group Headquarters i A UMT of PECO ENacy 965 Chesterbrook Boulevard -

Wayne. PA 19087-5691  ;

May 7,1996 i l

l Docket Nos. 50-277 ,

50-278 License Nos. DPR-44 DPR-56 l

U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 2055E 3

SUBJECT:

Peach Bottom Atomic Power Station, Units 2 and 3  :

Summary Report for Resolution of Unresolved Safety issue (USI) A-46  !

Dear Sir:

In Generic Letter (GL) 87-02, " Verification of Seismic Adequacy of Mechanical and Electrical Equipment in Operating Reactors, Unresolved Safety issue (USI) A-46," the NRC Staff set forth the process for resolution of USl A-46 and encouraged the affected licensees to participate in a generic program. In Supplement 1 to GL 87-02, which transmitted the Supplemental Safety Evaluation Report No. 2 (SSER-2) on Seismic Qualification Utility Group (SOUG) Generic Implementation Procedure, Revision 2, (GIP-2), the Staff required a response to include a commitment to the gip-2, ,

a schedule for the implementation of the GIP, and submission of a report summarizing the results of  !

the USl A-46 program. ,

By letter to the NRC Staff dated September 18,1992, as supplemented by letter dated September 5 29,1995, PECO Energy Company committed to implement GIP-2, including the clarifications, ,

interpretations, and exceptions in SSER-2, and to communicate to the NRC Staff any significant or programmatic deviations from GlP guidance. PECO Energy agreed to submit the results of the USl A-46 evaluation by May 31,1996.  ;

i This letter forwards the results of the USl A-46 evaluation for the Peach Bottom Atoreic Power  !

Station (PBAPS), Units 2 and 3. This letter also confirms that no significant or prograrnmatic

  • deviations from the GIP guidance were made during the USl A-46 resolution procese. The conclusions in the attached reports are based on a design freeze date of Novemuer 1,1992, and on >

walkdowns that were performed principally between 1993 and 1995. l t

USl A-46 Reoorts i

Section 1.2.2.8 of GIP-2 requires that a piarospecific Summary Report be submitted to the NRC Staff, ,

! Including a proposed schedule for future modifications and replacements of those outliers which are I yet to be resolved. Further, GIP-2 Section 11.9 provides for Safe Shutdown Equipment Ust (SSEL),

l Relay Evaluation, Seismic Evaluation, and Completion Reports.

960516026I960507 PDR ADOCK 05000277 P PDR [I h

If

  • May 7,1996 Page 2 Attachment 1 is the Safe Shutdown Equipment List (SSEL) Report, Attachment 2 is the Relay Evaluation Report, and Attachment 3 is the Seismic Evaluation Report. This letter, and its attachments, constitutes the Summary Report. The Completion Report will be submitted when all the planned actions for resolution of USl A-46 outliers have been completed.

In the SSEL Report (Attachment 1), plant electrical and mechanical equipment were selected for evaluation under the USl A-46 program and included in the SSEL in accordance with the provisions of GlP-2, Section 3. The SSEL report also includes verification of the compatibuity of the SSEL with plant operating procedures. The Relay Evaluation Report (Attachment 2), provides the information suggested by GIP-2, Part 2, Section 9.3. The Seismic Evaluation Report (.Mtachment 3), provides the information sug0ested by GIP-2, Part 2, Section 9.4.

OJiiers Outliers, as defined by GIP-2, were identified during the walkdowns. These outliers and their resolutions are described in detaR in the attached reports. Whue many outliers have been resolved, the remainder require physical or administrative actions. Because some of these actions require a unit outage, all outlier resolutions wRl be completed by December 31,2000.

j If you have any questions concoming this submittal please contact us.

Sincerely, G. A. Hunger, Jr.,

Director - Licensing

) Enclosures

Affidavit, Attachments: 1) Safe Shutdown Equipment List for PBAPS

? 2) Relay Evaluation Report for PBAPS

3) Seismic Evaluation Report for PBAPS
cc
T. T. Martin, Administrator, USNRC, Region I W. L Schmidt, Senior Resident inspector, USNRC, PBAPS 4

]

l l

1 l

A

- . . .. _ - . = - - . . . - . .-- -. . . - - . . - --.

COUNTY OF CHESTER  :

D. B. Fetters, being first duly swom, deposes and says:

That he is Vice President of PECO Energy Company; the applicant herein; that he has read the attached response for the resolution of Unresolved Safety issue (USI) A-46, and knows the contents thereof; and that the statements and matters set forth therein are true and correct to the best of his knoWedge, information and belief.

lA

> k

~ Vice President I

Subscribed and swom to before me this day of / 1996.

A abli Notarygublic Notarial Seal Mary Lou Skrocki. Notary Public Tredyffrin Twp., Chester County My Comm;ssion Expires May 17,1990 t, . 5:r, Peerr#ntn.a Azulton of f t'..

l l

Peach Bottom Atomic Power Station Units 2 and 3 i

Seismic Safe Shutdown Equipment List '

PECO Energy Co.

May,1996

-