ML20080K398

From kanterella
Revision as of 18:15, 21 April 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Rev 0 to Diablo Canyon Unit 1 Idvp Verification of Corrective Action,Turbine Bldg, Interim Technical Rept 56
ML20080K398
Person / Time
Site: Diablo Canyon Pacific Gas & Electric icon.png
Issue date: 09/20/1983
From: Denison E
ROBERT L. CLOUD ASSOCIATES, INC.
To: Harold Denton, Maneatis G, Martin J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V), Office of Nuclear Reactor Regulation, PACIFIC GAS & ELECTRIC CO.
Shared Package
ML20080K401 List:
References
P105-4, NUDOCS 8309290143
Download: ML20080K398 (2)


Text

ROBERT L CLOUD ASSOCI ATES. INC.

i25 UNIVERSITY AVENUE BERKELEY. CALIFORNIA 94710

.4 si.4i. 2es P105-4 September 20, 1983 Mr. G. H. Meneatis, Executive Vice President Facilities and Electric Resources Development Pacific Gas and Electric Company 77 Beale Street San Francisco, CA 94106 Mr. H. E~. Denton, Director Office of Nuclear Reactor Regulation U. S. Nu,, clear Regulatory Commission Washington, D. C. 20555 .

Mr. J. d. Martin, Regional Administrator Region V U. S. Nuclear Regulatory CorJmission -

1#50 Maria Lane, suite 210 Walnut Creek, CA 94596 ,

4 I Docket No. 50-275 Diablo Canyon Unit 1 4

License No. DPR-76

~ ~

3 Gentlemen:

Enclosed please find Interim Technical Report #56, Turbine Building, Revision 0 issued by Robert L. Cloud and Associates, Inc., for the Independent Design Verification Program (P105 4-839-056).

Yours truly, Edward Denison Ow l

Enclosure cc: R. Fray M. Strumwasser R. Reedy J. Reynolds/J. Phillips F. Sestak D. Fleischaker @gP W. Cooper B. Norton U jf 'l H. Schierling A. Hubbard l J. Roesset M. Axelrad A. Gehr -

8309290143 830920 .

ED/act PDR ADOCK 05000275 PDR

' ggg/4 R QT" $3L

ROBERT L. CLOUD ASSOCIATES. INC. ,

ins umvras:TY AVENUE sanneuv.cau onwiAenio i4:si 4i.enn .

P105 4 September 20, 1983 Mr. G. H. Maneatis, Executive Vice President Facilities and Electric Resources Development Pacific Gas and Electric Company 77 Beale Street 94106 San Francisco, CA Mr. H.'R. Denton, Director Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C. 20555 ,

Mr. J. B.-Martin, Regional Administrator Region V -

U. S. Nuclear Regulatory Commission 1450 Maria Lane, Suite 210 Walnut ~ Creek, CA 94596 ,,

Docket No. 50-275 Diablo Canyon Unit 1 License No. DPR-76

~~ Gentlemen:

Enclosed please find Interim Technical Report #56, Turbine Building, Revision 0 issued by Robert L. Cloud and Associates, Inc., for the Independent Design Verification Program (P105 4-839-056).

Yours truly, Edward Denison

- Enclosure ,

I i

cc: R. Fray M. Strumwasser I

R. Reedy J. Reynolds/J. Phillips F. Sestak D. Fleischaker W. Cooper B. Norton H. Schierling A. Hubbard M. Axelrad J. Roesset A. Gehr

. ED/act _ _ _ _ . _ . . _ _

_ _ _ _ . _ . . _ _ _ _ . . _ . _ _ . _ _ _ _ . _ _ _ _ - . . _ . _ _ _ . _ _.